Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Hamilton Heights-Sugar Hill

137 Edgecombe Avenue, Manhattan

10030 · 10 apartments · 5 stories · City Council district 9

By · Updated · Data from NYC HPD

C
9open immediately hazardous violations · 90 per 100 apartments
B9Hazardous, open
A5Non-hazardous, open
!15Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyICER OF HAMILTON HEIGHTS LLC
Landlord (head officer or owner)Joseph Jemal

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    6
  2. No heat or hot water
    5
  3. Peeling paint and plaster
    4
  4. Missing smoke or CO detector
    2
  5. Leaks and water damage
    2
  6. Mold
    2
  7. Broken doors or locks
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C25 days
from 9 closed · NYC typical: 87 days
B111 days
from 12 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19326537
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling near skylight at public hall, 5th storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19326541
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 5th storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19326543
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at south wall at public hall, 3rd storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19326539
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 30 sq.ft observed at south wall, north wall, east wall and ceiling in the bathroomIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19326536
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19326538
  • C
    Broken doors or locksProvide ready access to buildings heating system door at cellar locked at boiler roomIssued Mar 12, 2026 · fix by Mar 18, 2026 overdue · Violation #18698738
  • B
    Other repairsProperly repair or replace the broken or defective intercom return system from building front to the west wall in the 1st room from eastIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18698736
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 12, 2026 · fix by Mar 11, 2026 overdue · rent impairing · Violation #18698735
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 12, 2026 · fix by Mar 26, 2026 overdue · Violation #18698740
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 25, 2026 · fix by Feb 25, 2026 overdue · rent impairing · Violation #18665350
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 25, 2026 · fix by Feb 25, 2026 overdue · rent impairing · Violation #18665347
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 25, 2026 · fix by Feb 25, 2026 overdue · rent impairing · Violation #18665351
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Jul 11, 2025 · fix by Aug 15, 2025 overdue · Violation #18082956
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixture in the entire apartmentIssued May 19, 2025 · fix by May 25, 2025 overdue · Violation #17901777
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed and loose plaster at ceiling in the bathroomIssued Dec 7, 2023 · fix by Dec 13, 2023 overdue · Violation #16503661
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling ( approx.3.sq.ft.) in the bathroomIssued Jan 5, 2022 · fix by Feb 9, 2022 overdue · Violation #14767448
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 6, 2021 · fix by Aug 10, 2021 overdue · Violation #14383875

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22018
72021
162022
92023
42024
92025
252026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 74 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.