Housing violations · East Harlem (North)
413 East 114 Street, Manhattan
10029 · 28 apartments · 6 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
13 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs59
- Peeling paint and plaster55
- Broken doors or locks19
- Missing smoke or CO detector16
- Plumbing, sinks and toilets15
- Leaks and water damage10
- Mold10
- Roaches9
- Mice or rats7
- No heat or hot water3
- Lead paint2
- Bedbugs1
- Electrical problems1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 25 closed · NYC typical: 87 days
from 78 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at stoop, 1st storyIssued Oct 22, 2026 · fix by Nov 5, 2026 overdue · Violation #19317620
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at the bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309440
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from northIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309330
- BOther repairsProvide escutcheon plate at steam riser at the ceiling in the 1st room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309486
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309485
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the wash basin in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309482
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall and ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309481
- BOther repairsProvide escutcheon plate at steam riser at the ceiling in the 4th room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309478
- COther repairs& 309 m/d law abate the nuisance consisting of drop ladder landing obstructed by garbage bags of recycling material in rear yardIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309289
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door at building entrance at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19309274
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309361
- BPlumbing, sinks and toiletsRepair the broken or defective plastered surfaces and paint in a uniform color the east wall under the sink cabinet in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309365
- BLeaks and water damageRepair the leaky and/or defective faucets at the wash basin in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309368
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling of the closet in the 3rd room from northIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309374
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from northIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309380
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19309388
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the west wall in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309401
- BOther repairsProperly repair with similar material the broken or defective caulking at the north wall in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309403
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309406
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline at the wash basin in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309407
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19309411
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309412
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309415
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309426
- COther repairsProperly repair or replace the broken or defective glass pane at upper sash window in the bathroomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309431
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yardIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309286
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309277
- BOther repairsProperly repair or replace the broken or defective light switch at south wall in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309339
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309439
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 3rd room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309448
- CPlumbing, sinks and toiletsProperly repair or replace the broken or defective faucet in the bathtub in the bathroomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309444
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceilng in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309472
- COther repairs& 309 m/d law abate the nuisance consisting of (2) propane tanks in the west passageway at fire passage wayIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309572
- BOther repairsFire egress defective. remove the obstruction in fireproof passageway bicycles at west passageway at fire passage wayIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19309568
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at the sink in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309535
- COther repairsProperly repair or replace the broken or defective glass pane at the upper sash window in the kitchenIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309534
- BOther repairsProperly repair or replace the broken or defective sping balance at the upper and lower sash window in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309532
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective mechanical stopper in the bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309531
- BLeaks and water damageRepair the leaky and/or defective faucets faucet in the bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309530
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at the west wall in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309529
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at the bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19309528
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash of 2nd window from west at north in the 1st room from northIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309526
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309469
- COther repairsCleanse and disinfect to the satisfaction of this department after removing the accumulated fecal matter in the west yardIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19309285
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at fire exit to east yard at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19309275
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at entrance door to the cellarIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19309291
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at boiler room doorIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19309292
- COther repairsProperly repair or replace the broken or defective marble tread, 7th from the bottom at public hall stairs, 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309297
- COther repairsFire escape defective. replace with new the broken, defective and/or missing 14th tread from bottom of 5th story balcony stairs, at west exterior wall fire…Issued Oct 19, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19309301
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west wall at public hall, 6th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309303
- BOther repairsProperly repair or replace the broken or defective light fixture at the ceiling at public hall, 4th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309305
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles at public hall, 2nd storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309306
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309309
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309466
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at the bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309310
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the 1st room from north at westIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309313
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309464
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall behind radiator in the 4th room from north at eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309454
- BOther repairsProperly repair or replace the broken or defective light switch at west wall in the foyerIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309319
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall and east wall in the 1st room from north at eastIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19309320
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.