Housing violations · East Harlem (North)
310 East 116 Street, Manhattan
10029 · 9 apartments · 4 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs13
- Broken doors or locks12
- Peeling paint and plaster8
- Lead paint8
- No heat or hot water6
- Mice or rats5
- Roaches5
- Plumbing, sinks and toilets5
- Leaks and water damage2
- Missing smoke or CO detector2
- Mold1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 8 closed · NYC typical: 87 days
from 18 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksProvide ready access to buildings heating system door is locked at 1st story public hall to basement at boiler roomIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19277556
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Jan 29, 2026 · fix by Feb 4, 2026 overdue · Violation #18602124
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 29, 2026 · fix by Jan 29, 2026 overdue · rent impairing · Violation #18602120
- BMoldTrace and repair the source and abate the visible mold condition less then 10 sqft at west wall in the bathroomIssued Apr 21, 2025 · fix by May 26, 2025 overdue · Violation #17843690
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 25, 2025 · fix by Mar 21, 2025 overdue · Violation #17722397
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall and the ceiling in the 2nd room from northIssued Feb 24, 2025 · fix by Mar 31, 2025 overdue · Violation #17710320
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from northIssued Feb 24, 2025 · fix by Mar 31, 2025 overdue · Violation #17710319
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 24, 2025 · fix by Mar 22, 2025 overdue · Violation #17710323
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Feb 24, 2025 · fix by Mar 10, 2025 overdue · Violation #17710322
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the 1st room from northIssued Feb 24, 2025 · fix by Mar 10, 2025 overdue · Violation #17710321
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 20, 2025 · fix by Mar 18, 2025 overdue · Violation #17704217
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Feb 20, 2025 · fix by Mar 6, 2025 overdue · Violation #17704219
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 20, 2025 · fix by Mar 18, 2025 overdue · Violation #17704218
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall and the ceiling in the kitchenIssued Feb 5, 2025 · fix by Mar 12, 2025 overdue · Violation #17670621
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the kitchenIssued Feb 5, 2025 · fix by Mar 12, 2025 overdue · Violation #17670620
- BBroken doors or locksProperly repair with similar material the broken or defective wood wash basin cabinet doors and base in the bathroomIssued Feb 5, 2025 · fix by Mar 12, 2025 overdue · Violation #17670625
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at wash basin in the bathroomIssued Feb 5, 2025 · fix by Mar 12, 2025 overdue · Violation #17670624
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall and the ceiling in the 2nd room from northIssued Feb 5, 2025 · fix by Mar 12, 2025 overdue · Violation #17670622
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 5, 2025 · fix by Mar 3, 2025 overdue · Violation #17670626
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 5, 2025 · fix by Mar 1, 2025 overdue · Violation #17676779
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 17, 2025 · fix by Feb 12, 2025 overdue · Violation #17623595
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 17, 2025 · fix by Feb 12, 2025 overdue · Violation #17623596
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 13, 2025 · fix by Jan 12, 2025 overdue · rent impairing · Violation #17614091
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 13, 2025 · fix by Jan 12, 2025 overdue · rent impairing · Violation #17614092
- CBroken doors or locksProvide ready access to buildings heating system door lock to basement at boiler roomIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17614093
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 29, 2024 · fix by Dec 25, 2024 overdue · Violation #17481683
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 29, 2024 · fix by Dec 25, 2024 overdue · Violation #17481682
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 10, 2024 · fix by Jun 14, 2024 overdue · Violation #16958830
- BOther repairsProvide an adequate supply of gas to the fixtures gas range in the kitchenIssued May 10, 2024 · fix by Jun 14, 2024 overdue · rent impairing · Violation #16958829
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing wthin 15 feet of sleeping unit in the entire apartmentIssued May 10, 2024 · fix by Jun 14, 2024 overdue · Violation #16958831
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tile grout at all bathtub walls in the bathroomIssued May 10, 2024 · fix by Jun 14, 2024 overdue · Violation #16958832
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 31, 2023 · fix by Apr 24, 2023 overdue · Violation #15895750
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 31, 2023 · fix by Apr 24, 2023 overdue · Violation #15895751
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 31, 2023 · fix by Apr 24, 2023 overdue · Violation #15895749
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 31, 2023 · fix by Apr 24, 2023 overdue · Violation #15895752
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 31, 2023 · fix by Apr 24, 2023 overdue · Violation #15895753
- BLead paintFire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 4th storyIssued Mar 28, 2023 · fix by May 2, 2023 overdue · Violation #15845299
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Mar 28, 2023 · fix by Apr 3, 2023 overdue · Violation #15845306
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Mar 28, 2023 · fix by Mar 27, 2023 overdue · rent impairing · Violation #15845305
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at the west and north wall at public hall, 4th storyIssued Mar 28, 2023 · fix by May 2, 2023 overdue · Violation #15845297
- CBroken doors or locksProvide ready access to buildings heating system lock room at boiler roomIssued Dec 27, 2022 · fix by Jan 2, 2023 overdue · Violation #15628668
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 27, 2022 · fix by Dec 27, 2022 overdue · rent impairing · Violation #15628667
- COther repairsProvide ready access to buildings heating system no access ro boiler room at boiler roomIssued Aug 19, 2021 · fix by Aug 25, 2021 overdue · Violation #14490878
- CBroken doors or locksProvide ready access to buildings heating system door to cellar was locked at public hall, 1st storyIssued Aug 16, 2021 · fix by Aug 22, 2021 overdue · Violation #14497728
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the ceiling at public hall, 1st storyIssued May 25, 2021 · fix by Jun 29, 2021 overdue · Violation #14163538
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 25, 2021 · fix by Jun 20, 2021 overdue · Violation #14163535
- COther repairsProvide ready access to buildings heating system at cellar at boiler roomIssued Feb 1, 2021 · fix by Feb 7, 2021 overdue · Violation #13944829
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature 161 degrees fahrenheit at all fixtures in the entire apartmentIssued Nov 16, 2020 · fix by Nov 22, 2020 overdue · Violation #13835080
- BOther repairsProperly repair with similar material the broken or defective eroded mortar joints at 3 and 4 sty south wall south yardIssued Feb 25, 2020 · fix by Mar 31, 2020 overdue · Violation #13609703
- BOther repairsProperly repair with similar material the broken or defective flashing at east and west parapet wall at roofIssued Feb 24, 2020 · fix by Mar 30, 2020 overdue · Violation #13609755
- CRoachesAbate the infestation consisting of roachesIssued Jun 5, 2019 · fix by Jun 26, 2019 overdue · Violation #13103367
- BOther repairsProperly repair with similar material the broken or defective eroded stucco from 4th down to 1st story at exterior wall at east yardIssued Apr 4, 2017 · fix by May 9, 2017 overdue · Violation #11718735
- BOther repairsProperly repair with similar material the broken or defective wall with cracked, loose, and missing mortar at parapet wall, northwest section, at front areawayIssued Feb 27, 2017 · fix by Apr 3, 2017 overdue · Violation #11663567
- BPlumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections kitchen and bathroom at cellar of duplex apartmentIssued Mar 5, 2012 · fix by Apr 9, 2012 overdue · Violation #9347462
- BPlumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at duplex cellar level , bathroom createdIssued Jul 16, 2007 · fix by Aug 20, 2007 overdue · Violation #6835706
- BPlumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at duplex cellar level , kitchen createdIssued Jul 16, 2007 · fix by Aug 20, 2007 overdue · Violation #6835701
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.