Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (North)

243 East 123 Street, Manhattan

10035 · 10 apartments · 5 stories · City Council district 8

By · Updated · Data from NYC HPD

C
50open immediately hazardous violations · 500 per 100 apartments
B65Hazardous, open
A15Non-hazardous, open
!129Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

27 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyOld Harlem Road, LP
Landlord (head officer or owner)Walter Roberts

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    30
  2. Peeling paint and plaster
    21
  3. Leaks and water damage
    16
  4. No heat or hot water
    16
  5. Broken doors or locks
    14
  6. Missing smoke or CO detector
    14
  7. Plumbing, sinks and toilets
    11
  8. Mold
    8
  9. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C199 days
from 39 closed · NYC typical: 87 days
B320 days
from 9 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling and west wall in the bathroomIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19363577
  • C
    MoldTrace and repair the source and abate the visible mold condition greater tahn 30 sqft at ceiling and walls in the bathroomIssued Aug 11, 2026 · fix by Sep 6, 2026 overdue · Violation #19125964
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance door [ from street to vestibule ] , 1st storyIssued Aug 11, 2026 · fix by Aug 25, 2026 overdue · Violation #19125978
  • C
    Broken doors or locksProperly repair or replace the broken or defective heavy duty mortise lock and its assemblies at building entrance door [ from street to vestibule ] , 1st storyIssued Aug 11, 2026 · fix by Aug 17, 2026 overdue · Violation #19125980
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from northIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19125971
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19125972
  • C
    Other repairsProperly repair with similar material the broken or defective concrete at south exterior foundation wall atIssued Aug 4, 2026 · fix by Aug 10, 2026 overdue · Violation #19122835
  • C
    Other repairsProperly repair with similar material the broken or defective stucco at west exterior wallIssued Aug 4, 2026 · fix by Aug 10, 2026 overdue · Violation #19122857
  • C
    Other repairsProperly repair with similar material the broken or defective stucco at chimneyIssued Aug 4, 2026 · fix by Aug 10, 2026 overdue · Violation #19122860
  • B
    Lead paintRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the household items obstructing entrance leading to cellarIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19087468
  • C
    Other repairsProperly repair with similar material the broken or defective stucco at north exteiror wallIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · Violation #19069719
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19062998
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19062999
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch at vestibule door , 1st storyIssued Jul 9, 2026 · fix by Jul 15, 2026 overdue · Violation #19062982
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule , 1st storyIssued Jul 9, 2026 · fix by Jul 23, 2026 overdue · Violation #19062981
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance , 1st storyIssued Jul 9, 2026 · fix by Jul 23, 2026 overdue · Violation #19062979
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch at building entrance door , 1st storyIssued Jul 9, 2026 · fix by Jul 15, 2026 overdue · Violation #19062980
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor ( rotted ) in the 2nd room from north at eastIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19062997
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective ceramic soap dish over bathtub at north wall in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19054992
  • C
    Other repairsProperly repair with similar material the broken or defective base cabinet in the bathroomIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19055005
  • C
    Leaks and water damageRepair the broken or defective connection at waste line leaking under sink in the kitchenIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19055002
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Jun 23, 2026 · fix by Jun 29, 2026 overdue · Violation #19019053
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 17, 2026 · fix by Jun 16, 2026 overdue · rent impairing · Violation #19016785
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Jun 17, 2026 · fix by Jun 23, 2026 overdue · Violation #19016792
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 17, 2026 · fix by Jun 16, 2026 overdue · rent impairing · Violation #19016786
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling in the bathroomIssued Jun 15, 2026 · fix by Jul 11, 2026 overdue · Violation #19010488
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel reglaze at the bathtub in the bathroomIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #19003101
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at the sink in the kitchenIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #19003100
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in the waste-line of the sink based vanity in the bathroomIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · rent impairing · Violation #18999468
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18999469
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at the waste-pipe of the sink based vanity in the bathroomIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18999473
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 11, 2026 · fix by Jun 17, 2026 overdue · Violation #18997618
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Jun 11, 2026 · fix by Jun 17, 2026 overdue · Violation #18997517
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 11, 2026 · fix by Jun 10, 2026 overdue · rent impairing · Violation #18997504
  • C
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line drain under wash basin sink in the bathroomIssued Jun 11, 2026 · fix by Jun 17, 2026 overdue · rent impairing · Violation #18997626
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 11, 2026 · fix by Jun 10, 2026 overdue · rent impairing · Violation #18997512
  • C
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wash basin cabinet in the bathroomIssued Jun 11, 2026 · fix by Jun 17, 2026 overdue · Violation #18997621
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Jun 9, 2026 · fix by Jun 15, 2026 overdue · Violation #18996238
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 9, 2026 · fix by Jun 9, 2026 overdue · rent impairing · Violation #18996236
  • C
    Other repairsProperly repair with similar material the broken or defective water proofing stucco at entire rear cellarIssued Jun 5, 2026 · fix by Jun 11, 2026 overdue · Violation #18983294
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 5, 2026 · fix by Jun 4, 2026 overdue · rent impairing · Violation #18983288
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at eastIssued Jun 5, 2026 · fix by Jun 11, 2026 overdue · Violation #18983283
  • B
    Other repairsProperly repair or replace the broken or defective intercom in the entranceIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18853643
  • C
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles over bathtub at west wall in the bathroomIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18848199
  • C
    MoldTrace and repair the source and abate the visible mold condition at ceiling and all walls approx 50 sq ft in the bathroomIssued May 1, 2026 · fix by May 27, 2026 overdue · Violation #18848157
  • C
    Other repairsProperly repair or replace the broken or defective roof covering materialIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18853640
  • C
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from east at southIssued May 1, 2026 · fix by May 7, 2026 overdue · rent impairing · Violation #18853638
  • C
    Other repairsProperly repair or replace the broken or defective upper window sash balance at south wall in the 3rd room from east at southIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18853637
  • C
    Other repairsProperly repair or replace the broken or defective lower window sash balance at east wall 1st and 2nd window from north at fire escape in the 1st room from eastIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18853636
  • C
    Other repairsProperly repair or replace the broken or defective upper and lower window sash balance at east wall in the bathroomIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18853631
  • C
    Other repairsReplace with new the missing ceramic floor tiles in the bathroomIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18848193
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at southIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18853639
  • C
    Other repairsProperly repair with similar material the broken or defective stucco at west exteiror wallIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18848207
  • B
    Leaks and water damageRepair the roof so that it will not leak above ceiling in the private hallwayIssued Mar 30, 2026 · fix by May 4, 2026 overdue · rent impairing · Violation #18745292
  • B
    Other repairsProperly repair or replace the broken or defective bell/buzzer intercom system from building entrance to the panel at west wall in the private hallwayIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745291
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at lower sash at fire escape window in the 1st room from northIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745294
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from northIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745297
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the private hallwayIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745293
  • B
    Leaks and water damageRepair the roof so that it will not leak above ceiling in the 3rd room from northIssued Mar 30, 2026 · fix by May 4, 2026 overdue · rent impairing · Violation #18745296
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall around window in the 2nd room from north at eastIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745290

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

122017
62018
52019
52021
112022
112024
852025
762026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 221 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.