Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (North)

411 East 118 Street, Manhattan

10035 · 40 apartments · 6 stories · City Council district 8

By · Updated · Data from NYC HPD

C
27open immediately hazardous violations · 68 per 100 apartments
B52Hazardous, open
A15Non-hazardous, open
!94Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company411 East 118 LLC
Landlord (head officer or owner)Mark Furman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    30
  2. Other repairs
    26
  3. Broken doors or locks
    9
  4. Leaks and water damage
    6
  5. Lead paint
    6
  6. Roaches
    5
  7. Plumbing, sinks and toilets
    4
  8. No heat or hot water
    2
  9. Electrical problems
    2
  10. Missing smoke or CO detector
    2
  11. Bedbugs
    1
  12. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C74 days
from 13 closed · NYC typical: 87 days
B109 days
from 7 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at west yardIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19064750
  • C
    Other repairsProperly repair with similar material the broken or defective 2nd metal tread from bottom up at staircase at west yardIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19073425
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073406
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the kitchenIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · rent impairing · Violation #19064745
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · rent impairing · Violation #19064746
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064744
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective hinges at door leading to west yard at public hall, 1st storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19064748
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latchset at south bulkhead door at public hall, 6th storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19064753
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latchset at north bulkhead door at public hall, 6th storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19064754
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items. at 2nd story balcony ,first stack from west at…Issued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19002706
  • B
    Other repairsReplace with new the missing top and bottom eschuchen plates at ceiling and floor in the 1st room from east at centerIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18826026
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at centerIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18826024
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at northIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18826023
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 1, 2026 · fix by May 15, 2026 overdue · Violation #18826027
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at centerIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18826025
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18700099
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall at closet in the private hallwayIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18625967
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18625966
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18625965
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective hinges at door leading to west yard at public hall, 1st storyIssued Jan 20, 2026 · fix by Feb 3, 2026 overdue · Violation #18569558
  • B
    Other repairsRefit upper window sash at west wall in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18569557
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north at eastIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18569552
  • B
    Other repairsProperly secure the loose upper wall cabinet at east wall in the kitchenIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18569553
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tiles at west and north walls in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18569554
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18569555
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from north at westIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18569556
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 2, 2025 · fix by Jun 28, 2025 overdue · Violation #17930697
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 22, 2025 · fix by Jun 17, 2025 overdue · Violation #17909040
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued May 22, 2025 · fix by May 22, 2025 overdue · rent impairing · Violation #17909039
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 22, 2025 · fix by Jun 5, 2025 overdue · Violation #17909041
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 19, 2025 · fix by Jun 2, 2025 overdue · Violation #17900674
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective hinges at fire door leading to the west yard at public hall, 1st storyIssued May 19, 2025 · fix by Jun 2, 2025 overdue · Violation #17900676
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 19, 2025 · fix by Jun 14, 2025 overdue · Violation #17900675
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 14, 2025 · fix by Jun 9, 2025 overdue · Violation #17887889
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the foyerIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17887890
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 14, 2025 · fix by May 28, 2025 overdue · Violation #17887887
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at tub in the bathroomIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17887888
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the 4th room from eastIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17887886
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the kitchenIssued May 14, 2025 · fix by May 13, 2025 overdue · rent impairing · Violation #17887891
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective door frame in the entranceIssued Nov 4, 2024 · fix by Nov 18, 2024 overdue · Violation #17389998
  • B
    Other repairsProperly repair or replace the broken or defective window at east in the 3rd room from eastIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389997
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 2, 2024 · fix by Jul 8, 2024 overdue · rent impairing · Violation #17086948
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color jambs, header, and stool at window at north wall in the 2nd room from northIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927985
  • B
    Other repairsProperly secure the loose escutcheon plate at heat riser in the 2nd room from northIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927983
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at wash basin in the bathroomIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927982
  • B
    Plumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927981
  • B
    Plumbing, sinks and toiletsReplace with new the missing wash basin mechanical drain stopper in the bathroomIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927980
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927978
  • B
    Other repairsRefit lower and upper window sashes at 1st window from east at south wall in the 3rd room from northIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927976
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927988
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash 2nd window from east at south wall in the 3rd room from northIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927974
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection wash basin waste pipe in the bathroomIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927979
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927977
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from northIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16937986
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16927987
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 2nd room from northIssued Apr 27, 2023 · fix by Jun 1, 2023 overdue · Violation #15937668
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Apr 27, 2023 · fix by Jun 1, 2023 overdue · Violation #15937667
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the bathroomIssued Apr 27, 2023 · fix by Jun 1, 2023 overdue · rent impairing · Violation #15937666
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 2nd room from northIssued Apr 27, 2023 · fix by Jun 1, 2023 overdue · rent impairing · Violation #15937669
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective west door leading to basement from public hall at public hall, 1st storyIssued Dec 12, 2022 · fix by Dec 26, 2022 overdue · Violation #15580799

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

572017
842018
322019
12021
252022
122023
282024
142025
332026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 420 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.