Housing violations · Hamilton Heights-Sugar Hill
319 Edgecombe Avenue, Manhattan
10031 · 119 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint44
- Other repairs19
- Peeling paint and plaster16
- Leaks and water damage6
- Mice or rats6
- Roaches6
- Missing smoke or CO detector5
- Broken doors or locks4
- Plumbing, sinks and toilets4
- Mold3
- Electrical problems1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 128 closed · NYC typical: 87 days
from 169 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty lockset at vestibule door at public hall, 1st storyIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19326712
- CBroken doors or locksProperly repair or replace the broken or defective glass pane at vestibule door at public hall, 1st storyIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19326711
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the 1st room from northIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589849
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589850
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the 1st room from northIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18569854
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 1st room from northIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18569853
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18571533
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 1st room from northIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18569855
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 20, 2025 · fix by Dec 16, 2025 overdue · Violation #18390238
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 20, 2025 · fix by Dec 16, 2025 overdue · Violation #18390239
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18293203
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household storage at 6 story balcony at front court east stack at…Issued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18283580
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the excessive garbage bags, boxes and recycling materials at front areawayIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18283645
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sqft at ceiling, east , north and south walls in the bathroomIssued Aug 13, 2025 · fix by Sep 8, 2025 overdue · Violation #18163446
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18163419
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jul 18, 2025 · fix by Aug 13, 2025 overdue · rent impairing · Violation #18101417
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #17978330
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #17978328
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #17978327
- BOther repairsProperly repair with similar material the broken or defective ceramic-tiles at south, west and north walls in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #17978326
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wash/basin in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · rent impairing · Violation #17978324
- BOther repairsRemove all encumbrances consisting of construction materials at public hall, 1st storyIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · rent impairing · Violation #17978341
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit protruding more than 4 inches from window sill…Issued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978345
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit protruding more than 4 inches from window sill…Issued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978346
- BPlumbing, sinks and toiletsReplace the broken or defective sink in the kitchenIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · rent impairing · Violation #17978333
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978320
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978336
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978337
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 16, 2025 · fix by Jul 12, 2025 overdue · Violation #17978339
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 16, 2025 · fix by Jul 12, 2025 overdue · Violation #17978340
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978323
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978335
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978334
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north and east walls in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978322
- BOther repairsRemove all obstructions and repair all defects in wasteline at bath tub in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · rent impairing · Violation #17978321
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978338
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #17978332
- BOther repairsAbate the nuisance consisting of excessive storage of material in the entire apartmentIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17937956
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17937957
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft at ceiling and south wall in the bathroomIssued Jun 9, 2025 · fix by Jul 5, 2025 overdue · Violation #17937955
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroomIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17937954
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17937958
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 9, 2025 · fix by Jun 15, 2025 overdue · Violation #17937953
- BPlumbing, sinks and toiletsRepair the broken or defective plastered surfaces and paint in a uniform color the north wall at sink in the kitchenIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17906292
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner unit protruding over 4 inches beyond window sill…Issued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17900904
- BBroken doors or locksProvide handset and unobstructed on bulkhead roof door that allow re-entry from roof to public hall, 6 story, section at northIssued Jan 2, 2025 · fix by Feb 6, 2025 overdue · Violation #17591505
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 7, 2024 · fix by Dec 1, 2024 overdue · Violation #17406656
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 30, 2024 · fix by Oct 26, 2024 overdue · Violation #17306647
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 4th room from northIssued Jun 3, 2024 · fix by Jul 8, 2024 overdue · Violation #17013677
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 21, 2023 · fix by Jan 25, 2024 overdue · Violation #16519819
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Dec 14, 2023 · fix by Jan 18, 2024 overdue · Violation #16519820
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 28, 2023 · fix by Sep 3, 2023 overdue · Violation #16182943
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall, south wall and ceiling in the bathroomIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183622
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183625
- CRoachesAbate the infestation consisting of roaches in the kitchenIssued Aug 28, 2023 · fix by Sep 23, 2023 overdue · Violation #16182953
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall. in the kitchenIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16182952
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, south and west wall. in the bathroomIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16182945
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 24, 2023 · fix by Aug 19, 2023 overdue · Violation #16110120
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 18, 2023 · fix by Jun 22, 2023 overdue · Violation #15978560
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 12, 2023 · fix by Jun 16, 2023 overdue · Violation #15978566
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.