Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Kensington

803 Beverly Road, Brooklyn

11218 · 8 apartments · 4 stories · City Council district 40

By · Updated · Data from NYC HPD

C
38open immediately hazardous violations · 475 per 100 apartments
B52Hazardous, open
A14Non-hazardous, open
!87Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyBEVERLY ST ASSOCAITES LLC
Landlord (head officer or owner)Charles Rosenwasser

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    40
  2. Roaches
    18
  3. Peeling paint and plaster
    11
  4. Broken doors or locks
    8
  5. Mice or rats
    8
  6. Mold
    5
  7. No heat or hot water
    5
  8. Missing smoke or CO detector
    4
  9. Leaks and water damage
    2
  10. Electrical problems
    1
  11. Plumbing, sinks and toilets
    1
  12. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C82 days
from 64 closed · NYC typical: 87 days
B88 days
from 94 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsProperly repair with similar material the broken or defective metal cornie under roof at corniceIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337806
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319491
  • B
    Broken doors or locksRefit 2nd wood closet door from east at south in the 2nd room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319490
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319489
  • B
    Electrical problemsProperly secure the loose elictrical outlet at north wall in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319488
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19319487
  • B
    Broken doors or locksReplace with new the missing door knob at sliding wood door closet at east in the 1st room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319486
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319485
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19319484
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319483
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water in the entire apartmentIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19319493
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective strip lever at wash basin in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319494
  • C
    Other repairsProperly repair with similar material the broken or defective concrete nosing at 3rd and 4th tread from bottom at building frontIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19267390
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267990
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19267995
  • B
    Other repairsReplace with new the missing ceramic tile at north wall in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267981
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling and south wall in the 3rd room from northIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19267989
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19267980
  • C
    Other repairsReplace with new the missing window at upper sash at west wall in the kitchenIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19267976
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19267997
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267977
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Oct 1, 2026 · fix by Oct 15, 2026 overdue · Violation #19267973
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 6th room from northIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257125
  • B
    Other repairsProperly repair with similar material the broken or defective 4th and 5th concrete tread from bottom up at stoop building front , 1st storyIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257128
  • B
    Other repairsProperly secure the loose newell post at west at bottom at public hall stairs, 1st storyIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19250076
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yardIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19250077
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 29, 2026 · fix by Oct 25, 2026 overdue · Violation #19250078
  • B
    Other repairsProperly repair or replace the broken or defective counter balance of lower sash at north wall window in the 1st room from northIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19250482
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water above 130 degrees in the entire apartmentIssued Sep 29, 2026 · fix by Oct 5, 2026 overdue · Violation #19250483
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 23, 2026 · fix by Oct 19, 2026 overdue · Violation #19232826
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 23, 2026 · fix by Oct 19, 2026 overdue · Violation #19232827
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19216049
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east and west walls in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216051
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216052
  • B
    Other repairsProperly repair or replace the broken or defective glass pane at window lower sash at west wall in the 3rd room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216055
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Sep 18, 2026 · fix by Sep 24, 2026 overdue · Violation #19216047
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the bathroomIssued Sep 18, 2026 · fix by Sep 24, 2026 overdue · Violation #19227295
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 7th room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216056
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 3rd room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216054
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19216048
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216050
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216053
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south and north walls in the 7th room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19216057
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 18, 2026 · fix by Oct 2, 2026 overdue · Violation #19216058
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at gas range in the entire apartmentIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · rent impairing · Violation #19214759
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176394
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19176395
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19100475
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of metal nails protruded out at wood door threshold at south entrance, in the 1st room from northIssued Aug 3, 2026 · fix by Aug 9, 2026 overdue · Violation #19101101
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub- floor in the 1st room from northIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19101099
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19100474
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water above 130 f in the entire apartmentIssued Aug 3, 2026 · fix by Aug 9, 2026 overdue · Violation #19100471
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles, in the 1st room from northIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19101098
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2026 · fix by Aug 24, 2026 overdue · Violation #19101087
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles, in the kitchenIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19101089
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeded allowed temperature of the 130.f degrees at hotwater fixtures, in the entire apartmentIssued Jul 29, 2026 · fix by Aug 4, 2026 overdue · Violation #19101088
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles, in the bathroomIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19101103
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 9, 2026 · fix by Aug 4, 2026 overdue · Violation #19061640
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the private hallwayIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19061635
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood wall cabinet doors at south in the kitchenIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19061639

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

192017
272019
242020
122021
252022
262023
182024
632025
1832026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 439 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.