Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Sheepshead Bay-Manhattan Beach-Gerritsen Beach

2190 Brigham Street, Brooklyn

11229 · 48 apartments · 6 stories · City Council district 46

By · Updated · Data from NYC HPD

C
3open immediately hazardous violations · 6 per 100 apartments
B22Hazardous, open
A15Non-hazardous, open
!33Past the fix-by date

On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building has fewer.

Open in Google Maps ↗

Who owns and manages it

Owning companyBRIGHAM PARK COOPERATIVE APTS SEC #3

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    16
  2. Broken doors or locks
    7
  3. Leaks and water damage
    6
  4. Other repairs
    5
  5. Missing smoke or CO detector
    2
  6. Mold
    1
  7. Plumbing, sinks and toilets
    1
  8. Electrical problems
    1
  9. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

CNot enough data
NYC typical: 84 days
BNot enough data
NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet, 3rd storyIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19334996
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19334990
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 3rd storyIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19334995
  • B
    Other repairsReplace with new the missing escutcheon plate at ceiling at riser pipe at west wall in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19334992
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulk around the bathtub in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19334991
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19334993
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19334994
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at entrance door at compactor closet, 3rd storyIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19334997
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall and ceiling north bulkhead 6 sty public hallIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174078
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #10737006
  • B
    Electrical problemsProperly repair the broken or defective electrical light switch in the 1st room from northIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #10737009
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall public hall cellarIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174073
  • B
    Broken doors or locksArrange and make self-closing the doors bulkhead to roof at northIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174074
  • B
    Peeling paint and plasterD26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls & ceilings north east & south east rooms 6 styIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174058
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling 5 sty public hall northIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174079
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and wall at southeast window 4 sty public hall southIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174080
  • B
    Leaks and water damageD26-10.01 adm code abate the nuisance consisting of concealed leaks walls & ceilings southeast & northeast rooms 6 styIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174055
  • B
    Leaks and water damageD26-10.01 adm code abate the nuisance consisting of concealed leak ceilings above windows of front & rear east rooms 5th styIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174060
  • B
    Leaks and water damageD26-10.01 adm code abate the nuisance consisting of concealed leak ceilings above windows front & rear east rooms 5th styIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174062
  • B
    Peeling paint and plasterD26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling of center room 6th styIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174064
  • B
    Leaks and water damageD26-10.01 adm code abate the nuisance consisting of concealed leaks throughout exterior walls 6th styIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174066
  • B
    Peeling paint and plasterD26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls & ceilings over windows 6th styIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174067
  • B
    Broken doors or locksD26-10.01 adm code replace with new the missing chain door guard entrance door 6th styIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174069
  • B
    Leaks and water damageD26-10.01 adm code & 309 m/d law abate the nuisance consisting of water leak around windows north & south rooms 4 styIssued May 20, 2020 · fix by Jun 24, 2020 overdue · Violation #1174072
  • B
    RoachesAbate the nuisance consisting of roachesIssued Jun 5, 2015 · fix by Jul 10, 2015 overdue · Violation #10737003

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

292020
102026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 47 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 28, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.