Housing violations · East Harlem (North)
237 East 115 Street, Manhattan
10029 · 23 apartments · 6 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs33
- Peeling paint and plaster31
- Broken doors or locks27
- Missing smoke or CO detector17
- Roaches16
- Leaks and water damage15
- Mice or rats12
- Plumbing, sinks and toilets10
- No heat or hot water6
- Mold5
- Electrical problems4
- Lead paint2
- Missing window guards1
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 15 closed · NYC typical: 87 days
from 5 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty lock assembly at front entrance door to buildingIssued Nov 16, 2026 · Violation #19374893
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344019
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344017
- COther repairsProperly repair with similar material the broken or defective wood at floor in the 3rd room from northIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19344010
- COther repairsProperly repair with similar material the broken or defective wood at floor in the private hallwayIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19344002
- BElectrical problemsProperly repair or replace the broken or defective cover plate at ground fault circuit interrupter (g.f.c.i.) electrical outlet at south wall in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19343977
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood at sink base cabinet floor in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19343958
- BMoldTrace and repair the source and abate the visible mold condition greater than 1o square feet at the north wall and the ceiling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345222
- BOther repairsProperly repair or replace the broken or defective bell / buzzer / intercom system at building entranceIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344052
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood countertop at sink base cabinet in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344048
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19343940
- COther repairsProperly repair with similar material the broken or defective cerramic tile at floor in the bathroomIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19343946
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective at entrance in the entranceIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19343890
- CBroken doors or locksProperly repair or replace the broken or defectiveIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19343894
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 530th storyIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19343919
- BBroken doors or locksProperly repair or replace the broken or defective latch set at building entrance door. at public hall, 530th storyIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19343921
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19343930
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19343935
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19343942
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320373
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320372
- BBroken doors or locksReplace with new the missing door at closet at west wall in the 4th room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320934
- BOther repairsProperly repair or replace the broken or defective glass at upper window sash at the 1st window from north at east in the 4th room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320933
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at 1st window from west at north in the 1st room from north at westIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320932
- BBroken doors or locksProperly repair or replace the broken or defective base cabinet doors at east wall in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320931
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tile in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320930
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320929
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320928
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320927
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320926
- BMoldTrace and repair the source and abate the visible mold condition more then 10 sqft but less then 30 sqft at ceiling observed in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320925
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320376
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320375
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320374
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19220404
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19220405
- BBroken doors or locksProperly repair or replace the broken or defective latch set at building entrance door at public hall, 1st storyIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19220409
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance door at public hall, 1st storyIssued Sep 15, 2026 · fix by Sep 29, 2026 overdue · Violation #19220408
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19130736
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19130733
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19130734
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130735
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130730
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at ceiling in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130731
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket seal at refrigerator door in the kitchenIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130732
- BBroken doors or locksProperly repair or replace the broken or defective latch set at building entrance door , 1st storyIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18819348
- BOther repairsProperly repair or replace the broken or defective bell buzzer and return intercom system at building front to panel at south wall in the 4th room from northIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787348
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 15, 2026 · fix by Apr 15, 2026 overdue · rent impairing · Violation #18787358
- BOther repairsReplace with new the missing escutcheon plate at heat riser pipe in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787353
- BBroken doors or locksProperly repair or replace the broken or defective latch set at vestibule door at public hall, 1st storyIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18793004
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Apr 15, 2026 · fix by Apr 21, 2026 overdue · Violation #18787361
- BBroken doors or locksReplace with new the missing entrance door in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787357
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 15, 2026 · fix by Apr 15, 2026 overdue · rent impairing · Violation #18787360
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787355
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787356
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787362
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787363
- CLead paintProperly repair or replace the broken or defective lockset at building entrance door leading to 1st floor public hallIssued Dec 16, 2025 · fix by Dec 22, 2025 overdue · Violation #18503306
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 3, 2025 · fix by Oct 29, 2025 overdue · Violation #18270649
- BOther repairsProperly repair or replace the broken or defective bell/buzzer/intercom system from building entrance to the panel at east wall in the private hallwayIssued Oct 3, 2025 · fix by Nov 7, 2025 overdue · Violation #18270646
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.