Housing violations · East Flatbush-Erasmus
373 East 28 Street, Brooklyn
11226 · 6 apartments · 3 stories · City Council district 45
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster8
- Roaches4
- Broken doors or locks3
- Leaks and water damage3
- Missing smoke or CO detector2
- Mice or rats1
- No heat or hot water1
- Other repairs1
- Mold1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 10 closed · NYC typical: 87 days
from 8 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19287526
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19287524
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19287525
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19287527
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from eastIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19287528
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the entire apartmentIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19223808
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19223806
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19223807
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at the ceiling in the bathroomIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18163077
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet under wash basin in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17821736
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Apr 14, 2025 · fix by Apr 28, 2025 overdue · Violation #17821745
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17821740
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the kitchenIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17821738
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17821737
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17821734
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17821733
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall at cellarIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17832641
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17821739
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 14, 2025 · fix by May 10, 2025 overdue · Violation #17821741
- BBroken doors or locksM/d law & dept rules & reg. provide means of egress from yard to street by fireproof passageway for which application must be filed for approval,or by unlocked…Issued Jul 1, 2024 · fix by Aug 5, 2024 overdue · rent impairing · Violation #17081505
- BBroken doors or locksRemove the illegal fastening latch capable of padlock at building front entrance gate yardIssued Jul 1, 2024 · fix by Aug 5, 2024 overdue · rent impairing · Violation #17081501
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 12, 2023 · fix by Nov 16, 2023 overdue · Violation #16297733
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at northIssued Oct 12, 2023 · fix by Nov 16, 2023 overdue · Violation #16297738
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.