Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (North)

134 Edgecombe Avenue, Manhattan

10030 · 11 apartments · 5 stories · City Council district 9

By · Updated · Data from NYC HPD

C
15open immediately hazardous violations · 136 per 100 apartments
B10Hazardous, open
A2Non-hazardous, open
!16Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyHAF EDGECOMBE ASSOCIATES LP
Landlord (head officer or owner)Joseph Zitolo

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    10
  2. Peeling paint and plaster
    5
  3. Roaches
    3
  4. No heat or hot water
    2
  5. Broken doors or locks
    2
  6. Electrical problems
    2
  7. Plumbing, sinks and toilets
    1
  8. Mice or rats
    1
  9. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C69 days
from 24 closed · NYC typical: 87 days
B87 days
from 29 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19351776
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19351777
  • B
    Other repairsRepair the broken or defective connection at water closet in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344537
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344538
  • B
    Other repairsProperly repair or replace the broken or defective ceiling light fixtures in the private hallwayIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344531
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the 3rd room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344540
  • B
    Other repairsProperly repair or replace the broken or defective ceiling light fixture in the 1st room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344530
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at electrical outlet at east wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344539
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the private hallwayIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344533
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Nov 2, 2026 · fix by Nov 16, 2026 · Violation #19344534
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19344536
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at lower window sash at east wall in the 4th room from eastIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19310305
  • B
    Other repairsProperly repair or replace the broken or defective counter balances at lower sash at west wall in the 4th room from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19310308
  • C
    Other repairsProperly repair or replace the broken or defective baseboard heater cover at south wall in the private hallwayIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19310312
  • C
    Other repairsProperly repair or replace the broken or defective counter balances at lower window sash at east wall in the 4th room from eastIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19310303
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19155160
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19155161
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 12, 2025 · fix by Oct 8, 2025 overdue · Violation #18220400
  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Sep 12, 2025 · fix by Oct 17, 2025 overdue · Violation #18220399
  • C
    Other repairsProperly repair with similar material the broken or defective hardwood floors in the private hallwayIssued Sep 12, 2025 · fix by Sep 18, 2025 overdue · Violation #18220390
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroomIssued Sep 12, 2025 · fix by Sep 18, 2025 overdue · Violation #18220384
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Apr 10, 2025 · fix by May 15, 2025 overdue · Violation #17818385
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 24, 2025 · fix by Mar 2, 2025 overdue · Violation #17713061
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 24, 2025 · fix by Feb 23, 2025 overdue · rent impairing · Violation #17713059
  • C
    Other repairsProperly secure the loose handrail on south wall at public hall stairs, 1st storyIssued Jan 21, 2025 · fix by Jan 27, 2025 overdue · Violation #17623757

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12017
12018
22021
12023
72024
502025
252026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 109 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.