Housing violations · Flatbush
50 East 19 Street, Brooklyn
11226 · 54 apartments · 6 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster47
- Broken doors or locks33
- Roaches31
- Mice or rats30
- Other repairs27
- Leaks and water damage20
- Lead paint14
- Mold6
- Electrical problems2
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 86 closed · NYC typical: 87 days
from 123 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st storyIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19332495
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the private hallwayIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19271980
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19271981
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at ceiling in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19271978
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19271975
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch to vestibule door at public hall, 1st storyIssued Sep 1, 2026 · fix by Sep 15, 2026 overdue · Violation #19180732
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19180726
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and north wall in the 1st bathroom from northIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180730
- BBroken doors or locksProperly repair or replace the broken or defective latch set and assembly to door at vestibule at public hall, 1st storyIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180735
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19180727
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st bathroom from northIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180731
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171905
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at (1st, 2nd) window from south at west wall (count left to right) in…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171906
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at (1st, 2nd) window from north at east wall in the 4th room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171902
- BOther repairsReplace with new the missing light switch cover plates at west wall in the private hallwayIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171904
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Aug 31, 2026 · fix by Sep 14, 2026 overdue · Violation #19171901
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19171903
- BOther repairsProperly secure the loose wood treads at stair to split level east wall in the 2nd private hallway from northIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19120134
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 2nd bathroom from north at westIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19120092
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling aand north wall in the 2nd bathroom from north at westIssued Aug 7, 2026 · fix by Aug 13, 2026 overdue · Violation #19120132
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19120121
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st private hallway from northIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19120133
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19120122
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 7, 2026 · fix by Sep 2, 2026 overdue · rent impairing · Violation #19120136
- BBroken doors or locksProperly repair or replace the broken or defective metal door frame in the entrance at south wall in the kitchenIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19120126
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north at westIssued Aug 7, 2026 · fix by Aug 13, 2026 overdue · Violation #19120095
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at, compactor closet door , south wall, north section at public hall, 2nd storyIssued Aug 7, 2026 · fix by Aug 21, 2026 overdue · Violation #19120135
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 7, 2026 · fix by Aug 31, 2026 overdue · Violation #19131796
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 7, 2026 · fix by Aug 31, 2026 overdue · Violation #19131798
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 7, 2026 · fix by Aug 31, 2026 overdue · Violation #19131800
- BOther repairsProperly repair with similar material the broken or defective cracked ceramic tiles at west wall in the 2nd bathroom from north at westIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19120129
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall at closet in the 1st room from eastIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19022928
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 25, 2026 · fix by Jul 21, 2026 overdue · Violation #19022926
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 25, 2026 · fix by Jul 21, 2026 overdue · Violation #19022927
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 1st room from east at northIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18850684
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st bathroom from eastIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18850683
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd room from north at eastIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18850678
- BElectrical problemsReplace with new the missing missing cover plate for electrical outlets at all walls in the kitchenIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18850679
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd bathroom from eastIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18850681
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 6, 2026 · fix by Jun 1, 2026 overdue · Violation #18850675
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wiring at ceiling in the kitchenIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18850680
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18850677
- BBroken doors or locksProperly repair or replace the broken or defective robert gasket at upper refrigerator door in the kitchenIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18795713
- CLeaks and water damageProperly repair or replace the broken or defective leaking radiator shutoff valve in the 2nd room from northIssued Apr 10, 2026 · fix by Apr 16, 2026 overdue · Violation #18773732
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 10, 2026 · fix by May 15, 2026 overdue · Violation #18773727
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at east and south wall in the bathroomIssued Apr 10, 2026 · fix by May 15, 2026 overdue · Violation #18773731
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 10, 2026 · fix by May 15, 2026 overdue · Violation #18773728
- BOther repairsReplace with new the missing escutcheon plate at top of heat riser in the bathroomIssued Mar 25, 2026 · fix by Apr 29, 2026 overdue · Violation #18739435
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 25, 2026 · fix by Apr 29, 2026 overdue · Violation #18739432
- BOther repairsProperly repair or replace the broken or defective counter balance at upper window sash in the bathroomIssued Mar 25, 2026 · fix by Apr 29, 2026 overdue · Violation #18739436
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from north at eastIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18698162
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at eastIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18634627
- BOther repairsReplace with new the missing guardrail above masonry wall to ramp below grade at west yardIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18634643
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18634632
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color cracked, buldged plaster at ceiling in the kitchenIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18634629
- CBroken doors or locksRemove the illegal double cylinder key operated locking device at door at entrance at west wall in the 3rd room from north at eastIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18634628
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 11, 2026 · fix by Mar 9, 2026 overdue · Violation #18634623
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 11, 2026 · fix by Mar 9, 2026 overdue · Violation #18634622
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall and ceiling in the 3rd room from northIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18558354
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 12, 2026 · fix by Feb 7, 2026 overdue · Violation #18558357
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.