Housing violations · Flatbush
2002 Caton Avenue, Brooklyn
11226 · 83 apartments · 6 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster44
- Other repairs16
- Lead paint13
- Mold11
- Missing smoke or CO detector7
- Broken doors or locks6
- Roaches4
- Mice or rats2
- Leaks and water damage1
- Plumbing, sinks and toilets1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 85 closed · NYC typical: 87 days
from 104 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jun 22, 2026 · fix by Jul 16, 2026 overdue · Violation #19019615
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 18, 2026 · fix by Jul 12, 2026 overdue · Violation #19019541
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 18, 2026 · fix by Jul 12, 2026 overdue · Violation #19019543
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jun 18, 2026 · fix by Jul 12, 2026 overdue · Violation #19019542
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Mar 26, 2026 · fix by Apr 1, 2026 overdue · Violation #18735227
- CMoldTrace and repair the source and abate the visible mold condition greater than 30sq feet at ceiling and all walls in the bathroomIssued Feb 23, 2026 · fix by Mar 21, 2026 overdue · Violation #18654083
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Dec 18, 2025 · fix by Jan 22, 2026 overdue · Violation #18521569
- BOther repairsProperly repair or replace the broken or defective counter balance at upper window sash at north wall in the kitchenIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18250098
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18250095
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18250091
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18250094
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd bathroom from eastIssued Sep 15, 2025 · fix by Oct 20, 2025 overdue · Violation #18224665
- BMoldTrace and repair the source and abate the visible mold condition at ( less than 10 sqft) east wall in the 4th bathroom from eastIssued Mar 24, 2025 · fix by Apr 28, 2025 overdue · Violation #17785194
- BMoldTrace and repair the source and abate the visible mold condition at ( less than 10 sqft ) south wall in the 4th bathroom from eastIssued Mar 24, 2025 · fix by Apr 28, 2025 overdue · Violation #17785195
- CMoldTrace and repair the source and abate the visible mold condition at( greater than 10 sqft) north wall in the 4th bathroom from eastIssued Mar 24, 2025 · fix by Apr 19, 2025 overdue · Violation #17785197
- BMoldTrace and repair the source and abate the visible mold condition at ( less than 10 sqft ) west wall in the 4th bathroom from eastIssued Mar 24, 2025 · fix by Apr 28, 2025 overdue · Violation #17785196
- CMoldTrace and repair the source and abate the visible mold condition at (greater than 10 sqft) ceiling in the 4th bathroom from eastIssued Mar 24, 2025 · fix by Apr 19, 2025 overdue · Violation #17785199
- BMoldTrace and repair the source and abate the visible mold condition at ( less than 10 sqft) window frame from west at north wall in the 4th bathroom from eastIssued Mar 24, 2025 · fix by Apr 28, 2025 overdue · Violation #17785198
- CMoldTrace and repair the source and abate the visible mold condition less than 20 sq.ft at all walls in the bathroomIssued Mar 24, 2025 · fix by Apr 19, 2025 overdue · Violation #17785201
- BMoldTrace and repair the source and abate the visible mold condition at( less than 10 sqft ) ceiling in the 1st room from east at southIssued Mar 24, 2025 · fix by Apr 28, 2025 overdue · Violation #17785200
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). inoperative in the entire apartmentIssued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17409087
- BMissing smoke or CO detectorRepair or replace the smoke detector inoperative in the entire apartmentIssued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17409088
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 12, 2024 · fix by Dec 6, 2024 overdue · Violation #17419976
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of door with lockable knob preventing entrance to fire escape room in the 5th room from east at southIssued Mar 1, 2024 · fix by Mar 7, 2024 overdue · Violation #16715588
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2023 · fix by Aug 17, 2023 overdue · Violation #16121203
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2023 · fix by Aug 17, 2023 overdue · Violation #16121198
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2023 · fix by Aug 17, 2023 overdue · Violation #16121199
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2023 · fix by Aug 17, 2023 overdue · Violation #16121202
