Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (South)

353 Ft Washington Avenue, Manhattan

10033 · 36 apartments · 6 stories · City Council district 10

By · Updated · Data from NYC HPD

C
8open immediately hazardous violations · 22 per 100 apartments
B26Hazardous, open
A2Non-hazardous, open
!36Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyALMA TRENTON, LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    16
  2. Other repairs
    10
  3. Mice or rats
    2
  4. Lead paint
    2
  5. Missing smoke or CO detector
    2
  6. Plumbing, sinks and toilets
    2
  7. Roaches
    1
  8. Broken doors or locks
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C207 days
from 20 closed · NYC typical: 87 days
B171 days
from 10 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19298877
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19298878
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19176275
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd private hallway from eastIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19158237
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall at 1st closet from south at west in the 3rd private…Issued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19158238
  • C
    Other repairsProperly repair or replace the broken or defective counter balance at center lower window sash at north wall in the 1st room from east at northIssued Aug 25, 2026 · fix by Aug 31, 2026 overdue · Violation #19158244
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19158245
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19158243
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st private hallway from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19158242
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd private hallway from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19158241
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 25, 2026 · fix by Aug 31, 2026 overdue · Violation #19158240
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19158239
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and west wall in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19158236
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19158235
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Aug 26, 2025 · fix by Sep 19, 2025 overdue · Violation #18187639
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of key operated mortise lock installed at entrance door to room with fire escape access in the 5th room from eastIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18161272
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 30, 2025 · fix by Sep 3, 2025 overdue · Violation #18121495
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 30, 2025 · fix by Sep 3, 2025 overdue · Violation #18121496
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at lower sash at 1st window from north at east wall in the 1st room from east at southIssued Apr 14, 2025 · fix by Apr 20, 2025 overdue · Violation #17820749
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820747
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash 1st window west at north wall in the 1st room from east at northIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820744
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820748
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820743
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 3rd room from eastIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820741
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820740
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st private hallway from eastIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820746
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 15, 2022 · fix by Aug 8, 2022 overdue · Violation #15265371
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls inside the closet in the foyerIssued May 30, 2019 · fix by Jul 4, 2019 overdue · Violation #13092999
  • B
    Other repairsReplace with new the broken or defective lower sash glass at window in the 2nd room from east at northIssued Jun 19, 2017 · fix by Jul 24, 2017 overdue · Violation #11830055
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jun 19, 2017 · fix by Jul 24, 2017 overdue · Violation #11828895
  • B
    Other repairsProperly secure the loose ceramic wall tiles at north and west walls in the bathroomIssued Jun 19, 2017 · fix by Jul 24, 2017 overdue · Violation #11830046
  • B
    Plumbing, sinks and toiletsReplace the broken or defective porcelain enamel at bathtub in the bathroomIssued Jun 19, 2017 · fix by Jul 24, 2017 overdue · rent impairing · Violation #11830047
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallwayIssued Jun 19, 2017 · fix by Jul 24, 2017 overdue · Violation #11830050
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the bathroomIssued Jun 19, 2017 · fix by Jul 24, 2017 overdue · Violation #11830146

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82017
32018
22019
22020
12021
152022
142023
32024
282025
152026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 114 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.