Housing violations · Crown Heights (South)
825 Crown Street, Brooklyn
11213 · 54 apartments · 6 stories · City Council district 41
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster22
- Other repairs20
- Lead paint11
- Broken doors or locks9
- Mold9
- Mice or rats5
- Bedbugs3
- Leaks and water damage3
- Electrical problems3
- Roaches3
- No heat or hot water2
- Missing smoke or CO detector2
- Missing window guards1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 6 closed · NYC typical: 87 days
from 10 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling south and west wall in the private hallwayIssued Feb 9, 2026 · fix by Feb 15, 2026 overdue · Violation #18620626
- CLeaks and water damageRepair the roof so that it will not leak above ceiling in the private hallwayIssued Feb 9, 2026 · fix by Feb 15, 2026 overdue · rent impairing · Violation #18620627
- BLeaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 6th storyIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · rent impairing · Violation #18555734
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 6th storyIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18555735
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 6th story balcony at 1st from…Issued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18394459
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 20, 2025 · fix by Jul 14, 2025 overdue · Violation #18050981
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 20, 2025 · fix by Jul 14, 2025 overdue · Violation #18050983
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jun 20, 2025 · fix by Jul 16, 2025 overdue · Violation #18039021
- BElectrical problemsProperly repair or replace the broken or defective electric outlet at west wall in the 3rd room from east at southIssued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18039020
- BOther repairsProperly repair or replace the broken or defective si k base cabinet in the kitchenIssued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18039019
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18039017
- CBroken doors or locksProvide ready access to buildings heating system locked door at cellar at boiler roomIssued Feb 3, 2025 · fix by Feb 9, 2025 overdue · Violation #17666076
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 3, 2025 · fix by Feb 2, 2025 overdue · rent impairing · Violation #17666075
- BBroken doors or locksRefit double fire doors at north at public hall, 6th storyIssued Jan 23, 2025 · fix by Feb 27, 2025 overdue · Violation #17635396
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Jan 17, 2025 · fix by Feb 21, 2025 overdue · Violation #17617349
- BBroken doors or locksRefit at fire door at public hall, 6th storyIssued Jan 17, 2025 · fix by Feb 21, 2025 overdue · Violation #17617350
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17545840
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 12, 2024 · fix by Jan 7, 2025 overdue · Violation #17545838
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 12, 2024 · fix by Jan 7, 2025 overdue · Violation #17545839
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 12, 2024 · fix by Dec 26, 2024 overdue · Violation #17545842
- BOther repairsReplace with new the missing escutcheon plate at ceiling in the bathroomIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17545841
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 25, 2024 · fix by Dec 1, 2024 overdue · Violation #17424753
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17424751
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 25, 2024 · fix by Dec 21, 2024 overdue · Violation #17424754
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 18, 2024 · fix by Nov 18, 2024 overdue · rent impairing · Violation #17424752
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 3, 2024 · fix by Oct 29, 2024 overdue · Violation #17318728
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17221376
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 24, 2024 · fix by Oct 20, 2024 overdue · Violation #17221378
- BOther repairsProperly repair or replace the broken or defective bell and buzzer intercom system from the building entrance to the east wall panel in the private hallwayIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17221377
- BMoldProperly repair or replace the broken or defective missing floor transitional molding. in the private hallwayIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17221375
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17221373
- COther repairsProvide an adequate supply of gas to the fixtures at range in the entire apartmentIssued Sep 24, 2024 · fix by Sep 30, 2024 overdue · rent impairing · Violation #17221374
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Sep 3, 2024 · fix by Oct 8, 2024 overdue · Violation #17221371
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 14, 2024 · fix by Jun 9, 2024 overdue · Violation #16976425
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the frame at entrance in the kitchenIssued May 14, 2024 · fix by Jun 18, 2024 overdue · Violation #16976429
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th storyIssued May 7, 2024 · fix by Jun 11, 2024 overdue · Violation #16960060
- CMoldTrace and repair the source and abate the visible mold condition at west wall (approx. 12 sq ft) and south wall (approx. 9 sq ft) in the bathroomIssued Aug 21, 2023 · fix by Sep 16, 2023 overdue · Violation #16178702
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at northIssued Aug 21, 2023 · fix by Sep 25, 2023 overdue · Violation #16177793
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Sep 19, 2022 · fix by Oct 13, 2022 overdue · Violation #15379124
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling ceiling in the 2nd room from east at northIssued Sep 15, 2022 · fix by Oct 20, 2022 overdue · Violation #15377876
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at northIssued Sep 15, 2022 · fix by Oct 20, 2022 overdue · Violation #15377875
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, and west wall in the 4th room from northIssued Jul 5, 2022 · fix by Aug 9, 2022 overdue · Violation #15246634
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Jun 2, 2022 · fix by Jul 7, 2022 overdue · Violation #15190520
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 3rd room from northIssued Jun 2, 2022 · fix by Jul 7, 2022 overdue · Violation #15190569
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 2, 2022 · fix by Jun 28, 2022 overdue · Violation #15190527
- BMoldTrace and repair the source and abate the visible mold condition at south wall, total 20 sq ft in the kitchenIssued Feb 3, 2022 · fix by Mar 10, 2022 overdue · Violation #14811362
- COther repairsReplace with new the broken or defective glass pane at upper sash window in the 2nd room from northIssued Nov 23, 2021 · fix by Nov 29, 2021 overdue · Violation #14695232
- COther repairsReplace with new the broken or defective glass pane at window upper sash in the bathroomIssued Oct 4, 2021 · fix by Oct 10, 2021 overdue · Violation #14590867
- BMoldTrace and repair the source and abate the visible mold condition at south wall approx. 3 sq.ft. in the bathroomIssued Mar 4, 2021 · fix by Apr 8, 2021 overdue · Violation #14052715
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the house hold articles and construction materials throughout at cellarIssued Oct 23, 2020 · fix by Nov 27, 2020 overdue · Violation #13864711
- BMoldTrace and repair the source and abate the visible mold condition approximately 4 square feet at ceiling in the bathroomIssued Jun 23, 2020 · fix by Jul 28, 2020 overdue · Violation #13704083
- BMoldTrace and repair the source and abate the visible mold condition at west wall in the bathroomIssued May 6, 2020 · fix by Jun 10, 2020 overdue · Violation #13670338
- BMoldTrace and repair the source and abate the visible mold condition at ( approximately 3sqft at window frame east wall) in the bathroomIssued Mar 31, 2020 · fix by May 5, 2020 overdue · Violation #13659875
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the 4th room from northIssued Jan 6, 2020 · fix by Feb 10, 2020 overdue · Violation #13534796
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 6, 2020 · fix by Feb 3, 2020 overdue · Violation #13535281
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling and walls through out at cellarIssued Dec 31, 2019 · fix by Jan 8, 2020 overdue · Violation #13522696
- BMoldTrace and repair the source and abate the visible mold condition at south wall, total 3 sq ft in the bathroomIssued Sep 3, 2019 · fix by Oct 8, 2019 overdue · Violation #13258775
- BMoldTrace and repair the source and abate the nuisance consisting of mold at ceiling approx 2 sq ft in the bathroomIssued Sep 26, 2018 · fix by Oct 31, 2018 overdue · Violation #12598890
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from northIssued Jul 31, 2012 · fix by Sep 4, 2012 overdue · Violation #9507686
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartmentIssued Sep 3, 2008 · fix by Oct 8, 2008 overdue · Violation #7450034
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.