Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (South)

1571 Lexington Avenue, Manhattan

10029 · 33 apartments · 6 stories · City Council district 8

By · Updated · Data from NYC HPD

C
10open immediately hazardous violations · 30 per 100 apartments
B54Hazardous, open
A16Non-hazardous, open
!73Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company1571 Lexington LLC
Landlord (head officer or owner)Mark Furman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    29
  2. Peeling paint and plaster
    19
  3. Mold
    8
  4. Broken doors or locks
    7
  5. Leaks and water damage
    6
  6. Roaches
    4
  7. Lead paint
    2
  8. Bedbugs
    2
  9. Missing smoke or CO detector
    2
  10. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C104 days
from 22 closed · NYC typical: 87 days
B139 days
from 4 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Other repairsProperly repair or replace the broken or defective marble tread, 1st from bottom at public hall stairs, 1st storyIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19195352
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at the vestibule ceiling at public hall, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19194676
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling in vestibule at public hall, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195271
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at the east wall at public hall, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195273
  • C
    Lead paintProperly repair or replace the broken or defective marble nosing at stairs leading to fire exit door at public hall, 1st storyIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19195316
  • B
    Other repairsRemove all encumbrances consisting of boxes under stairs at public hall, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19195323
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of bicycles chained at center inner court hindering egress to the rear fire passagewaysIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19195325
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at soffit under the stairs at public hall, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195339
  • B
    Other repairsRemove all encumbrances consisting of bicycle chained to railing at bulkhead landingIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19195354
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east wall at public hall, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19194705
  • B
    Leaks and water damageRepair the roof so that it will not leak over the bulkhead ceilingIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19195361
  • B
    Lead paintRemove all encumbrances consisting of machine component at intermediate landing leading to bulkhead at public hall stairs, 6th storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19195362
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor tiles in the 1st room from north at eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195376
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixturesIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19195382
  • B
    Broken doors or locksProperly secure the loose door knob in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195390
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor (sloping) in the foyerIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195395
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor (bulging) in the private hallwayIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195396
  • B
    Other repairsProperly repair with similar material the broken or defective sloping wood subfloor (sloping) in the 2nd room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195397
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor (sloping) in the 1st room from north at eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195399
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19195400
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195401
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195403
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195408
  • B
    Other repairsProperly repair with similar material the broken or defective caulking around water closet in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195410
  • C
    Other repairsProperly repair or replace the broken or defective spring balance at upper sash of fire escape window in the 1st room from north at eastIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19195379
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at bulkhead ceiling around skylightIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195355
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of padlock and eye at south bilco doors at building frontIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19195367
  • B
    Other repairsProvide adequate lighting at fire passage wayIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19194669
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of burrittos y mas resturant metal hand rail at entrance door blocking drop ladder from coming down, at the first…Issued Apr 30, 2026 · fix by May 6, 2026 overdue · Violation #18819198
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at vestibule door at public hall, 1st storyIssued Apr 1, 2026 · fix by May 6, 2026 overdue · Violation #18751277
  • B
    MoldTrace and repair the source and abate the visible mold condition lees then 10 sqft at south wall in the bathroomIssued Jan 28, 2026 · fix by Mar 4, 2026 overdue · Violation #18604735
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 30, 2025 · fix by Oct 26, 2025 overdue · Violation #18256702
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10sq ft at ceiling in the bathroomIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18183247
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx. 2sq. ft and south wall 3sq. ft in the bathroomIssued Sep 25, 2023 · fix by Oct 30, 2023 overdue · Violation #16254910
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 2 sq ft at north wall and 4 sq ft at ceiling in the kitchenIssued Sep 22, 2023 · fix by Oct 27, 2023 overdue · Violation #16248923
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 2 sq ft at ceiling and 2 sq ft at south wall in the bathroomIssued Sep 22, 2023 · fix by Oct 27, 2023 overdue · Violation #16248922
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 1 sq ft at north wall in the bathroomIssued Jun 20, 2023 · fix by Jul 25, 2023 overdue · Violation #16053456
  • C
    RoachesAbate the infestation consisting of roaches at public hall, 1st storyIssued Jun 5, 2023 · fix by Jul 1, 2023 overdue · Violation #16020572
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchenIssued May 26, 2023 · fix by Jun 30, 2023 overdue · Violation #15999735
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 26, 2023 · fix by Jun 30, 2023 overdue · Violation #15999734
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 2nd room from east at southIssued May 26, 2023 · fix by Jun 30, 2023 overdue · Violation #15999741
  • B
    Broken doors or locksRefit entrance door in the 3rd room from eastIssued May 26, 2023 · fix by Jun 30, 2023 overdue · Violation #15999743
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued May 26, 2023 · fix by Jun 30, 2023 overdue · Violation #15999738
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 26, 2023 · fix by Jun 30, 2023 overdue · Violation #15999737
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx. 5sq. ft and north wall approx. 5sq. ft in the kitchenIssued May 26, 2023 · fix by Jun 30, 2023 overdue · Violation #15999736
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wal in the kitchenIssued May 25, 2023 · fix by Jun 29, 2023 overdue · Violation #15996851
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchenIssued May 25, 2023 · fix by Jun 29, 2023 overdue · Violation #15996850
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south and west walls and ceiling in the bathroomIssued May 25, 2023 · fix by Jun 29, 2023 overdue · Violation #15996849
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 25, 2023 · fix by Jun 29, 2023 overdue · Violation #15996848
  • B
    Other repairsProperly repair or replace the broken or defective intercom system at building front entrance to in the entire apartmentIssued Apr 12, 2023 · fix by May 17, 2023 overdue · Violation #15914720
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 2, 2022 · fix by Oct 7, 2022 overdue · Violation #15337354
  • B
    MoldTrace and repair the source and abate the visible mold condition 5 sq ft west wall, 3 sq ft north wall, 3 sq ft south wall at bathtub in the bathroomIssued Sep 2, 2022 · fix by Oct 7, 2022 overdue · Violation #15337353
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet lever assemblies in the bathroomIssued Sep 2, 2022 · fix by Oct 7, 2022 overdue · rent impairing · Violation #15337355
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector broken in the 3rd room from eastIssued Sep 1, 2022 · fix by Oct 6, 2022 overdue · Violation #15337351
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). broken in the 3rd room from eastIssued Sep 1, 2022 · fix by Oct 6, 2022 overdue · Violation #15337352
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st storyIssued Jun 20, 2019 · fix by Jul 25, 2019 overdue · Violation #13128990
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings throughout in the entire apartmentIssued Feb 22, 2011 · fix by Mar 29, 2011 overdue · Violation #8814676
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the entire apartmentIssued Feb 22, 2011 · fix by Mar 29, 2011 overdue · Violation #8814679
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Jan 24, 2011 · fix by Feb 28, 2011 overdue · Violation #8776998
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the kitchenIssued Jan 24, 2011 · fix by Feb 28, 2011 overdue · Violation #8777014

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

112017
32018
72019
22020
12021
112022
312023
122025
502026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 293 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.