Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Flatbush

222 East 17 Street, Brooklyn

11226 · 77 apartments · 6 stories · City Council district 40

By · Updated · Data from NYC HPD

C
25open immediately hazardous violations · 32 per 100 apartments
B30Hazardous, open
A6Non-hazardous, open
!56Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyPROSPECT REALTY GROUP,LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    13
  2. Peeling paint and plaster
    13
  3. Broken doors or locks
    9
  4. Roaches
    7
  5. Mold
    6
  6. Mice or rats
    4
  7. Leaks and water damage
    3
  8. Plumbing, sinks and toilets
    2
  9. Lead paint
    2
  10. Electrical problems
    1
  11. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 94 closed · NYC typical: 87 days
B104 days
from 134 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the kitchenIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19366142
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at fire exit door at south section at south wall and north section at north wall…Issued Nov 10, 2026 · fix by Nov 24, 2026 · Violation #19366143
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door at bulkhead at fire stairs, 6th storyIssued Nov 10, 2026 · fix by Nov 24, 2026 · Violation #19366144
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet wood casing at window in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19302512
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19272434
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 3rd bathroom from north at eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19272435
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19214249
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and asembly to door at bulkhead at 1st public hall bulkhead from north, 6th storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214257
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jun 30, 2026 · fix by Jul 26, 2026 overdue · rent impairing · Violation #19035837
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of trash bins obstructing the egress path, at fire passage way at northIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19002071
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 16, 2026 · fix by Jun 30, 2026 overdue · Violation #19002076
  • B
    Other repairsProvide an adequate supply of gas to the fixtures range, in the kitchenIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · rent impairing · Violation #19002072
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at fire passage way at northIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19002078
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from from vestibule to north wall panel, in the foyerIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19002075
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 2nd bathroom from north at centerIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978758
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 4, 2026 · fix by Jun 30, 2026 overdue · Violation #18978762
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jun 4, 2026 · fix by Jun 30, 2026 overdue · rent impairing · Violation #18978774
  • B
    Other repairsProperly repair with similar material the broken or defective cracked ceramic floor tiles in the 2nd bathroom from north at westIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978759
  • B
    Other repairsProperly repair with similar material the broken or defective cracked ceramic tiles at floor in walk in shower stall in the 2nd bathroom from north at westIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978761
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retardant materials, plaster at ceiling at corridor ,northeast section, building front yard…Issued Jan 8, 2026 · fix by Feb 12, 2026 overdue · Violation #18555576
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 3rd room from east at southIssued Jan 8, 2026 · fix by Feb 12, 2026 overdue · Violation #18555569
  • B
    Other repairsProperly repair with similar material the broken or defective cracked and missing ceramic floor tiles in the bathroomIssued Jan 8, 2026 · fix by Feb 12, 2026 overdue · Violation #18555558
  • B
    Broken doors or locksReplace with new the missing marble saddle in the entrance door at east wall in the bathroomIssued Jan 8, 2026 · fix by Feb 12, 2026 overdue · Violation #18555559
  • B
    Plumbing, sinks and toiletsReplace the broken or defective cracked wash basin at north wall in the bathroomIssued Jan 8, 2026 · fix by Feb 12, 2026 overdue · rent impairing · Violation #18555560
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door saddle at east wall in the kitchenIssued Jan 8, 2026 · fix by Feb 12, 2026 overdue · Violation #18555567
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 21, 2025 · fix by Dec 5, 2025 overdue · Violation #18424646
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 1o sq ft at east wall in the 1st room from eastIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18351441
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 3, 2025 · fix by Sep 29, 2025 overdue · Violation #18198121
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at window recess and ceiling in the 1st room from east at northIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17940155
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17940156
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Jan 30, 2025 · fix by Feb 23, 2025 overdue · Violation #17662145
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq/ft at the ceiling in the 1st bathroom from northIssued Jan 29, 2025 · fix by Mar 5, 2025 overdue · Violation #17662059
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq/ft at the south closet wall and east and north wall in the 2nd room from…Issued Jan 23, 2025 · fix by Feb 18, 2025 overdue · Violation #17638863
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 7 sq feet at east wall, approzimately 7 sq feet at north wall, approximately 5…Issued Apr 5, 2024 · fix by May 10, 2024 overdue · Violation #16783991
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 2nd room from north at eastIssued Mar 12, 2024 · fix by Apr 16, 2024 overdue · Violation #16728817
  • B
    Broken doors or locksProperly repair or replace the broken or defective locking device at entrance door in the entranceIssued Mar 12, 2024 · fix by Apr 16, 2024 overdue · Violation #16728819
  • B
    Broken doors or locksProperly repair or replace the broken or defective cracked spliced wood ddoor saddle at east wall in the 2nd room from north at westIssued Mar 12, 2024 · fix by Apr 16, 2024 overdue · Violation #16728824
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Mar 12, 2024 · fix by Apr 16, 2024 overdue · Violation #16728820
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from north at eastIssued Feb 12, 2024 · fix by Mar 18, 2024 overdue · Violation #16665233
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Feb 12, 2024 · fix by Mar 18, 2024 overdue · Violation #16665234
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Nov 27, 2023 · fix by Jan 1, 2024 overdue · Violation #16437027
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape in the 4th room from north at westIssued Oct 30, 2023 · fix by Nov 5, 2023 overdue · Violation #16343171
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2023 · fix by Nov 8, 2023 overdue · Violation #16298274
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 2nd bathroom from north at westIssued Aug 7, 2023 · fix by Aug 13, 2023 overdue · Violation #16143313
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north at westIssued Aug 7, 2023 · fix by Aug 13, 2023 overdue · Violation #16143314
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2022 · fix by Oct 17, 2022 overdue · Violation #15375942
  • C
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Mar 18, 2022 · fix by Mar 24, 2022 overdue · rent impairing · Violation #15038979
  • C
    No heat or hot waterProvide adequate supply of hot water for the fixtures at sink in the kitchenIssued Mar 18, 2022 · fix by Mar 24, 2022 overdue · rent impairing · Violation #15038985
  • C
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at sink in the kitchenIssued Mar 18, 2022 · fix by Mar 24, 2022 overdue · rent impairing · Violation #15038986
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 18, 2022 · fix by Apr 13, 2022 overdue · Violation #15038989
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Mar 18, 2022 · fix by Mar 24, 2022 overdue · Violation #15038982
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 18, 2022 · fix by Apr 13, 2022 overdue · Violation #15038990
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the entire apartmentIssued Mar 18, 2022 · fix by Mar 24, 2022 overdue · Violation #15038977
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 9, 2021 · fix by May 5, 2021 overdue · Violation #14187710
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 3rd room from north at eastIssued Apr 9, 2021 · fix by May 14, 2021 overdue · Violation #14187714

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

52017
162018
422019
282020
242021
372022
672023
1012024
972025
722026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 618 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.