Housing violations · East Harlem (North)
238 East 116 Street, Manhattan
10029 · 28 apartments · 6 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Roaches11
- Mice or rats8
- Broken doors or locks7
- Mold6
- No heat or hot water4
- Other repairs3
- Lead paint3
- Leaks and water damage2
- Bedbugs1
- Peeling paint and plaster1
- Plumbing, sinks and toilets1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 14 closed · NYC typical: 87 days
from 22 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st storyIssued Jun 18, 2026 · fix by Jul 2, 2026 overdue · Violation #19013968
- BBroken doors or locksProperly repair or replace the broken or defective latch set at vestibule door. at public hall, 1st storyIssued Jun 18, 2026 · fix by Jul 23, 2026 overdue · Violation #19013969
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall in the bathroomIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18981468
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 27, 2026 · fix by Apr 26, 2026 overdue · rent impairing · Violation #18812296
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Apr 27, 2026 · fix by May 3, 2026 overdue · Violation #18812294
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 13, 2026 · fix by Feb 13, 2026 overdue · rent impairing · Violation #18640302
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Feb 13, 2026 · fix by Feb 19, 2026 overdue · Violation #18640304
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tile in the 2nd room from northIssued Feb 13, 2026 · fix by Mar 20, 2026 overdue · Violation #18640303
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 12, 2026 · fix by Feb 11, 2026 overdue · rent impairing · Violation #18633821
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 11, 2026 · fix by Feb 11, 2026 overdue · rent impairing · Violation #18633823
- CBroken doors or locksProvide ready access to buildings heating system door lock at cellar at boiler roomIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18633822
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the bathroomIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18608180
- CLead paintProperly repair or replace the broken or defective latch set at building entrance door leading to 1st floor public hall , 1st storyIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · Violation #18608182
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the bathroomIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18608179
- BOther repairsAbate the nuisance consisting of pests. evidence of spiders infestation in the entire apartmentIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18608177
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 2, 2026 · fix by Feb 28, 2026 overdue · Violation #18608176
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · Violation #18608175
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at the door leading to fire escape window in the 1st room from northIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · Violation #18608181
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from northIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17072170
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17072162
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Jul 14, 2023 · fix by Jul 28, 2023 overdue · Violation #16091213
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 14, 2023 · fix by Aug 9, 2023 overdue · Violation #16091212
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 17, 2023 · fix by Jun 12, 2023 overdue · Violation #15986229
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 28, 2023 · fix by May 24, 2023 overdue · Violation #15941183
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 28, 2023 · fix by May 24, 2023 overdue · Violation #15941184
- BMoldTrace and repair the source and abate the visible mold condition approxiamately 8 square feet at ceiling and south wall in the bathroomIssued Jan 4, 2023 · fix by Feb 8, 2023 overdue · Violation #15651370
- BMoldTrace and repair the source and abate the visible mold condition approxiamately 6 square feet at ceiling in the bathroomIssued Jan 4, 2023 · fix by Feb 8, 2023 overdue · Violation #15651368
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 18, 2022 · fix by Dec 14, 2022 overdue · Violation #15518757
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 17, 2022 · fix by Dec 13, 2022 overdue · Violation #15517752
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 17, 2022 · fix by Dec 13, 2022 overdue · Violation #15517758
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 17, 2022 · fix by Dec 13, 2022 overdue · Violation #15517751
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 17, 2022 · fix by Dec 13, 2022 overdue · Violation #15517757
- CMice or ratsAbate the infestation consisting of rodents rats in the entire apartmentIssued Mar 15, 2022 · fix by Apr 10, 2022 overdue · rent impairing · Violation #15036516
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 15, 2022 · fix by Apr 10, 2022 overdue · Violation #15036517
- CMice or ratsAbate the infestation consisting of miceIssued Feb 22, 2022 · fix by Mar 20, 2022 overdue · Violation #14888740
- CRoachesAbate the infestation consisting of roachesIssued Feb 22, 2022 · fix by Mar 20, 2022 overdue · Violation #14888737
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 11, 2022 · fix by Feb 6, 2022 overdue · Violation #14776161
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 11, 2022 · fix by Feb 6, 2022 overdue · Violation #14776162
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Jan 15, 2021 · fix by Feb 19, 2021 overdue · Violation #13986083
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Jan 15, 2021 · fix by Feb 19, 2021 overdue · Violation #13986084
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 17, 2020 · fix by Oct 13, 2020 overdue · Violation #13778999
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2020 · fix by Oct 13, 2020 overdue · Violation #13779001
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 17, 2020 · fix by Oct 13, 2020 overdue · Violation #13779000
- BMoldTrace and repair the source and abate the visible mold condition on the ceiling and the east wall in the bathroomIssued Aug 21, 2019 · fix by Sep 25, 2019 overdue · Violation #13238088
- BPlumbing, sinks and toiletsReplace with new the missing wash basin in the bathroomIssued May 1, 2018 · fix by Jun 5, 2018 overdue · Violation #12361678
- BElectrical problemsProperly repair the broken or defective electrical outlet at north wall in the 3rd room from northIssued Feb 26, 2018 · fix by Apr 2, 2018 overdue · Violation #12253659
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 21, 2008 · fix by Mar 18, 2008 overdue · Violation #7155285
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.