Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Flatbush

21 East 21 Street, Brooklyn

11226 · 42 apartments · 6 stories · City Council district 40

By · Updated · Data from NYC HPD

C
33open immediately hazardous violations · 79 per 100 apartments
B57Hazardous, open
A19Non-hazardous, open
!71Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company21 EAST 21 STREET PARTNERS LLC
Landlord (head officer or owner)Jonathan Samet

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Mold
    21
  2. Other repairs
    18
  3. Mice or rats
    15
  4. Peeling paint and plaster
    14
  5. Roaches
    12
  6. Leaks and water damage
    10
  7. Broken doors or locks
    9
  8. Plumbing, sinks and toilets
    5
  9. Missing smoke or CO detector
    4
  10. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C96 days
from 86 closed · NYC typical: 87 days
B112 days
from 154 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at west wall and ceiling in the 3rd room from east at southIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19377430
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19365690
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall, inside the closet in the private hallwayIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365691
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365688
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19365689
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19356941
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19342745
  • B
    Other repairsProperly repair or replace the broken or defective spring balance lower sash 1st window from north at east wall in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19356921
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulk around the bathtub in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19342742
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east window frame in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19356937
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 5, 2026 · fix by Nov 19, 2026 · Violation #19356928
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19356940
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19356924
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at window recess at east wall and ceiling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342751
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342746
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at room entrance door in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342748
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulk around the bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342753
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342752
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at window recess at east wall and ceiling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342750
  • B
    Broken doors or locksReplace with new the missing door knob at closet door at east wall in the 4th room from eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342759
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342758
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342757
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19342756
  • B
    Other repairsReplace with new the missing grout inbetween tiles at north, south and east walls in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342754
  • B
    Other repairsProperly repair the broken or defective paving cracked and missing bricks with deteriorated mortar at joints to floor at front porch, building front yardIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311749
  • B
    Broken doors or locksProperly repair or replace the broken or defective cracked glass block at transom , above entrance door to building , at west wall at public hall, 1st storyIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311748
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket at lower and upper refrigerator doors in the kitchenIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19252889
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19252887
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19252888
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at window recess in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19252885
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19252890
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at window recess and ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19252886
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling and north wall in the bathroomIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19261280
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling, south and east walls in the bathroomIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19261278
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at south and east walls in the 1st room from east at southIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19261279
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209678
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209682
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19209681
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209679
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19209680
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at the east wall in the 1st room from eastIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209677
  • B
    Other repairsProperly repair with similar material the broken or defective marble stool at south wall at public hall, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19201456
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19189939
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19189940
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19201453
  • B
    Other repairsProperly repair with similar material the broken or defective marble stool at west wall at public hall, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19201458
  • B
    Other repairsProperly repair with similar material the broken or defective ceiling fire retardant material at lobby, 1st storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19185910
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19109991
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19109989
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19109994
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19109993
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19109990
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19081492
  • B
    Broken doors or locksProperly repair or replace the broken or defective locking assembly at door in the entranceIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19081517
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft in closet at north wall in the 5th room from eastIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19049306
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft north wall in the private hallwayIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19049305
  • B
    MoldTrace and repair the source and abate the visible mold condition at, less than 10 sqft, north and west walls in the 2nd private hallway from eastIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19025540
  • B
    MoldTrace and repair the source and abate the visible mold condition at less than 10 sqft at ceiling in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19025539
  • B
    MoldTrace and repair the source and abate the visible mold condition at, less than 10 sqft , east wall, in the 5th room from eastIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19025541
  • C
    Other repairsProperly repair with similar material the broken or defective cracked and missing ceramic floor tiles in the 3rd bathroom from north at westIssued Jun 4, 2026 · fix by Jun 10, 2026 overdue · Violation #18977989

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

2182017
3702018
442019
532020
1652021
1632022
832023
552024
792025
2062026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,610 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.