Housing violations · Flatbush
312 East 21 Street, Brooklyn
11226 · 54 apartments · 6 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs12
- Peeling paint and plaster12
- Roaches12
- Mice or rats8
- Broken doors or locks6
- Leaks and water damage5
- Missing smoke or CO detector4
- Mold4
- Plumbing, sinks and toilets4
- Lead paint2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 34 closed · NYC typical: 84 days
from 85 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at window recess at 1st window from north at east at public hall, 1st…Issued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232016
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at window recess at 1st window from north at east at public hall, 1st storyIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232015
- BOther repairsProperly repair with similar material the broken or defective terrazzo stool at 2nd window from north at east at public hall, 1st storyIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232014
- COther repairsProperly repair or replace the broken or defective glass creating cut hazard at intercom system at building frontIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19232013
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19184510
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190773
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190772
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19184511
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190774
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19165781
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd bathroom from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19165782
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130139
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130141
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130142
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130140
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 25, 2026 · fix by Jul 1, 2026 overdue · Violation #19009354
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and at south wall in the 4th room from northIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994630
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18994631
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994628
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18994627
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18994626
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 13, 2025 · fix by Dec 9, 2025 overdue · Violation #18357209
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 13, 2025 · fix by Dec 9, 2025 overdue · Violation #18357210
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective frame in the entranceIssued Jul 7, 2025 · fix by Jul 21, 2025 overdue · Violation #18057982
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 7, 2025 · fix by Aug 2, 2025 overdue · Violation #18057985
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 7, 2025 · fix by Aug 2, 2025 overdue · Violation #18057984
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 27, 2025 · fix by Jun 22, 2025 overdue · Violation #17914301
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 27, 2025 · fix by Jun 22, 2025 overdue · Violation #17914302
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective mechanical stopper at bathtub in the bathroomIssued Apr 24, 2025 · fix by May 29, 2025 overdue · Violation #17849338
- BOther repairsProperly repair or replace the broken or defective intercome system from building entrance to foyer south wallIssued Apr 24, 2025 · fix by May 29, 2025 overdue · Violation #17849196
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 7, 2025 · fix by Mar 5, 2025 overdue · Violation #17678202
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 7, 2025 · fix by Mar 5, 2025 overdue · Violation #17678203
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock-set at apartment door in the entranceIssued Feb 7, 2025 · fix by Mar 14, 2025 overdue · Violation #17678201
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Jan 27, 2025 · fix by Mar 3, 2025 overdue · Violation #17637708
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west & east wall in the bathroomIssued Jan 27, 2025 · fix by Mar 3, 2025 overdue · Violation #17637707
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 29, 2024 · fix by Dec 25, 2024 overdue · Violation #17442418
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17425577
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 1, 2024 · fix by Nov 27, 2024 overdue · Violation #17387934
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 1, 2024 · fix by Nov 27, 2024 overdue · Violation #17387935
- COther repairsProvide an adequate supply of gas to the fixtures gas range in the kitchenIssued Oct 31, 2024 · fix by Nov 6, 2024 overdue · rent impairing · Violation #17386626
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 24, 2024 · fix by Jun 19, 2024 overdue · Violation #16991711
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 24, 2024 · fix by Jun 19, 2024 overdue · Violation #16991710
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 5, 2024 · fix by Mar 31, 2024 overdue · Violation #16712943
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 5, 2024 · fix by Mar 31, 2024 overdue · Violation #16712938
- BPlumbing, sinks and toiletsRepair the broken or defective connection waste pipe under washbasin in the bathroomIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15394448
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Oct 3, 2022 · fix by Oct 17, 2022 overdue · Violation #15394451
- BOther repairsProperly repair with similar material the broken or defective mortar at grouts joints of ceramic tiles at west wall around floor tiles in the bathroomIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15394456
- BPlumbing, sinks and toiletsReplace with new the broken or defective cauking at east wall around bathtub in the bathroomIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15394454
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15394453
- BOther repairsProperly repair with similar material the broken or defective mortar at grouts joints of ceramic tiles at west and north walls in the bathroomIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15394455
- BPlumbing, sinks and toiletsProperly repair the broken or defective wood coubter top at sink cabinet in the kitchenetteIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15394458
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west and north walls in closet 1st from west at north in the foyerIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15394450
- BMoldProperly repair the broken or defective wood baseboard molding at west and north walls in closet 1st fromwest at north in the foyerIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15394449
- BOther repairsProperly repair the broken or defective marble window sill at east wall at public hall, 1st storyIssued Jan 12, 2022 · fix by Feb 16, 2022 overdue · Violation #14769751
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 2, 2021 · fix by Mar 28, 2021 overdue · Violation #14043294
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 2, 2020 · fix by Jul 28, 2020 overdue · Violation #13711094
- BMoldTrace and repair the source and abate the nuisance consisting of mold at south wall and east wall (approx. 10 sq.ft) in the bathroomIssued Nov 19, 2018 · fix by Dec 24, 2018 overdue · Violation #12761129
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling around the riser pipe in the bathroomIssued Oct 1, 2018 · fix by Nov 5, 2018 overdue · Violation #12610800
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 1, 2018 · fix by Nov 5, 2018 overdue · Violation #12610793
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartmentIssued Jun 11, 2013 · fix by Jul 16, 2013 overdue · Violation #9864753
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.