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2023 · fix by Aug 17, 2023 overdue · Violation #16121201
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2023 · fix by Aug 17, 2023 overdue · Violation #16121197
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2023 · fix by Aug 17, 2023 overdue · Violation #16121196
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 24, 2023 · fix by Aug 17, 2023 overdue · Violation #16121200
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from eastIssued Sep 28, 2018 · fix by Nov 2, 2018 overdue · Violation #12607245
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 3rd room from east at southIssued Sep 26, 2018 · fix by Oct 31, 2018 overdue · Violation #12603288
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Sep 26, 2018 · fix by Oct 31, 2018 overdue · Violation #12603286
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls ceiling and trims in the 3rd room from eastIssued Sep 26, 2018 · fix by Oct 31, 2018 overdue · Violation #12603285
- BOther repairsProperly repair the broken or defective sloping wood floor in the private hallwayIssued Sep 5, 2018 · fix by Oct 10, 2018 overdue · Violation #12560300
- BMice or ratsAbate the nuisance consisting of mice in the kitchenIssued Sep 5, 2018 · fix by Oct 10, 2018 overdue · Violation #12560353
- BOther repairsProperly repair the broken or defective and/or make operable lower window sash in the bathroomIssued Sep 5, 2018 · fix by Oct 10, 2018 overdue · Violation #12560370
- BElectrical problemsProperly repair the broken or defective electric outlet at north wall in the kitchenIssued Jul 6, 2018 · fix by Aug 10, 2018 overdue · Violation #12451759
- BOther repairsProperly repair the broken or defective wood floor (bulging) in the foyerIssued Jul 6, 2018 · fix by Aug 10, 2018 overdue · Violation #12451729
- BBroken doors or locksReplace with new the broken or defective marble saddle at entrance door in the entranceIssued Jul 6, 2018 · fix by Aug 10, 2018 overdue · Violation #12451746
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchenIssued Jul 6, 2018 · fix by Aug 10, 2018 overdue · Violation #12451755
- BMice or ratsAbate the nuisance consisting of mice in the kitchenIssued Jul 6, 2018 · fix by Aug 10, 2018 overdue · Violation #12451756
- BRoachesAbate the nuisance consisting of roaches in the kitchenIssued Jul 6, 2018 · fix by Aug 10, 2018 overdue · Violation #12451760
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Jun 28, 2018 · fix by Aug 2, 2018 overdue · Violation #12451799
- BOther repairsProperly repair with similar material the broken or defective sloping wood floor in the private hallwayIssued Jun 28, 2018 · fix by Aug 2, 2018 overdue · Violation #12451721
- BOther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Oct 19, 2017 · fix by Nov 23, 2017 overdue · rent impairing · Violation #12025130
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Oct 12, 2017 · fix by Nov 16, 2017 overdue · Violation #12012489
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Oct 12, 2017 · fix by Nov 16, 2017 overdue · Violation #12012502
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south and east walls in the 2nd private hallway from northIssued Jul 3, 2017 · fix by Aug 7, 2017 overdue · Violation #11855326
- BMissing smoke or CO detectorRepair or replace the smoke detector defectiveIssued Jul 3, 2017 · fix by Aug 7, 2017 overdue · Violation #11855336
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defectiveIssued Jul 3, 2017 · fix by Aug 7, 2017 overdue · Violation #11855338
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st private hallway from northIssued Jul 3, 2017 · fix by Aug 7, 2017 overdue · Violation #11855421
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west and east walls in the 3rd room from east at northIssued Jul 3, 2017 · fix by Aug 7, 2017 overdue · Violation #11855446
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Jul 3, 2017 · fix by Aug 7, 2017 overdue · Violation #11855320
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defectiveIssued Sep 16, 2014 · fix by Oct 21, 2014 overdue · Violation #10381754
- BMissing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector missingIssued Sep 16, 2014 · fix by Oct 21, 2014 overdue · Violation #10381746
- BMoldTrace and repair the source and abate the nuisance consisting of mold and mildew at ceiling and north wall / 2square feet / in the 2nd room from east at northIssued Jul 2, 2014 · fix by Aug 6, 2014 overdue · Violation #10294468
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Jul 2, 2014 · fix by Aug 6, 2014 overdue · Violation #10294461
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.