Housing violations · Flatbush
480 East 21 Street, Brooklyn
11226 · 47 apartments · 6 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster18
- Broken doors or locks17
- Other repairs16
- Roaches14
- Mice or rats9
- Mold9
- Missing smoke or CO detector6
- Plumbing, sinks and toilets5
- Leaks and water damage4
- Lead paint2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 125 closed · NYC typical: 84 days
from 176 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomNotice not sent yet · Violation #19374712
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at westwall in the kitchenNotice not sent yet · Violation #19374715
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomNotice not sent yet · Violation #19374713
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentNotice not sent yet · Violation #19374716
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at washbasin in the bathroomNotice not sent yet · rent impairing · Violation #19374714
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19353562
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color in closet at north wall in the foyerIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353563
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353561
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283920
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283921
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st room from eastIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19232307
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19232305
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch to door at public hall, 1st storyIssued Sep 21, 2026 · fix by Oct 5, 2026 overdue · Violation #19232309
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19232306
- BMoldTrace and repair the source and abate the visible mold condition mold more then 10sq feet but less than 30 sq.feet observe at ceiling and north wall in the…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19232303
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19232304
- BOther repairsRemove the torn and/or loose floor covering in the 1st room from eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19232308
- BBroken doors or locksProperly repair or replace the broken or defective latch set and assembly to door at building entrance at public hall, 1st storyIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19232310
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft observed at ceiling, east north and west walls in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19190659
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19190653
- COther repairsRemove all obstructions from water closet in the bathroomIssued Sep 9, 2026 · fix by Sep 15, 2026 overdue · rent impairing · Violation #19190654
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling east, north and west walls in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19190658
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190652
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190657
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190656
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190655
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19192647
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood floor inside cabinet at sink in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190650
- BOther repairsProperly repair or replace the broken or defective return bell and buzzer system from building front to east wall in the foyerIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192644
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 8, 2026 · fix by Oct 4, 2026 overdue · rent impairing · Violation #19192650
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall and ceiling in the 1st room from eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190651
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19192646
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190661
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190660
- BBroken doors or locksProperly repair with similar material the broken or defective wood door saddle in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192649
- BLeaks and water damageRepair the leaky and/or defective water supply pipe at sink in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19192648
- BPlumbing, sinks and toiletsProperly secure the loose base wash basin at west wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192643
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Aug 19, 2026 · fix by Aug 23, 2026 overdue · Violation #19152749
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Aug 19, 2026 · fix by Aug 23, 2026 overdue · Violation #19152750
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19127764
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19127774
- BBroken doors or locksProperly repair or replace the broken or defective cracked marble saddle at door in the entrance in the bathroomIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19127769
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19127766
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft and less than 30 sqft at ceiling, west and north wall in the bathroomIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19127770
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 11, 2026 · fix by Sep 6, 2026 overdue · Violation #19127763
- BBroken doors or locksProperly repair with similar material the broken or defective door saddle in the entrance at north wall in the kitchenIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19127765
- BOther repairsProperly repair with similar material the broken or defective rotten wood floor in the kitchenIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078599
- BPlumbing, sinks and toiletsProperly secure the loose sink 's coutertop at east wall in the kitchenIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078600
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078607
- BOther repairsProperly repair with similar material the broken or defective rotten wood floor in the 1st room from east at southIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078609
- BBroken doors or locksProperly repair or replace the broken or defective wood door saddle , in the entrance at north wall in the 2nd room from east at northIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078603
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078601
- BBroken doors or locksReplace with new the missing wood door saddle , in the entrance , at west wall, in the 1st room from east at southIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078610
- CBroken doors or locksProvide approved one-hour fire resistance rated self-closing door at all openings to public hall, other than apartment main entrance door missing iron…Issued Jul 20, 2026 · fix by Aug 3, 2026 overdue · Violation #19078611
- BOther repairsProperly repair with similar material the broken or defective cracked ceramic floor tiles in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078605
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078606
- BMoldProperly repair or replace the broken or defective regrout the molded joints at ceramic tiles, at south, east and west walls, above bathtub in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078604
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19078608
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19029561
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Apr 13, 2026 · fix by Apr 27, 2026 overdue · Violation #18774084
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.