Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Flatbush

370 East 23 Street, Brooklyn

11226 · 20 apartments · 4 stories · City Council district 45

By · Updated · Data from NYC HPD

C
46open immediately hazardous violations · 230 per 100 apartments
B72Hazardous, open
A25Non-hazardous, open
!135Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyFc 370 LLC
Landlord (head officer or owner)Asher Klein

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    35
  2. Other repairs
    25
  3. Roaches
    15
  4. Broken doors or locks
    13
  5. Mice or rats
    12
  6. Leaks and water damage
    10
  7. Plumbing, sinks and toilets
    8
  8. Missing smoke or CO detector
    8
  9. Lead paint
    8
  10. Mold
    5
  11. No heat or hot water
    3
  12. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C85 days
from 74 closed · NYC typical: 87 days
B121 days
from 98 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective door in the entranceIssued Oct 5, 2026 · fix by Oct 19, 2026 overdue · Violation #19263534
  • B
    Other repairsRemove all encumbrances consisting of stroller at public hall, 1st storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19263535
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at westIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19263525
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19263526
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19263529
  • B
    Other repairsProperly repair or replace the broken or defective gasket at refrigerator in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19263521
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19263522
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19263527
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19263528
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19263531
  • B
    Other repairsProperly repair or replace the broken or defective intercom system at building entrance to intercom system at east wall in the foyerIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219024
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219023
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the private hallwayIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219021
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219018
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19219027
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the private hallwayIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219030
  • B
    Plumbing, sinks and toiletsProperly secure the loose sink at basecabinet at west wall in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219028
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219026
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219025
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling ceiling in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219022
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at 1st closet from east at south wall ceiling in the private hallwayIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219020
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 square feet but less than 30 square feet observed at north and south and east…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19172185
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19108934
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19108942
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19108933
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19108940
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from north at eastIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19108941
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19108935
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19108936
  • B
    Other repairsProperly repair or replace the broken or defective upper cabinet at north wall in the kitchenIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19108939
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 6, 2026 · fix by Sep 1, 2026 overdue · Violation #19110469
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile on floor in the bathroomIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19110470
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 6, 2026 · fix by Sep 1, 2026 overdue · Violation #19110468
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 5, 2026 · fix by Aug 29, 2026 overdue · Violation #19123651
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 5, 2026 · fix by Aug 31, 2026 overdue · Violation #19110954
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 5, 2026 · fix by Aug 31, 2026 overdue · Violation #19110957
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, north wall in the 3rd room from eastIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110941
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchenIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110946
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, west wall in the foyerIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110948
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door at entrance in the bathroomIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110953
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110955
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110956
  • B
    Other repairsProperly repair or replace the broken or defective upper wall cabinet at west wall in the kitchenIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110958
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood floor at base cabinet at sink in the kitchenIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110959
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective silicone caulking at bathtub in the bathroomIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110960
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall in the 3rd room from eastIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19123155
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from east at south wall wall in the 4th room from east at northIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19123160
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the in the kitchenIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19123163
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall in the 3rd room from eastIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19123164
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 5, 2026 · fix by Aug 29, 2026 overdue · Violation #19123650
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 5, 2026 · fix by Aug 29, 2026 overdue · Violation #19123649
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 5, 2026 · fix by Aug 29, 2026 overdue · Violation #19123648
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 5, 2026 · fix by Aug 29, 2026 overdue · Violation #19123647
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 5, 2026 · fix by Aug 29, 2026 overdue · Violation #19123646
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 5, 2026 · fix by Aug 29, 2026 overdue · Violation #19123645
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 13, 2026 · fix by Jul 12, 2026 overdue · rent impairing · Violation #19072757
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19072743
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19072742
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 13, 2026 · fix by Jul 12, 2026 overdue · rent impairing · Violation #19072745
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square ft at ceiling in the bathroomIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18989366

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

302017
442018
1822019
872020
362021
772022
512023
472024
1042025
1282026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 825 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.