Housing violations · East Harlem (South)
1569 Lexington Avenue, Manhattan
10029 · 33 apartments · 6 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs38
- Peeling paint and plaster20
- Broken doors or locks13
- Missing smoke or CO detector12
- Leaks and water damage10
- Plumbing, sinks and toilets5
- Mice or rats4
- Roaches3
- Mold3
- No heat or hot water2
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 28 closed · NYC typical: 87 days
from 22 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206999
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207002
- BOther repairsProperly repair or replace the broken or defective light switch at east wall in the 3rd room from eastIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207006
- BOther repairsProperly repair or replace the broken or defective light switch at north wall in the 4th room from eastIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207009
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207048
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood at west wall and south wall at base cabinet under sink in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207057
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 9, 2026 · fix by Oct 5, 2026 overdue · Violation #19207060
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 9, 2026 · fix by Oct 5, 2026 overdue · Violation #19207061
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207062
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207063
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at the bathtub in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207064
- BOther repairsProperly repair with similar material the broken or defective caulking at the water closet in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207065
- BLeaks and water damageRepair the leaky and/or defective faucets at the bathtub in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207066
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 9, 2026 · fix by Sep 23, 2026 overdue · Violation #19207072
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207074
- BOther repairsRemove all encumbrances consisting of table and chair at public hall, 5th storyIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19206838
- BBroken doors or locksProvide operable handle at exterior of east door of bulkhead to allow ingress from the roof to the bulkhead landingIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206850
- BBroken doors or locksProvide operable handle at exterior of west door of bulkhead to allow ingress from the roof to the bulkhead landingIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206851
- BLeaks and water damageRepair the roof so that it will not leak over the bulkhead ceilingIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19206852
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at the bulkhead ceilingIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206853
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206997
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq feet but less than 30 sq feet observed at ceiling, south wall and east wall…Issued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206998
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206965
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at the bathtub in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207076
- CRoachesAbate the infestation consisting of roaches at public hall, 1st storyIssued Sep 9, 2026 · fix by Oct 5, 2026 overdue · Violation #19206826
- BOther repairsProperly repair with similar material the broken or defective wood subfloor (sloping) in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206970
- BBroken doors or locksRefit entrance door in the 1st room from eastIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206971
- BBroken doors or locksRefit entrance door in the 2nd room from eastIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206972
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206993
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206995
- BOther repairsRemove all encumbrances consisting of washing machine and construction material at public hall, 6th storyIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19206839
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 6th storyIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19206857
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 6th storyIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206858
- COther repairsProperly repair with similar material the broken or defective fatigued metal treads (3rd, 4th and 6th from bottom) at fire exit stairs in center inner courtIssued Sep 9, 2026 · fix by Sep 15, 2026 overdue · Violation #19206892
- BOther repairsProperly repair with similar material the broken or defective wood subfloor (sloping) in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207046
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207036
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19207034
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of lockable eye at north bilco doors at building frontIssued Sep 9, 2026 · fix by Sep 15, 2026 overdue · Violation #19206938
- BOther repairsRemove all encumbrances consisting of household items at front at fire passage wayIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19206897
- BOther repairsProvide adequate lighting at north wall at front at fire passage wayIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206903
- BBroken doors or locksRefit entrance door in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206969
- BOther repairsRemove all encumbrances consisting of washing machine and chairs at rear at fire passage wayIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19206906
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door and latch set at basement entranceIssued Sep 9, 2026 · fix by Sep 23, 2026 overdue · Violation #19206918
- BBroken doors or locksProperly repair or replace the broken or defective latch set at basement entrance doorIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206920
- BOther repairsProperly repair or replace the broken or defective latch set at entrance at boiler roomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206929
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19162764
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19162763
- BBroken doors or locksProperly repair with similar material the broken or defective lower sink base cabinet door, and shelving in the kitchenetteIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19162762
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19162759
- BOther repairsRemove all encumbrances consisting of washing machine and garbage at public hall, 6th storyIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19162765
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 27, 2026 · fix by Sep 22, 2026 overdue · Violation #19162760
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet tank in the bathroomIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · rent impairing · Violation #19162757
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19124963
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the kitchenetteIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19126149
- BOther repairsFire escape defective. replace with new the broken, defective and/or missing missing guide stop for drop ladder,at 1st fire escape from north at west (building…Issued Aug 10, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19126145
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill at 4th story…Issued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19126141
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from northIssued Aug 10, 2026 · fix by Aug 16, 2026 overdue · Violation #19126123
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Aug 10, 2026 · fix by Aug 16, 2026 overdue · Violation #19126114
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction debris in the 3rd room from northIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19126127
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19125267
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.