Housing violations · Bedford-Stuyvesant (East)
354 Chauncey Street, Brooklyn
11233 · 16 apartments · 4 stories · City Council district 41
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs65
- Roaches30
- Peeling paint and plaster30
- Mice or rats29
- Broken doors or locks24
- Mold19
- Leaks and water damage11
- Missing smoke or CO detector10
- Electrical problems5
- Plumbing, sinks and toilets4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 95 closed · NYC typical: 87 days
from 103 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BBroken doors or locksProperly repair or replace the broken or defective latch set and it's assembly at vestibule door at public hall, 1st storyIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296551
- BBroken doors or locksProperly repair or replace the broken or defective latch set and it's assembly at building entrance doorIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19296549
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance , 1st storyIssued Sep 25, 2026 · fix by Oct 1, 2026 overdue · Violation #19239699
- CBroken doors or locksReplace with new the missing knob at interior of building entrance door , 1st storyIssued Sep 25, 2026 · fix by Oct 1, 2026 overdue · Violation #19239698
- CBroken doors or locksProperly repair or replace the broken or defective mortice lock at building entrance door at public hallIssued Sep 25, 2026 · fix by Oct 1, 2026 overdue · Violation #19238742
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty lock at building entrance door , 1st storyIssued Sep 18, 2026 · fix by Sep 24, 2026 overdue · Violation #19215770
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19111475
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19111474
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective defective hinges in the entranceIssued Aug 10, 2026 · fix by Aug 24, 2026 overdue · Violation #19111476
- BOther repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070237
- BOther repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19070236
- BBroken doors or locksProperly repair or replace the broken or defective mail box door for unit 7 at public hall, 1st storyIssued Jun 3, 2026 · fix by Jul 8, 2026 overdue · Violation #18974703
- BOther repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18807056
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash ,at 1st window from west at north in the 1st room from northIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18793965
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the furniture and rubbish at building front yard yardIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18793966
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18793964
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18746747
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18746749
- BOther repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Mar 17, 2026 · fix by Apr 21, 2026 overdue · Violation #18717249
- BOther repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Mar 17, 2026 · fix by Apr 21, 2026 overdue · Violation #18717248
- BOther repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18576893
- BOther repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18576894
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq ft at north wall in the kitchenIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18550900
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at north wall in the kitchenIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18473974
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall in the kitchenIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18473859
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at north wall in the kitchenIssued Nov 26, 2025 · fix by Dec 31, 2025 overdue · Violation #18465488
- COther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 4th room from northIssued Nov 18, 2025 · fix by Nov 24, 2025 overdue · Violation #18379570
- COther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Nov 18, 2025 · fix by Nov 24, 2025 overdue · Violation #18379569
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 18, 2025 · fix by Dec 14, 2025 overdue · Violation #18379566
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq feet at ceiling and all walls in the bathroomIssued Nov 18, 2025 · fix by Dec 14, 2025 overdue · Violation #18379571
- COther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from northIssued Oct 31, 2025 · fix by Nov 6, 2025 overdue · Violation #18339366
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock in the entranceIssued Oct 31, 2025 · fix by Nov 6, 2025 overdue · Violation #18339384
- BOther repairs& 309 m/d law abate the nuisance consisting of 1st riser before 4th story landing non conforming with prior risers at public hall, 3rd storyIssued Oct 17, 2025 · fix by Nov 21, 2025 overdue · Violation #18300529
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance , 1st storyIssued Oct 17, 2025 · fix by Oct 31, 2025 overdue · Violation #18300527
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 5, 2025 · fix by Oct 1, 2025 overdue · Violation #18205481
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at south and north wall in the bathroomIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18205479
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18205478
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Sep 5, 2025 · fix by Sep 19, 2025 overdue · Violation #18205482
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 5, 2025 · fix by Oct 1, 2025 overdue · Violation #18205480
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash window at south wall in the 4th room from northIssued Aug 6, 2025 · fix by Sep 10, 2025 overdue · Violation #18114618
- BBroken doors or locksProperly repair or replace the broken or defective wood door at entrance in the 4th room from northIssued Aug 6, 2025 · fix by Sep 10, 2025 overdue · Violation #18114619
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of lockable knob at door preventing entry to fire escape window in the 4th room from northIssued Aug 6, 2025 · fix by Aug 12, 2025 overdue · Violation #18114620
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued Jul 31, 2025 · fix by Sep 4, 2025 overdue · Violation #18123300
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 31, 2025 · fix by Aug 14, 2025 overdue · Violation #18123302
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 31, 2025 · fix by Aug 26, 2025 overdue · Violation #18123298
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Jul 31, 2025 · fix by Sep 4, 2025 overdue · Violation #18123299
- BOther repairsProperly repair or replace the broken or defective wood cabinet base at floor cabinet in the kitchenIssued Jul 31, 2025 · fix by Sep 4, 2025 overdue · Violation #18123296
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 31, 2025 · fix by Aug 26, 2025 overdue · Violation #18123297
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the bathroomIssued Jul 30, 2025 · fix by Sep 3, 2025 overdue · Violation #18114621
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at east and south walls in the bathroomIssued Jul 30, 2025 · fix by Sep 3, 2025 overdue · Violation #18114622
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Jul 30, 2025 · fix by Sep 3, 2025 overdue · Violation #18114623
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 30, 2025 · fix by Aug 13, 2025 overdue · Violation #18114625
- BOther repairsProperly repair with similar material the broken or defective ceramic tile floor in the kitchenIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18126280
- BOther repairsReplace with new the missing escutcheon plate at steam riser at ceiling in the 1st room from northIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18126286
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18126285
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroomIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18126283
- BOther repairsReplace with new the missing escutcheon plate at steam riser at ceiling in the 1st room from northIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18126264
- BOther repairsReplace with new the missing escutcheon plate at steam riser at ceiling in the kitchenIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18126261
- BBroken doors or locksProperly secure the loose door at entrance in the 4th room from northIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18126478
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2025 · fix by Aug 24, 2025 overdue · Violation #18126477
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.