Housing violations · East Harlem (North)
107 East 126 Street, Manhattan
10035 · 255 apartments · 11 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster100
- Mice or rats68
- Mold61
- Leaks and water damage56
- Roaches56
- Other repairs47
- Broken doors or locks28
- Missing smoke or CO detector24
- Plumbing, sinks and toilets17
- Electrical problems5
- Lead paint4
- No heat or hot water4
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 328 closed · NYC typical: 87 days
from 528 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19328032
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at west wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19328035
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19328034
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19328033
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19328037
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19328036
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19328030
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19328031
- BMoldTrace and repair the source and abate the visible mold condition less than 10sqft at south and west wall inside closet in the private hallwayIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19316789
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19302538
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at west wall. in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19302539
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at the ceiling in the 1st bathroom from eastIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287773
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at the ceiling in the 1st room from northIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287772
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 6, 2026 · fix by Nov 1, 2026 overdue · Violation #19273447
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19273448
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling inside closet at south wall in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267435
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at the door in the entranceIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267433
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19192274
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192273
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192272
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in closet east 2 in the private hallwayIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19161565
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19161567
- CPlumbing, sinks and toiletsReplace the broken or defective wash/basin in the bathroomIssued Sep 4, 2026 · fix by Sep 10, 2026 overdue · rent impairing · Violation #19161574
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in east 1 closet in the private hallwayIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19161566
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the 3rd room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19163848
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19163850
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19163849
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19163851
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation at west wall in the bathroomIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19161563
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19161558
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 26, 2026 · fix by Sep 21, 2026 overdue · Violation #19161570
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2026 · fix by Sep 21, 2026 overdue · Violation #19161555
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 26, 2026 · fix by Sep 21, 2026 overdue · Violation #19161556
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 3rd room from eastIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19161557
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the bathroomIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19161559
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2026 · fix by Sep 21, 2026 overdue · Violation #19161561
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19161562
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation at east wall in the kitchenIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19161568
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2026 · fix by Sep 21, 2026 overdue · Violation #19161571
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 4th room from northIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19161573
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls inside the closet at north in the private hallwayIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19161572
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the closet ceiling at north in the private hallwayIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19161569
- BOther repairsProperly repair or replace the broken or defective venitlation system at south wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19159170
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19159147
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the private hallwayIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19094655
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the private hallwayIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19094656
- BLead paintProperly repair or replace the broken or defective latch at 2nd fire door at west,stairwell ''f'' leading to court yard at public hall, 1st story, section…Issued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19087597
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the closet in the private hallwayIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082788
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the closet in the private hallwayIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082787
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the private hallwayIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082786
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall and ceiling in the private hallwayIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082785
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 17, 2026 · fix by Aug 12, 2026 overdue · Violation #19075592
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 17, 2026 · fix by Aug 12, 2026 overdue · Violation #19075591
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the 1st room from northIssued Jun 23, 2026 · fix by Jul 28, 2026 overdue · Violation #19024002
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the kitchenIssued Jun 23, 2026 · fix by Jul 28, 2026 overdue · Violation #19023999
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 23, 2026 · fix by Jul 19, 2026 overdue · Violation #19024000
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 22, 2026 · fix by Jul 18, 2026 overdue · Violation #19016021
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19016020
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19016019
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the kitchenIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19016016
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.