Housing violations · Flatbush
49 East 19 Street, Brooklyn
11226 · 54 apartments · 6 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster27
- Mold18
- Roaches17
- Other repairs15
- Broken doors or locks11
- Missing smoke or CO detector10
- Leaks and water damage9
- Mice or rats9
- Lead paint8
- Plumbing, sinks and toilets4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 89 closed · NYC typical: 87 days
from 98 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354207
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354206
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354209
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354208
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 6th room from east at northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354204
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the 6th room from east at northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354203
- BBroken doors or locksProperly repair or replace the broken or defective latch set at door entrance to buildingIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19315529
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19282576
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19282580
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19282588
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 1st storyIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19282589
- BLead paintProperly repair or replace the broken or defective electronic intercom system at building front leading to north wall in the foyerIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19282592
- BBroken doors or locksProperly repair or replace the broken or defective latch set at entrance door at compactor closet, 2nd storyIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19282591
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19282582
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st private hallway from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19253357
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19232560
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19232561
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft observed at ceiling , east wall, west wall and south wall in the…Issued Sep 22, 2026 · fix by Oct 18, 2026 overdue · Violation #19240479
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19240482
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19240481
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19240480
- CRoachesAbate the infestation consisting of roaches at public hall, 4th storyIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19201452
- BBroken doors or locksProperly repair or replace the broken or defective latch set at door at compactor closet, 4th storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19201451
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at cieling and all walls in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19183008
- CRoachesAbate the infestation consisting of roachesIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19183018
- CMoldTrace and repair the source and abate the visible mold condition more than 10sq feet observed at all walls and cielings in the bathroomIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19183007
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at cieling in the 1st room from eastIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19183013
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at cieling and all walls in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19183009
- BOther repairsProperly repair with similar material the broken or defective floor tile in the bathroomIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19183010
- BOther repairsProperly repair or replace the broken or defective counterbalance at upper window sash at 1st window in the 1st room from eastIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19183014
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at cieling in the 1st room from eastIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19183012
- BOther repairsProperly repair or replace the broken or defective counterbalance at upper window sash at 1st window in the 2nd room from eastIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19183015
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19180712
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective at the wash basin in the 1st bathroom from eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180703
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180716
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st bathroom from eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180702
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the east wall in the kitchenIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180710
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180718
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19102027
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19102025
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19102026
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19102024
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 22, 2026 · fix by Aug 15, 2026 overdue · Violation #19096571
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 22, 2026 · fix by Aug 17, 2026 overdue · Violation #19085643
- BBroken doors or locksRefit the 1st door from east at south in the kitchenIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19085640
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east at southIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19085639
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 22, 2026 · fix by Aug 15, 2026 overdue · Violation #19096573
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 22, 2026 · fix by Aug 15, 2026 overdue · Violation #19096574
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling ceiling in the 5th room from east at northIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19085637
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 22, 2026 · fix by Aug 15, 2026 overdue · Violation #19096576
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from eastIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19085644
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 22, 2026 · fix by Aug 15, 2026 overdue · Violation #19096575
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 22, 2026 · fix by Aug 15, 2026 overdue · Violation #19096577
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19072735
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq/ft at all walls and celing in the bathroomIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18963936
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18963938
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18963939
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 1, 2025 · fix by Dec 27, 2025 overdue · Violation #18444056
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at all walls and ceiling in the bathroomIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18077223
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at south wall in the kitchenIssued Jun 27, 2025 · fix by Jul 23, 2025 overdue · Violation #18054103
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.