Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (North)

2 Ellwood Street, Manhattan

10040 · 150 apartments · 6 stories · City Council district 10

By · Updated · Data from NYC HPD

C
56open immediately hazardous violations · 37 per 100 apartments
B78Hazardous, open
A16Non-hazardous, open
!118Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

8 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning company2 ELLWOOD STREET, LLC
Landlord (head officer or owner)Gary Wollan

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    36
  2. Mold
    21
  3. Peeling paint and plaster
    19
  4. Roaches
    17
  5. Missing smoke or CO detector
    12
  6. Mice or rats
    10
  7. Leaks and water damage
    8
  8. Broken doors or locks
    7
  9. Lead paint
    7
  10. Plumbing, sinks and toilets
    5
  11. Electrical problems
    3
  12. No heat or hot water
    3
  13. Missing window guards
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C153 days
from 212 closed · NYC typical: 84 days
B332 days
from 373 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsProperly repair or replace the broken or defective intercoms system from building front to east wall in the foyerIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19372659
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from building front to east wall in the entranceIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19372661
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at westIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19372662
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling at east wall window casing in the 3rd room from northIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19322467
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall window casing in the 3rd room from northIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19322468
  • C
    Other repairsProperly repair or replace the broken or defective latch set at window gate at fire escape window at north wall in the 2nd room from northIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19331259
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in at bathtub wasteline in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · rent impairing · Violation #19322466
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the 2nd room from northIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19331256
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19322463
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19331257
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19331258
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of at north wall panel box ''c'' section at public hall stairs, 1st storyIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19322462
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19331260
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective hinges at fire door leading to laundry room at basementIssued Oct 28, 2026 · fix by Nov 11, 2026 overdue · Violation #19322464
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19322461
  • C
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash at 2nd window from north at east wall, causing a guillotine effect in the 3rd…Issued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19322460
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 26, 2026 · fix by Nov 19, 2026 · Violation #19330251
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 26, 2026 · fix by Nov 19, 2026 · Violation #19330250
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 26, 2026 · fix by Nov 19, 2026 · Violation #19330248
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19322458
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19322459
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19322457
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 26, 2026 · fix by Nov 19, 2026 · Violation #19330252
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19322465
  • B
    Other repairsProperly repair or replace the broken or defective intercommunication system from the building front to the west wall panel in the foyerIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19323399
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the 4th room from north at eastIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19323400
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline pipe at sink in the kitchenIssued Oct 23, 2026 · fix by Nov 27, 2026 · rent impairing · Violation #19323385
  • B
    Leaks and water damageRepair the broken or defective connection leaky valve at sink in the kitchenIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19323383
  • B
    Other repairsReplace with new the missing escutcheon plate at bottom of riser pipe in the bathroomIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19323380
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 23, 2026 · fix by Nov 27, 2026 · rent impairing · Violation #19323378
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19323376
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the bathroomIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19323375
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story, section ''east ''Issued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19316908
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19172241
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19172239
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19172243
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19172242
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19172240
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19172244
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19146129
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19146128
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19146130
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyerIssued Jun 22, 2026 · fix by Jun 28, 2026 overdue · Violation #19022031
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallwayIssued Jun 22, 2026 · fix by Jun 28, 2026 overdue · Violation #19022028
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Jun 9, 2026 · fix by Jul 14, 2026 overdue · Violation #18995948
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Jun 9, 2026 · fix by Jun 15, 2026 overdue · Violation #18995947
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 16, 2026 · fix by May 12, 2026 overdue · Violation #18788372
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from building entrance to east wall in the 1st room from eastIssued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18788368
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling, east and south wall in the bathroomIssued Apr 14, 2026 · fix by May 10, 2026 overdue · Violation #18792404
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and south wall in the bathroomIssued Apr 13, 2026 · fix by May 9, 2026 overdue · Violation #18791574
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at ceiling, west, east and north walls in the bathroomIssued Apr 3, 2026 · fix by Apr 29, 2026 overdue · Violation #18763063
  • B
    Other repairsProperly repair or replace the broken or defective bell/return buzzer system from building front to west wall in the foyerIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18740275
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the bathroomIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731270
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tile floor in the kitchenIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18731272
  • C
    Broken doors or locksProperly repair or replace the broken or defective approved fireproof self closing door in the entranceIssued Mar 23, 2026 · fix by Mar 29, 2026 overdue · Violation #18731293
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at ceramic tile around bathtub in the bathroomIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18731188
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the bathroomIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18731190
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the bathroomIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18731283
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18731309
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · rent impairing · Violation #18731308

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

792017
472018
782019
802020
1102021
1202022
1932023
2782024
1282025
1862026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,768 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.