Housing violations · Flatbush
1820 Cortelyou Road, Brooklyn
11226 · 42 apartments · 6 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Leaks and water damage18
- Peeling paint and plaster17
- Other repairs15
- Broken doors or locks13
- Lead paint6
- Mold5
- Roaches5
- Missing smoke or CO detector4
- Electrical problems3
- Mice or rats3
- Plumbing, sinks and toilets2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 62 closed · NYC typical: 87 days
from 146 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19323925
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323918
- BBroken doors or locksProperly repair with similar material the broken or defective wood door frame at entrance in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19323919
- BElectrical problemsProperly repair or replace the broken or defective electric outlet at east wall in the 2nd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274360
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19274390
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19274391
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19274394
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Oct 5, 2026 · fix by Oct 19, 2026 overdue · Violation #19274331
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261410
- BMoldTrace and repair the source and abate the visible mold condition less than 30 sq ft observed at ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261383
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261385
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 30, 2026 · fix by Oct 14, 2026 overdue · Violation #19261391
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261411
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from northIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261418
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 30, 2026 · fix by Oct 14, 2026 overdue · Violation #19261468
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at north wall in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19261456
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 31, 2026 · fix by Sep 14, 2026 overdue · Violation #19170847
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19170854
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19170855
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall in the 1st room from northIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19151655
- BBroken doors or locksRefit the door in the entranceIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19039305
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786714
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 20, 2026 · fix by May 16, 2026 overdue · Violation #18786705
- BBroken doors or locksProperly repair or replace the broken or defective upper cabinet doors at west wall in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786703
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 20, 2026 · fix by May 16, 2026 overdue · Violation #18786723
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786722
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786721
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786720
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 2nd room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18786724
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and west wall in the 2nd room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786725
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18786718
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786717
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786716
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18786715
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786713
- BOther repairsProperly repair with similar material the broken or defective wood maulding at window recess in the 2nd room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786726
- BOther repairsProperly repair with similar material the broken or defective window casing in the 1st room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786711
- BOther repairsReplace with new the missing wood maulding at window at east in the kitchenIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786719
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east and north walls in the 1st room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786710
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 1st room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786708
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · rent impairing · Violation #18786707
- BBroken doors or locksReplace with new the missing wood moulding at door frame in the 2nd room from northIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18786706
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 30, 2026 · fix by Apr 25, 2026 overdue · Violation #18737439
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Feb 13, 2026 · fix by Feb 27, 2026 overdue · Violation #18638223
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 1st bathroom from east at northIssued Feb 13, 2026 · fix by Feb 19, 2026 overdue · Violation #18638222
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the 1st bathroom from east at northIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441914
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, north, east and west walls, in the kitchenIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441915
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wsste pipe of the bathtub drainage, in the 1st bathroom from east at northIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · rent impairing · Violation #18441916
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north and west walls in the 1st bathroom from east at northIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441918
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at window stil 1st from north at east, in the 1st bathroom from east at northIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441919
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, south and west walls in the 1st bathroom from east at northIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441920
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, north and west walls, in the 1st bathroom from east at southIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441921
- BOther repairsProperly repair with similar material the broken or defective caulking and ceramic tiles at ceiling, south and west walls around shower stall, in the 1st…Issued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441923
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at window sill 1st from north at east in the 1st bathroom from east at southIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441924
- BOther repairsReplace with new the missing metal escutcheon plate at the ceiling of the heat riser 1st from north, in the 1st bathroom from east at southIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441925
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and south wall, in the 3rd room from east at southIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441927
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and south wall, in the 2nd room from east at southIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441928
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling,north, east and south walls, in the 1st room from east at southIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441929
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at southIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441930
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441933
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.