Housing violations · East Harlem (North)
27 East 124 Street, Manhattan
10035 · 36 apartments · 7 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster9
- Mold3
- Other repairs3
- Mice or rats3
- Broken doors or locks2
- Plumbing, sinks and toilets2
- Roaches2
- Leaks and water damage1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 15 closed · NYC typical: 87 days
from 8 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193471
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193472
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st storyIssued Jul 27, 2026 · fix by Aug 10, 2026 overdue · Violation #19089345
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet at ceiling, north and west walls in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19089340
- COther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Jul 27, 2026 · fix by Aug 2, 2026 overdue · rent impairing · Violation #19089348
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles north wall in the bathroomIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18823550
- BMoldTrace and repair the source and abate the visible mold condition at north wall in the bathroomIssued Feb 5, 2026 · fix by Mar 12, 2026 overdue · Violation #18624968
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective mechanical stopper at bathtub in the bathroomIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18254347
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroomIssued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254353
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and east wall in the bathroomIssued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254351
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 26, 2025 · fix by Oct 22, 2025 overdue · Violation #18254346
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchenIssued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254345
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254348
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254349
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 27, 2025 · fix by Apr 22, 2025 overdue · Violation #17779640
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 10, 2023 · fix by May 6, 2023 overdue · Violation #15903758
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 27, 2022 · fix by Aug 20, 2022 overdue · Violation #15286204
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 11, 2022 · fix by Aug 6, 2022 overdue · Violation #15254896
- BMoldTrace and repair the source and abate the visible mold condition at ceiling (12 sq ft), east (4 sq ft), south (6 sq ft) and north(2 sq ft) walls in the…Issued Jul 11, 2022 · fix by Aug 15, 2022 overdue · Violation #15254899
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at eastIssued Apr 12, 2021 · fix by May 17, 2021 overdue · Violation #14056545
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2020 · fix by Oct 14, 2020 overdue · Violation #13811184
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling & walls in the 4th room from north at westIssued May 15, 2017 · fix by Jun 19, 2017 overdue · Violation #11781941
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.