Housing violations · East Harlem (North)
215 East 121 Street, Manhattan
10035 · 24 apartments · 6 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs10
- Mice or rats5
- Peeling paint and plaster5
- Roaches4
- Mold2
- Plumbing, sinks and toilets2
- Broken doors or locks2
- Missing smoke or CO detector2
- Leaks and water damage1
- No heat or hot water1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 9 closed · NYC typical: 87 days
from 3 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 9, 2026 · fix by Oct 5, 2026 overdue · Violation #19200990
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 9, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19200989
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 24, 2026 · fix by Sep 19, 2026 overdue · rent impairing · Violation #19148291
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 12, 2026 · fix by Sep 7, 2026 overdue · rent impairing · Violation #19135436
- COther repairsCleanse and disinfect to the satisfaction of this department after removing the backed up sewage through out at cellarIssued Aug 12, 2026 · fix by Aug 18, 2026 overdue · rent impairing · Violation #19135437
- BOther repairsProperly repair or replace the broken or defective ceiling light fixture at public hall, 4th storyIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19135492
- BOther repairsProperly repair or replace the broken or defective imtercom system in the entire apartmentIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19135613
- BLeaks and water damageRepair the roof so that it will not leak above ceiling at bulkhead, roofIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · rent impairing · Violation #18730826
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling at public hall, 2nd storyIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18730841
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color cieling in the bathroomIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18730783
- CMoldTrace and repair the source and abate the visible mold condition 4 sq ft at ceiling 2 sq ft at north wall 4 sq ft at east wall in the bathroomIssued Mar 20, 2026 · fix by Apr 15, 2026 overdue · Violation #18731581
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at westIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18730815
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead, roofIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18730830
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline pipe at sink in the kitchenIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18730790
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in bathtub in the bathroomIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · rent impairing · Violation #18730785
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling at public hall, 3rd storyIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18730839
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective fire door hinges at 1st public hall bulkhead from east, 6th storyIssued Sep 16, 2024 · fix by Sep 30, 2024 overdue · Violation #17271407
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15726480
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15726479
- BOther repairsProperly repair the broken or defective bell and buzzer return system from building entranceIssued Feb 21, 2023 · fix by Mar 28, 2023 overdue · Violation #15726481
- BOther repairsProperly repair the broken or defective bell and buzzer system from building entrance toIssued Jan 18, 2023 · fix by Feb 22, 2023 overdue · Violation #15665411
- BNo heat or hot water& 309 m/d law abate the nuisance consisting of leak at hot water tank at boiler roomIssued Nov 2, 2022 · fix by Dec 7, 2022 overdue · Violation #15465985
- BOther repairsProperly repair the broken or defective bell buzzer intercom system from the building entrance to the apartment wall panel , 1st storyIssued Nov 2, 2022 · fix by Dec 7, 2022 overdue · Violation #15465941
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 1, 2021 · fix by Dec 27, 2021 overdue · Violation #14708133
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 1, 2021 · fix by Dec 27, 2021 overdue · Violation #14708134
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 12, 2021 · fix by Nov 7, 2021 overdue · Violation #14619100
- BBroken doors or locksProperly repair the broken or defective bell buzzer intrecom system from the building entrance door to the apartment wall panel in the entire apartmentIssued Jan 28, 2021 · fix by Mar 4, 2021 overdue · Violation #14005073
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 21, 2019 · fix by Apr 11, 2019 overdue · Violation #12970667
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 21, 2019 · fix by Apr 11, 2019 overdue · Violation #12970668
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint wood frame entrance to bathroom 3 sty southeastIssued Dec 26, 1989 · fix by Jan 15, 1990 overdue · Violation #2597651
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.