Housing violations · Hamilton Heights-Sugar Hill
385 Edgecombe Avenue, Manhattan
10031 · 42 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster20
- Mice or rats7
- Other repairs7
- Roaches6
- Missing smoke or CO detector5
- Leaks and water damage4
- Plumbing, sinks and toilets3
- Broken doors or locks3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 59 closed · NYC typical: 87 days
from 92 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #19000339
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #19000338
- BOther repairsRemove all encumbrances consisting of construction material at public hall, 1st storyIssued May 26, 2026 · fix by Jun 30, 2026 overdue · rent impairing · Violation #18952712
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 3, 2024 · fix by Oct 29, 2024 overdue · Violation #17310887
- BOther repairsProperly repair or replace the broken or defective lower window sash at east wall in the 2nd room from north at eastIssued Oct 3, 2024 · fix by Nov 7, 2024 overdue · Violation #17310883
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 29, 2024 · fix by Jun 24, 2024 overdue · Violation #17004317
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from north at eastIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17004315
- BPlumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17004318
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at eastIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17004314
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 12, 2023 · fix by Jan 7, 2024 overdue · Violation #16513922
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 12, 2023 · fix by Jan 7, 2024 overdue · Violation #16513921
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 29, 2023 · fix by Sep 24, 2023 overdue · Violation #16189885
- BOther repairsProperly repair or replace the broken or defective lower sash window spring balance 1 st window at east wall in the 1st room from east at centerIssued Aug 29, 2023 · fix by Oct 3, 2023 overdue · Violation #16189889
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 29, 2023 · fix by Sep 24, 2023 overdue · Violation #16189887
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 9, 2023 · fix by Jun 13, 2023 overdue · Violation #15970271
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 9, 2023 · fix by Jun 13, 2023 overdue · Violation #15970270
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Mar 24, 2023 · fix by Apr 28, 2023 overdue · Violation #15816330
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Mar 24, 2023 · fix by Apr 28, 2023 overdue · Violation #15816331
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at wasteline in bathtub in the bathroomIssued Nov 4, 2022 · fix by Dec 9, 2022 overdue · rent impairing · Violation #15419834
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall and ceiling in the 4th room from north at eastIssued Nov 4, 2022 · fix by Dec 9, 2022 overdue · Violation #15419832
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 21, 2022 · fix by Oct 17, 2022 overdue · Violation #15375654
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at south and west walls at 1st public hall bulkhead from north, 6th storyIssued Sep 13, 2022 · fix by Oct 18, 2022 overdue · Violation #15356691
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective grout around bathtub in the bathroomIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · Violation #15356686
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 1st room from eastIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · rent impairing · Violation #15356684
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the kitchenIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · rent impairing · Violation #15356689
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallwayIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · Violation #15356688
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from eastIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · Violation #15356685
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 2nd room from eastIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · Violation #15356683
- BLeaks and water damageRepair the roof so that it will not leak over ceilling in the 2nd room from eastIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · rent impairing · Violation #15356682
- BOther repairsProperly repair with similar material the broken or defective wood floor at west in the 4th room from eastIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · Violation #15356681
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 12, 2022 · fix by Oct 17, 2022 overdue · Violation #15356690
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east at northIssued Aug 9, 2022 · fix by Sep 13, 2022 overdue · Violation #15308764
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east at southIssued Aug 9, 2022 · fix by Sep 13, 2022 overdue · Violation #15308765
- BOther repairsProperly repair with similar material the broken or defective wood floor rotted in the 2nd room from eastIssued Aug 9, 2022 · fix by Sep 13, 2022 overdue · Violation #15308755
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from eastIssued Aug 9, 2022 · fix by Sep 13, 2022 overdue · Violation #15308758
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from eastIssued Apr 15, 2022 · fix by May 20, 2022 overdue · Violation #15101362
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 15, 2022 · fix by May 20, 2022 overdue · Violation #15101361
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Apr 15, 2022 · fix by May 20, 2022 overdue · Violation #15101360
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 14, 2021 · fix by Jun 9, 2021 overdue · Violation #14332297
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 14, 2021 · fix by Jun 9, 2021 overdue · Violation #14332298
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the private hallwayIssued Mar 16, 2020 · fix by Apr 20, 2020 overdue · Violation #13580862
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 7, 2020 · fix by Jan 28, 2020 overdue · Violation #13529286
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 13, 2019 · fix by Jan 3, 2020 overdue · Violation #13479943
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.