Housing violations · Washington Heights (South)
535 Edgecombe Avenue, Manhattan
10032 · 21 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint31
- Peeling paint and plaster27
- Other repairs19
- Mold10
- Roaches9
- Broken doors or locks9
- Missing smoke or CO detector9
- Mice or rats9
- Leaks and water damage7
- Plumbing, sinks and toilets4
- Electrical problems3
- Missing window guards2
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 12 closed · NYC typical: 87 days
from 3 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19176891
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 1st room from east at southIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176888
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176887
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall and ceiling in the 1st room from east at southIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176886
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176894
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176889
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176893
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176892
- COther repairsProperly repair or replace the broken or defective spring balance at fire escape upper window sash in the 1st room from east at northIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19176890
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square ft at east wall. in the bathroomIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18665199
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Jan 27, 2026 · fix by Mar 3, 2026 overdue · Violation #18604141
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Jan 22, 2026 · fix by Jan 28, 2026 overdue · Violation #18582895
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443609
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443615
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at east, south and north wall. in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443614
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling. in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443612
- BOther repairsProperly repair with similar material the broken or defective wood baseboard around all walls in the foyerIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443610
- BOther repairsProperly repair or replace the broken or defective bell/buzzer intercom system from building entrance to the panel at south wall in the foyerIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443608
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · rent impairing · Violation #18443617
- BOther repairsProperly repair with similar material the broken or defective wood baseboard around the walls in the 2nd room from northIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443611
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443616
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq fts at ceiling, north wall and east wall. in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443613
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at south wall and ceiling in the bathroomIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18440244
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18330429
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the bathroomIssued Oct 24, 2025 · fix by Nov 28, 2025 overdue · Violation #18317847
- BOther repairsProperly secure the loose wall cabinet at east wall in the kitchenIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18257039
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Sep 29, 2025 · fix by Oct 23, 2025 overdue · Violation #18260599
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18257043
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18257044
- BPlumbing, sinks and toiletsReplace the broken or defective wash basin in the bathroomIssued Jul 25, 2025 · fix by Aug 29, 2025 overdue · rent impairing · Violation #18111986
- BOther repairsRemove all encumbrances consisting of discarded gas range at public hall, 4th storyIssued Jul 25, 2025 · fix by Aug 29, 2025 overdue · rent impairing · Violation #18111987
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jul 25, 2025 · fix by Aug 20, 2025 overdue · Violation #18111984
- BElectrical problemsProperly secure the loose electrical outlet at south wall in the 1st room from east at southIssued Jul 25, 2025 · fix by Aug 29, 2025 overdue · Violation #18111985
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 18, 2025 · fix by Aug 13, 2025 overdue · Violation #18095389
- BOther repairsProperly repair or replace the broken or defective spring balance at upper sash at window in the kitchenIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18095397
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch assembly in the entranceIssued Jul 18, 2025 · fix by Aug 1, 2025 overdue · Violation #18095395
- BBroken doors or locksRefit window unable to lock at east wall in the 2nd room from eastIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18095396
- BOther repairsProperly repair or replace the broken or defective intercom, bell and return buzzer at south wall in the private hallwayIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18095393
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 18, 2025 · fix by Aug 13, 2025 overdue · Violation #18095390
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jun 27, 2025 · fix by Jul 23, 2025 overdue · Violation #18040786
- BPlumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18040789
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 27, 2025 · fix by Jul 21, 2025 overdue · Violation #18052215
- BOther repairsProperly repair or replace the broken or defective intercommunication system from building entrance to panel at south wall in the foyerIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18040788
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18040787
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 3rd room from northIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923262
- BOther repairsProperly repair or replace the broken or defective bell/buzzer intercom system from building entrance to the panel at west wall in the foyerIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923258
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923260
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued May 30, 2025 · fix by Jul 4, 2025 overdue · rent impairing · Violation #17923257
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the bathroomIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923256
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, south wall in the bathroomIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923255
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electric wires at north wall in the kitchenIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923254
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923261
- BOther repairsRemove all encumbrances consisting of bicycle, wheelchair, and baby carriage under the staircase at public hall, 1st storyIssued Mar 13, 2025 · fix by Apr 17, 2025 overdue · rent impairing · Violation #17755199
- BOther repairsRemove all encumbrances consisting of household item at 1st public hall bulkhead from east, 5th storyIssued Mar 13, 2025 · fix by Apr 17, 2025 overdue · rent impairing · Violation #17755198
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at southIssued Feb 14, 2025 · fix by Mar 21, 2025 overdue · Violation #17694217
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at southIssued Feb 14, 2025 · fix by Mar 21, 2025 overdue · Violation #17694218
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchenIssued Aug 12, 2024 · fix by Sep 16, 2024 overdue · Violation #17176835
- BOther repairsReplace with new the missing upper escutheon plate at riser pipe in the kitchenIssued Aug 12, 2024 · fix by Sep 16, 2024 overdue · Violation #17176837
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Aug 12, 2024 · fix by Sep 16, 2024 overdue · Violation #17176833
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 12, 2024 · fix by Sep 7, 2024 overdue · Violation #17176838
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.