Housing violations · Flatbush
18 East 21 Street, Brooklyn
11226 · 60 apartments · 6 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster22
- Other repairs12
- Leaks and water damage10
- Mold8
- Broken doors or locks6
- Lead paint6
- Roaches4
- Plumbing, sinks and toilets4
- No heat or hot water3
- Mice or rats3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 124 closed · NYC typical: 87 days
from 276 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19370793
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall at closet in the private hallwayIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19370782
- BOther repairsRemove all encumbrances consisting of barbeque grill at public hall, 1st story, section ''north''Issued Nov 12, 2026 · fix by Dec 17, 2026 · rent impairing · Violation #19370804
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding allowable temp of 130 degrees in the kitchenIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19370790
- BOther repairsProperly repair with similar material the broken or defective fire retardant ceiling and north wall at vestibule at public hall, 1st storyIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19370805
- BOther repairsRemove all encumbrances consisting of bicycle at public hall, 5th story, section ''north''Issued Nov 5, 2026 · fix by Dec 10, 2026 · rent impairing · Violation #19349192
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling inside east closet in the foyerIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19349185
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the foyerIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19349186
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19349187
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19349191
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartmentIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19349181
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and east wall inside east closet in the foyerIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19349183
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the foyerIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19349184
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water above 130 degrees at all hot water fixtures in the entire apartmentIssued Oct 16, 2026 · fix by Oct 22, 2026 overdue · Violation #19294080
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19232170
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19232171
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the yard at westIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190998
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at the ceiling in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19152804
- CMice or ratsAbate the infestation consisting of mice in the entranceIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19115505
- BBroken doors or locksRefit door in the entranceIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19115510
- CBroken doors or locksProvide approved one-hour fire resistance rated self-closing door at all openings to public hall, other than apartment main entrance door missing doors and…Issued Jul 1, 2026 · fix by Jul 15, 2026 overdue · Violation #19043805
- BPlumbing, sinks and toiletsReplace with new the missing drain plug for wasteline in the bathroomIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819700
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in in wasteline underneath sink in the kitchenIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · rent impairing · Violation #18819702
- BBroken doors or locksReplace with new the missing strike plate at door frame in the entranceIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819705
- BBroken doors or locksProperly repair or replace the broken or defective latch set at door in the entranceIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819704
- BOther repairsProperly secure the loose escutcheon plate at ceiling at riser pipe at north wall in the 1st room from eastIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819701
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroomIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819699
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroomIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819698
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the kitchenIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819696
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st room from eastIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819694
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819697
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the kitchenIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18819695
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued Aug 28, 2025 · fix by Oct 2, 2025 overdue · Violation #18194625
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 7, 2025 · fix by Aug 2, 2025 overdue · Violation #18068339
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 27, 2025 · fix by Jul 11, 2025 overdue · Violation #18038674
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 18, 2024 · fix by Dec 23, 2024 overdue · Violation #17415313
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from east at southIssued Nov 18, 2024 · fix by Dec 23, 2024 overdue · Violation #17415311
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from east at northIssued Nov 18, 2024 · fix by Dec 23, 2024 overdue · Violation #17415309
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from east at northIssued Nov 18, 2024 · fix by Dec 23, 2024 overdue · Violation #17415308
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east at southIssued Nov 18, 2024 · fix by Dec 23, 2024 overdue · Violation #17415310
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east and north walls in the 1st room from east at northIssued Jul 22, 2024 · fix by Aug 26, 2024 overdue · Violation #17130325
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at southIssued Jul 22, 2024 · fix by Aug 26, 2024 overdue · Violation #17130326
- BMoldTrace and repair the source and abate the visible mold condition approximately 4 sq ft at ceiling in the kitchenIssued Jan 19, 2024 · fix by Feb 23, 2024 overdue · Violation #16610637
- BOther repairsProperly repair with similar material the broken or defective wood floor near radiator in the 2nd room from north at eastIssued Sep 21, 2023 · fix by Oct 26, 2023 overdue · Violation #16228236
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Sep 21, 2023 · fix by Oct 26, 2023 overdue · Violation #16228239
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Sep 21, 2023 · fix by Oct 26, 2023 overdue · Violation #16228241
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 21, 2023 · fix by Oct 26, 2023 overdue · Violation #16228240
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at westIssued Sep 21, 2023 · fix by Oct 26, 2023 overdue · Violation #16228235
- BOther repairsProperly repair with similar material the broken or defective slopping wood floor in the private hallwayIssued Sep 21, 2023 · fix by Oct 26, 2023 overdue · Violation #16228237
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Sep 21, 2023 · fix by Oct 26, 2023 overdue · Violation #16228238
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 14, 2023 · fix by May 10, 2023 overdue · Violation #15921634
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 14, 2023 · fix by May 10, 2023 overdue · Violation #15921635
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 3, 2019 · fix by Jul 1, 2019 overdue · Violation #13100784
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 3, 2019 · fix by Jul 1, 2019 overdue · Violation #13100785
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 3, 2019 · fix by Jul 1, 2019 overdue · Violation #13100786
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 3, 2019 · fix by Jul 1, 2019 overdue · Violation #13100787
- BOther repairsProperly repair with similar material the broken or defective wood floor at radiator in the 1st room from north at eastIssued Mar 18, 2016 · fix by Apr 22, 2016 overdue · Violation #11158832
- BOther repairsProperly repair with similar material the broken or defective wood floor at radiator in the 1st room from north at westIssued Mar 18, 2016 · fix by Apr 22, 2016 overdue · Violation #11158833
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 25, 2008 · fix by Mar 22, 2008 overdue · Violation #7160008
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 12, 2005 · fix by Feb 7, 2005 overdue · Violation #5290179
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.