Housing violations · Washington Heights (North)
25 Hillside Avenue, Manhattan
10040 · 143 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs23
- Peeling paint and plaster19
- Broken doors or locks6
- Roaches6
- Mice or rats5
- Mold4
- Leaks and water damage4
- Lead paint2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 67 closed · NYC typical: 87 days
from 143 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective spring balance at upper sash at 2nd window from south at west wall in the 1st room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320517
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at 1st hopper chute door from north at east wall at public hall, 3rd story,…Issued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19320525
- BOther repairsProperly repair or replace the broken or defective spring balance at upper sash at 1st window from east at south wall in the 1st room from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320524
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19320523
- BOther repairsProperly repair or replace the broken or defective spring balance at upper sash at 2nd window from east at south wall in the 4th room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320522
- BOther repairsProperly repair or replace the broken or defective spring balance at upper sash at 1st window from east at south wall in the 4th room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320521
- BOther repairsProperly repair or replace the broken or defective spring balance at upper sash at 2nd window from east at south wall in the 1st room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320520
- BOther repairsProperly repair or replace the broken or defective spring balance at upper sash at 1st window from east at south wall in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320519
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash at 1st window from south at west wall in the 4th room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19320518
- BOther repairsProperly repair or replace the broken or defective spring balance at lower and upper window sash 1st window at south wall in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307003
- BOther repairsProperly repair or replace the broken or defective spring balance at lower and upper window sash 2nd window at south wall in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307004
- CMoldTrace and repair the source and abate the visible mold condition greater than 10sqft at ceiling and east wall in the bathroomIssued Oct 16, 2026 · fix by Nov 11, 2026 overdue · Violation #19309812
- BOther repairsProperly repair or replace the broken or defective counter balance at lower sash at 3rd window from norht at east in the 1st room from eastIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19275128
- BOther repairsReplace with new the missing upper escutcheon plate at heat riser pipe in the bathroomIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19275130
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes the flower pots at the 1st stack from east at south at the 2nd…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210911
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 3, 2026 · fix by Sep 17, 2026 overdue · Violation #19176580
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the kitchenIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19176582
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from northIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176577
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from northIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176578
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 1st room from northIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176576
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176575
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176574
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles. in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156152
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19139113
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19139111
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color window reveal at north wall in the 3rd room from eastIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19139112
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and walls in the 1st room from northIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18529902
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 14, 2025 · fix by May 10, 2025 overdue · Violation #17822666
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 14, 2025 · fix by May 10, 2025 overdue · Violation #17822667
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 28, 2024 · fix by Nov 23, 2024 overdue · Violation #17374010
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 4, 2024 · fix by Oct 30, 2024 overdue · Violation #17319997
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 3, 2024 · fix by Oct 29, 2024 overdue · Violation #17313761
- BMoldTrace and repair the source and abate the visible mold condition approximately 2 sqft at north wall in the 1st room from north at eastIssued Jun 4, 2024 · fix by Jul 9, 2024 overdue · Violation #17025429
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling and the north wall in the 3rd room from eastIssued Mar 11, 2024 · fix by Apr 15, 2024 overdue · Violation #16734247
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and the north wall in the 3rd room from eastIssued Mar 11, 2024 · fix by Apr 15, 2024 overdue · Violation #16734248
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 12, 2024 · fix by Mar 7, 2024 overdue · Violation #16669065
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 12, 2024 · fix by Mar 7, 2024 overdue · Violation #16669066
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Feb 5, 2024 · fix by Mar 11, 2024 overdue · Violation #16653672
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the foyerIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491003
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 7, 2020 · fix by Jan 28, 2020 overdue · Violation #13490999
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling ,east and south wall's in the bathroomIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491000
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from eastIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491004
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 7, 2020 · fix by Jan 28, 2020 overdue · Violation #13490998
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock installed on door to escape window in the 3rd room from eastIssued Jan 7, 2020 · fix by Jan 15, 2020 overdue · Violation #13491011
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the 3rd room from eastIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491008
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued Aug 23, 2019 · fix by Sep 27, 2019 overdue · Violation #13238306
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the private hallwayIssued Aug 23, 2019 · fix by Sep 27, 2019 overdue · Violation #13238314
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the foyerIssued Aug 23, 2019 · fix by Sep 27, 2019 overdue · Violation #13238330
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 23, 2019 · fix by Sep 13, 2019 overdue · Violation #13238340
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 23, 2019 · fix by Sep 13, 2019 overdue · Violation #13240005
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 23, 2019 · fix by Sep 13, 2019 overdue · Violation #13240006
- BBroken doors or locksReplace with new the broken or defective rubber gasket at refridgerator and freezer door in the kitchenIssued Aug 23, 2019 · fix by Sep 27, 2019 overdue · Violation #13238337
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroomIssued Aug 23, 2019 · fix by Sep 27, 2019 overdue · Violation #13238305
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.