Housing violations · Kingsbridge-Marble Hill
18 Jacobus Place, Manhattan
10463 · 67 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
10 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs51
- Peeling paint and plaster24
- Roaches11
- Broken doors or locks9
- Leaks and water damage5
- Missing smoke or CO detector4
- Lead paint3
- Mold3
- Mice or rats3
- Electrical problems2
- Plumbing, sinks and toilets2
- No heat or hot water2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 142 closed · NYC typical: 87 days
from 278 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective hard wood floor in the foyerIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19362279
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19369808
- COther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at stack at building front , 1st storyIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · rent impairing · Violation #19362281
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19362280
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19362277
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19369812
- BOther repairsProperly repair with similar material the broken or defective wood subfloor in the 1st room from east at northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326816
- BMoldTrace and repair the source and abate the visible mold condition less than 30 sq feet observed at the ceiling north and west walls in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326830
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326825
- BOther repairsProperly repair or replace the broken or defective light switch at east in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326821
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east walls in the 1st room from east at northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326817
- BOther repairsProperly repair with similar material the broken or defective wood subfloor in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326824
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the 1st room from east at northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326819
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling east, north, west and south walls in the 1st room from east at northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326818
- BOther repairsProperly repair with similar material the broken or defective vinyl floors in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326820
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east walls in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326822
- BOther repairsProperly repair with similar material the broken or defective marble saddle at entrance in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326829
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326827
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles and east and west in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19326826
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19326836
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north walls in the 4th room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19326835
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19326815
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 6th storyIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19326840
- BOther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at north exterior wall at fire escapeIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19326837
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19326834
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19326832
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19326814
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19326833
- BOther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at 1st stack from north at building west at fire escapeIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19275619
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19210954
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19210950
- CLead paintProperly repair or replace the broken or defective legal gate at window leading to fire escape at the first window from west at north wall in the kitchenIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · Violation #19210945
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210947
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210949
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19210946
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the household items, wood planks and boxes at rear yardIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210956
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 14, 2026 · fix by Oct 10, 2026 overdue · rent impairing · Violation #19210957
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210948
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210955
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19204402
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19204401
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19204403
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the basementIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19145980
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19181094
- COther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Aug 26, 2026 · fix by Sep 1, 2026 overdue · Violation #19166928
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19165599
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at secondary egress door at south wall in the 1st room from eastIssued Aug 25, 2026 · fix by Sep 8, 2026 overdue · Violation #19165596
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash at 1st window from south at west wall in the kitchenIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19165604
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 25, 2026 · fix by Sep 8, 2026 overdue · Violation #19165600
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 25, 2026 · fix by Sep 20, 2026 overdue · Violation #19165598
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jul 27, 2026 · fix by Aug 22, 2026 overdue · rent impairing · Violation #19094700
- BOther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building rear at fire escapeIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · rent impairing · Violation #19094701
- BOther repairsReplace with new the missing metal escutcheon plate at riser at ceiling in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065916
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065914
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065912
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the bathroomIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19069504
- BOther repairsProperly repair or replace the broken or defective uppers and base cabinets at south wall in the kitchenIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19049896
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchenIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19047197
- CRoachesAbate the infestation consisting of roaches in the kitchenIssued Jul 6, 2026 · fix by Aug 1, 2026 overdue · Violation #19049895
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the kitchenIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19047196
See every open violation on HPD Online, the city's official site. Violation numbers match.