Housing violations · Hamilton Heights-Sugar Hill
379 Edgecombe Avenue, Manhattan
10031 · 37 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs11
- Peeling paint and plaster8
- Lead paint5
- Electrical problems4
- Broken doors or locks4
- Mold3
- Roaches3
- Missing smoke or CO detector2
- Mice or rats2
- Plumbing, sinks and toilets1
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 6 closed · NYC typical: 87 days
from 26 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the kitchenIssued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18051234
- BOther repairsReplace with new the missing radiator in the 1st room from east at southIssued Feb 20, 2025 · fix by Mar 27, 2025 overdue · Violation #17698103
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17698113
- BOther repairsProperly repair or replace the broken or defective counterbalance at lower sash window at west wall in the 1st room from east at northIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17698117
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroomIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17698101
- BOther repairsRefit window at west wall in the 1st room from east at southIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17698102
- BOther repairsProperly repair or replace the broken or defective counterbalance at lower sash window at west wall in the bathroomIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17698104
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17698109
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17698110
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 18, 2025 · fix by Mar 16, 2025 overdue · Violation #17698111
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceilng in the 2nd room from eastIssued Nov 19, 2024 · fix by Nov 25, 2024 overdue · Violation #17426238
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceilng and all walls in the bathroomIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17426241
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceilng and all walls in the 3rd room from east at northIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17426240
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from eastIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17426239
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 19, 2024 · fix by Dec 3, 2024 overdue · Violation #17426237
- BElectrical problemsProperly repair or replace the broken or defective outlet at east wall in the 1st room from northIssued Oct 30, 2024 · fix by Dec 4, 2024 overdue · Violation #17382042
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Oct 30, 2024 · fix by Dec 4, 2024 overdue · Violation #17382043
- BElectrical problemsProperly repair or replace the broken or defective outlet at west wall in the 1st room from northIssued Oct 30, 2024 · fix by Dec 4, 2024 overdue · Violation #17382041
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 30, 2024 · fix by Nov 25, 2024 overdue · Violation #17382040
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 21, 2024 · fix by Nov 16, 2024 overdue · Violation #17358000
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Apr 11, 2024 · fix by Apr 25, 2024 overdue · Violation #16827956
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degrees in kitchen and. in the bathroomIssued Jan 20, 2023 · fix by Jan 26, 2023 overdue · Violation #15671947
- CMoldTrace and repair the source and abate the visible mold condition 30 sq feet at ceiling and 8 sq feet at south wall in the bathroomIssued Sep 21, 2022 · fix by Oct 17, 2022 overdue · Violation #15374958
- CRoachesAbate the infestation consisting of roachesIssued Sep 13, 2021 · fix by Oct 9, 2021 overdue · Violation #14551823
- CMice or ratsAbate the infestation consisting of miceIssued Sep 13, 2021 · fix by Oct 9, 2021 overdue · Violation #14551822
- BLead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 27, 2021 · fix by Aug 31, 2021 overdue · Violation #14461182
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jul 27, 2021 · fix by Jul 31, 2021 overdue · Violation #14461183
- BLead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 6, 2021 · fix by Aug 10, 2021 overdue · Violation #14419832
- BLead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 6, 2021 · fix by Aug 10, 2021 overdue · Violation #14419833
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jun 4, 2021 · fix by Jun 8, 2021 overdue · Violation #14368507
- CMoldTrace and repair the source and abate the visible mold condition approx. 15 sq. ft west wall, south wall in the bathroomIssued Aug 3, 2020 · fix by Aug 29, 2020 overdue · Violation #13750785
- BBroken doors or locksArrange and make self-closing the doors in the entranceIssued Mar 26, 2018 · fix by Apr 30, 2018 overdue · Violation #12302907
- BElectrical problemsReplace with new the missing electrical outlet's child safety covers/plugs (total1) , 1st storyIssued Dec 15, 2017 · fix by Jan 19, 2018 overdue · Violation #12142910
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household item at front fire escape , 5th storyIssued Aug 28, 2017 · fix by Oct 2, 2017 overdue · Violation #11946321
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Jul 10, 2017 · fix by Aug 7, 2017 overdue · Violation #11869060
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.