Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (North)

531 Lenox Avenue, Manhattan

10037 · 10 apartments · 5 stories · City Council district 9

By · Updated · Data from NYC HPD

C
46open immediately hazardous violations · 460 per 100 apartments
B155Hazardous, open
A66Non-hazardous, open
!268Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyBUFNY JV LLC
Landlord (head officer or owner)Kiumarz Geula

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    84
  2. Peeling paint and plaster
    46
  3. Leaks and water damage
    36
  4. Broken doors or locks
    26
  5. Missing smoke or CO detector
    25
  6. Plumbing, sinks and toilets
    16
  7. Electrical problems
    10
  8. Mice or rats
    10
  9. Roaches
    9
  10. Mold
    6
  11. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C55 days
from 12 closed · NYC typical: 87 days
B42 days
from 8 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 16, 2026 · fix by Aug 11, 2026 overdue · Violation #19072536
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at…Issued Jul 16, 2026 · fix by Jul 22, 2026 overdue · Violation #19072550
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 16, 2026 · fix by Jul 30, 2026 overdue · Violation #19072534
  • B
    Electrical problemsReplace with new the missing outlet cover at south wall in the kitchenIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18878583
  • B
    Electrical problemsReplace with new the missing outlet cover at north wall in the 1st room from eastIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18878585
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the 2nd bathroom from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18878581
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 11, 2026 · fix by Jun 6, 2026 overdue · Violation #18878582
  • B
    Electrical problemsProperly repair or replace the broken or defective outlet at east wall in the 6th room from east at southIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18878584
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and south wall in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827376
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 1st room from east at northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827379
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 1st room from east at southIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827378
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at the ceiling in the 1st room from east at southIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827377
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlets at the north wall, west wall, and south wall in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827373
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827372
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 3rd room from eastIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827371
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and north wall in the 5th room from east at southIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827369
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the foyerIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827368
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the foyerIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827367
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the private hallwayIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827366
  • B
    Other repairsProperly repair with similar material the broken or defective wood vanity cabinet at east wall in the 1st bathroom from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827361
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 1st bathroom from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827357
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling, east wall, north wall, and south wall in the 1st bathroom from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827356
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at the ceiling, north wall, and east wall in the 2nd bathroom…Issued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827337
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling, north wall, and east wall in the 2nd bathroom from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827349
  • B
    Other repairsProperly repair with similar material the broken or defective wood vanity cabinet at east wall in the 2nd bathroom from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827348
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood door at entrance in the 5th room from east at southIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827347
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 5th room from east at northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827346
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 4, 2026 · fix by May 30, 2026 overdue · Violation #18827344
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827343
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827355
  • B
    Other repairsProperly repair or replace the broken or defective mechanical ventilation system at west wall in the 2nd bathroom from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827353
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the private hallwayIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827365
  • B
    Other repairsProperly repair or replace the broken or defective mechanical ventilation system at the east wall in the 1st bathroom from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827364
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the 1st bathroom from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827340
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 2nd bathroom from northIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827339
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 1st bathroom from northIssued May 4, 2026 · fix by May 10, 2026 overdue · Violation #18827341
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827374
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 4, 2026 · fix by May 30, 2026 overdue · Violation #18827354
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 5th room from east at southIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827345
  • C
    Plumbing, sinks and toiletsProperly secure the loose wash basin in the 1st bathroom from northIssued May 4, 2026 · fix by May 10, 2026 overdue · Violation #18827360
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection at the waste line at wash basin in the 1st bathroom from northIssued May 4, 2026 · fix by May 10, 2026 overdue · Violation #18827359
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection at the waste line of wash basin in the 2nd bathroom from northIssued May 4, 2026 · fix by May 10, 2026 overdue · Violation #18827350
  • C
    Plumbing, sinks and toiletsProperly secure the loose wash basin in the 2nd bathroom from northIssued May 4, 2026 · fix by May 10, 2026 overdue · Violation #18827342
  • C
    Mice or ratsAbate the infestation consisting of mice at public hall, 1st storyIssued May 4, 2026 · fix by May 30, 2026 overdue · Violation #18827381
  • B
    Other repairsProperly repair with similar material the broken or defective wood saddle in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18827375
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 1 square feet at ceiling in the 2nd bathroom from northIssued Dec 18, 2025 · fix by Jan 22, 2026 overdue · Violation #18521565
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254014
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the kitchenIssued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254010
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254011
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254013
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from eastIssued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18254012
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 7th room from north at eastIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18169008
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18169010
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18169004
  • B
    Plumbing, sinks and toilets& 309 m/d law abate the nuisance consisting of inadequate water pressure at sink/washbasin in the kitchenIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18169012
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18169005
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18169006
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 7th room from north at eastIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18169007
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at the basement at boiler roomIssued May 1, 2025 · fix by May 7, 2025 overdue · Violation #17860462
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Apr 28, 2025 · fix by May 4, 2025 overdue · Violation #17854656

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

192017
22018
582019
242020
12021
362022
432023
372024
212025
692026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 341 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.