Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (North)

23 East 124 Street, Manhattan

10035 · 29 apartments · 7 stories · City Council district 9

By · Updated · Data from NYC HPD

C
21open immediately hazardous violations · 72 per 100 apartments
B34Hazardous, open
A12Non-hazardous, open
!67Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyONE TWO FOUR MADISON ASSOC LLC
Landlord (head officer or owner)Smajlje Srdanovic

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    20
  2. Mold
    9
  3. Leaks and water damage
    9
  4. Roaches
    8
  5. Other repairs
    7
  6. Plumbing, sinks and toilets
    4
  7. Broken doors or locks
    3
  8. Mice or rats
    2
  9. Missing smoke or CO detector
    2
  10. No heat or hot water
    1
  11. Electrical problems
    1
  12. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C86 days
from 14 closed · NYC typical: 87 days
B118 days
from 22 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19100765
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19100764
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2026 · fix by Aug 24, 2026 overdue · Violation #19100762
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19100766
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at east wall in the private hallwayIssued Jul 15, 2026 · fix by Aug 19, 2026 overdue · Violation #19080468
  • B
    MoldTrace and repair the source and abate the visible mold condition at all walls in the private hallwayIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070805
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 29, 2026 · fix by Jul 25, 2026 overdue · Violation #19036728
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at sink in the kitchenIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · rent impairing · Violation #19036731
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 29, 2026 · fix by Jul 25, 2026 overdue · Violation #19036729
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at basementIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #18997026
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 23, 2026 · fix by Apr 23, 2026 overdue · rent impairing · Violation #18808497
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basementIssued Apr 23, 2026 · fix by Apr 29, 2026 overdue · Violation #18808498
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixtures at ceiling in the 3rd room from northIssued Mar 17, 2026 · fix by Apr 21, 2026 overdue · Violation #18714605
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 17, 2026 · fix by Apr 21, 2026 overdue · Violation #18714607
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 17, 2026 · fix by Apr 21, 2026 overdue · Violation #18714606
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Mar 3, 2026 · fix by Apr 7, 2026 overdue · Violation #18686361
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at the ceiling in the kitchenIssued Feb 25, 2026 · fix by Apr 1, 2026 overdue · Violation #18671758
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 14, 2026 · fix by Feb 9, 2026 overdue · Violation #18567327
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 3, 2025 · fix by Dec 8, 2025 overdue · Violation #18340622
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Nov 3, 2025 · fix by Dec 8, 2025 overdue · Violation #18340620
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and east wall in the bathroomIssued Oct 29, 2025 · fix by Dec 3, 2025 overdue · Violation #18326299
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at the ceiling and east wall in the bathroomIssued Oct 29, 2025 · fix by Dec 3, 2025 overdue · Violation #18326304
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and east wall in the bathroomIssued Oct 29, 2025 · fix by Dec 3, 2025 overdue · Violation #18326302
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroomIssued Oct 29, 2025 · fix by Nov 4, 2025 overdue · Violation #18326300
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroomIssued Oct 29, 2025 · fix by Dec 3, 2025 overdue · Violation #18326305
  • B
    Other repairsProperly repair with similar material the broken or defective ecrutcheon plate at riser in the kitchenIssued Oct 28, 2025 · fix by Dec 2, 2025 overdue · Violation #18326307
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 28, 2025 · fix by Nov 23, 2025 overdue · Violation #18326309
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchenIssued Oct 28, 2025 · fix by Dec 2, 2025 overdue · Violation #18326308
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 23, 2025 · fix by Oct 29, 2025 overdue · Violation #18306212
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Oct 23, 2025 · fix by Oct 29, 2025 overdue · Violation #18310189
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in walk area in the foyerIssued Oct 23, 2025 · fix by Nov 27, 2025 overdue · Violation #18310185
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 23, 2025 · fix by Oct 29, 2025 overdue · Violation #18306213
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10sqft at ceiling in the bathroomIssued Oct 20, 2025 · fix by Nov 24, 2025 overdue · Violation #18304074
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 20, 2025 · fix by Oct 26, 2025 overdue · Violation #18304075
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Oct 20, 2025 · fix by Nov 24, 2025 overdue · Violation #18310186
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective mechanical stopper at wash basin in the bathroomIssued Oct 20, 2025 · fix by Nov 24, 2025 overdue · Violation #18304073
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at wash basin in the bathroomIssued Oct 20, 2025 · fix by Nov 24, 2025 overdue · rent impairing · Violation #18304072
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 17, 2025 · fix by Oct 23, 2025 overdue · Violation #18304078
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2025 · fix by Oct 27, 2025 overdue · Violation #18262423
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Oct 1, 2025 · fix by Oct 7, 2025 overdue · Violation #18262419
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroomIssued Oct 1, 2025 · fix by Oct 7, 2025 overdue · Violation #18262420
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroomIssued Oct 1, 2025 · fix by Nov 5, 2025 overdue · Violation #18262422
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at the ceiling, east wall, and south wall in the bathroomIssued Oct 1, 2025 · fix by Nov 5, 2025 overdue · Violation #18262421
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 2 sq ft at ceiling in the bathroomIssued May 28, 2024 · fix by Jul 2, 2024 overdue · Violation #17009458
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 29, 2024 · fix by May 25, 2024 overdue · Violation #16932143
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Mar 27, 2024 · fix by May 1, 2024 overdue · Violation #16774518
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 11, 2023 · fix by Jan 6, 2024 overdue · Violation #16506834
  • C
    Broken doors or locksProvide approved one-hour fire resistance rated self-closing door with key-operated dead bolt & latch set, peep hole & chain guard at main entrance to unitIssued Jul 19, 2022 · fix by Jul 25, 2022 overdue · Violation #15266999
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd room from northIssued Jun 21, 2021 · fix by Jul 26, 2021 overdue · Violation #14398550
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 3rd room from northIssued Jun 21, 2021 · fix by Jul 26, 2021 overdue · rent impairing · Violation #14398549
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Jun 21, 2021 · fix by Jul 26, 2021 overdue · Violation #14398552
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 21, 2021 · fix by Jul 17, 2021 overdue · Violation #14398553
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2020 · fix by Oct 4, 2020 overdue · Violation #13737036
  • B
    Lead paintRemove the illegal fastening key operated door lock leading to fire escape window in the 1st room from northIssued Mar 30, 2015 · fix by May 4, 2015 overdue · rent impairing · Violation #10647706
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Dec 10, 2014 · fix by Jan 14, 2015 overdue · Violation #10471302

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

232017
122018
282019
92020
62021
62022
122023
222024
352025
342026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 264 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.