Housing violations · Gravesend (East)-Homecrest
2411 East 3 Street, Brooklyn
11223 · 70 apartments · 6 stories · City Council district 44
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster60
- Mold22
- Other repairs21
- Leaks and water damage13
- Roaches11
- Missing smoke or CO detector10
- Broken doors or locks5
- Electrical problems4
- Mice or rats4
- Plumbing, sinks and toilets3
- Missing window guards2
- Lead paint2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 54 closed · NYC typical: 87 days
from 97 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 4 inches out of…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247023
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 4 inches out of…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247024
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner at firt stack from south at east…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247022
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door at compactor closet, 3rd storyIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19196184
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19123536
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19123537
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at west wall and ceiling in the 1st room from northIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19079226
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the private hallwayIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19079225
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 square feet at ceiling, north, west, east and south walls in the bathroomIssued Jul 10, 2026 · fix by Aug 5, 2026 overdue · Violation #19052296
- BOther repairsAbate the nuisance consisting of pests. evidence of ants in the entire apartmentIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19058862
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 9, 2026 · fix by Aug 4, 2026 overdue · Violation #19058863
- BMoldTrace and repair the source and abate the visible mold condition more than 20 square feet at all walls and ceiling in the bathroomIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19058864
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft of mold at the ceiling in the 3rd room from eastIssued May 29, 2026 · fix by Jul 3, 2026 overdue · Violation #18969241
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at the ceiling in the private hallwayIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18923972
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and east wall in the bathroomIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18755810
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18747359
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and north and west wall in the 2nd room from northIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18704919
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and all walls in the bathroomIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18704912
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the 3rd room from north at eastIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18704915
- BMoldTrace and repair the source and abate the visible mold condition less than 1o sqft at ceiling in the 1st room from eastIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18663045
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at all walls and south closet wall in the 1st room from north at westIssued Feb 11, 2026 · fix by Mar 9, 2026 overdue · Violation #18633260
- COther repairs& 309 m/d law abate the nuisance consisting of scalding hotwater above 130f in the entire apartmentIssued Jan 29, 2026 · fix by Feb 4, 2026 overdue · Violation #18599330
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling, north, east, south and west walls in the bathroomIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18552716
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at the ceiling, south, west and north walls in the 2nd room from north…Issued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18552708
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18444598
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18444600
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 27, 2025 · fix by Nov 22, 2025 overdue · Violation #18320790
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18312702
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18312701
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at window recess at west wall in the 4th room from eastIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18312699
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18312700
- BBroken doors or locksProperly repair or replace the broken or defective refrigerator seal at upper and lower door in the kitchenIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18312693
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from eastIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18312696
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at window recess at west wall in the 4th room from eastIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18312698
- BElectrical problemsProperly secure the loose electric outlet at north wall in the 4th room from eastIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18312697
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the 1st room from eastIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18312703
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 2, 2025 · fix by Oct 28, 2025 overdue · Violation #18265359
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at southIssued Sep 10, 2025 · fix by Oct 15, 2025 overdue · Violation #18216423
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south and north walls in the private hallwayIssued Sep 10, 2025 · fix by Oct 15, 2025 overdue · Violation #18216425
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and west walls in the 2nd room from east at northIssued Sep 10, 2025 · fix by Oct 15, 2025 overdue · Violation #18222960
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and north walls in the 3rd room from east at northIssued Sep 10, 2025 · fix by Oct 15, 2025 overdue · Violation #18216422
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and east walls in the 3rd room from east at southIssued Sep 10, 2025 · fix by Oct 15, 2025 overdue · Violation #18216426
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash at east wall in the 5th room from eastIssued Sep 3, 2025 · fix by Oct 8, 2025 overdue · Violation #18197754
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 3, 2025 · fix by Sep 29, 2025 overdue · Violation #18197757
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 3rd room from north at eastIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18154821
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18154819
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18154820
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18154823
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 3rd room from north at westIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18154822
- BElectrical problemsProperly repair or replace the broken or defective electric outlet at west wall in the 1st room from northIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18086181
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglaze porcelain enamel paint at bathtub in the bathroomIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18086182
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18053851
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroomIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17837816
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator doors in the kitchenIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17837818
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17837820
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the 1st room from northIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17837819
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17837821
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at north wall in the 2nd room from eastIssued Jan 9, 2025 · fix by Feb 13, 2025 overdue · Violation #17612754
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color over the ceiling in the bathroomIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17440658
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2024 · fix by Dec 3, 2024 overdue · Violation #17399181
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.