Housing violations · Flatbush
15 Crooke Avenue, Brooklyn
11226 · 54 apartments · 6 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs10
- Peeling paint and plaster10
- Broken doors or locks8
- Mold7
- Lead paint7
- Missing smoke or CO detector5
- Mice or rats4
- Roaches3
- Leaks and water damage1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 49 closed · NYC typical: 87 days
from 109 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building front entrance door , 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19305041
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance door 1st story at public hall, 1st storyIssued Oct 16, 2026 · fix by Oct 30, 2026 overdue · Violation #19301263
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at east wall in the bathroomIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19242343
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 3, 2026 · fix by Sep 17, 2026 overdue · Violation #19182876
- BOther repairsProperly repair or replace the broken or defective intercom system from building front to west wall in the foyerIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19182875
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19145167
- BOther repairsProperly repair or replace the broken or defective the exhaust ventialation system at north wall in the kitchenetteIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19145178
- BBroken doors or locksProperly repair or replace the broken or defective gasket at refrigerator door in the kitchenetteIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19145180
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Aug 17, 2026 · fix by Sep 10, 2026 overdue · Violation #19150577
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 17, 2026 · fix by Aug 23, 2026 overdue · Violation #19145226
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 17, 2026 · fix by Aug 23, 2026 overdue · Violation #19145228
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19145174
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19145164
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Aug 17, 2026 · fix by Sep 10, 2026 overdue · Violation #19150579
- BElectrical problemsProperly repair or replace the broken or defective cracked electrical light switch cover at north wall in the kitchenetteIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19145181
- COther repairsFire escape defective. replace with new the broken, defective and/or missing corner plate at east corner of front top and return rail at balcony at building…Issued Jun 25, 2026 · fix by Jul 1, 2026 overdue · rent impairing · Violation #19028844
- COther repairsFire escape defective. replace with new the broken, defective and/or missing corner plate at west corner of front top and return rail at balcony at building…Issued Jun 25, 2026 · fix by Jul 1, 2026 overdue · rent impairing · Violation #19028846
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jun 5, 2026 · fix by Jul 1, 2026 overdue · rent impairing · Violation #18988853
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18988859
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18988856
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartmentIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18988854
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18968170
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the 1st room from eastIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18968165
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18968167
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door in the entranceIssued May 26, 2026 · fix by Jun 9, 2026 overdue · Violation #18949692
- BOther repairsProperly repair with similar material the broken or defective uneven wood floor in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18949688
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18949691
- BMoldTrace and repair the source and abate the visible mold condition less than 1o sqft at ceiling in the bathroomIssued May 12, 2026 · fix by Jun 16, 2026 overdue · Violation #18931445
- BMoldTrace and repair the source and abate the visible mold condition less than 1o sqft at east wall in the 1st room from east at southIssued May 12, 2026 · fix by Jun 16, 2026 overdue · Violation #18931446
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 12, 2026 · fix by Feb 7, 2026 overdue · Violation #18558732
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 12, 2026 · fix by Feb 7, 2026 overdue · Violation #18558733
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at east wall in the 1st room from east at northIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18558730
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 24, 2025 · fix by Nov 19, 2025 overdue · Violation #18317957
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Apr 4, 2025 · fix by Apr 28, 2025 overdue · Violation #17808989
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 3, 2025 · fix by Apr 27, 2025 overdue · Violation #17808142
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 3, 2025 · fix by Apr 27, 2025 overdue · Violation #17808141
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Apr 3, 2025 · fix by Apr 27, 2025 overdue · Violation #17808139
- BBroken doors or locksProperly repair or replace the broken or defective wood door saddle at south wall in the kitchenIssued Jul 18, 2024 · fix by Aug 22, 2024 overdue · Violation #17117356
- BOther repairsProperly repair or replace the broken or defective fuse box open , with missing fuses, at east wall , in the private hallwayIssued Jul 18, 2024 · fix by Aug 22, 2024 overdue · Violation #17117368
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchenIssued Jul 18, 2024 · fix by Jul 24, 2024 overdue · Violation #17117380
- BBroken doors or locksProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at defucft and unlocked fuse box, at west wall , in the…Issued Jul 2, 2024 · fix by Aug 6, 2024 overdue · Violation #17085683
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at, west, east , north and south walls in the 3rd bathroom from eastIssued Jul 2, 2024 · fix by Aug 6, 2024 overdue · Violation #17085671
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall and ceiling in the kitchenIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17060754
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall and ceiling in the bathroomIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17060751
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Jan 30, 2023 · fix by Feb 23, 2023 overdue · Violation #15690545
- COther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued Jul 12, 2021 · fix by Jul 18, 2021 overdue · Violation #14429587
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 26, 2021 · fix by May 22, 2021 overdue · Violation #14306564
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 26, 2021 · fix by May 22, 2021 overdue · Violation #14306565
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.