Housing violations · Morningside Heights
107 Morningside Avenue, Manhattan
10027 · 10 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs14
- Broken doors or locks12
- Peeling paint and plaster9
- Lead paint6
- Mold6
- Leaks and water damage4
- Plumbing, sinks and toilets4
- Roaches1
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 6 closed · NYC typical: 87 days
from 12 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st storyIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19292341
- COther repairsProperly repair or replace the broken or defective lower window sash spring balance at second window from south at west in the 3rd room from east at northIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · Violation #19209021
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 3rd room from east at northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209020
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 5, 2026 · fix by May 31, 2026 overdue · Violation #18874129
- BBroken doors or locksProperly repair with similar material the broken or defective base board heater front plate loose, at building entrance door to vestibule door can cause trip…Issued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18653987
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall and ceiling in the 1st room from east at southIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17821677
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lockset at door leading to fire escape window in the 1st room from east at southIssued Apr 14, 2025 · fix by Apr 20, 2025 overdue · Violation #17821675
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the 1st room from east at southIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17821676
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Apr 14, 2025 · fix by Apr 20, 2025 overdue · Violation #17821673
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Apr 14, 2025 · fix by Apr 13, 2025 overdue · rent impairing · Violation #17832273
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline pipe at wash basin in the bathroomIssued Jan 31, 2025 · fix by Mar 7, 2025 overdue · rent impairing · Violation #17663161
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 3rd room from east at northIssued Jan 31, 2025 · fix by Mar 7, 2025 overdue · Violation #17663160
- COther repairsProperly repair or replace the broken or defective counter balance at lower sash at 1st window from south at west window in the 3rd room from east at northIssued Jan 31, 2025 · fix by Feb 6, 2025 overdue · Violation #17663162
- COther repairsProperly repair or replace the broken or defective counter balance at lower sash at 2nd window frame from south at west in the 3rd room from east at southIssued Jan 31, 2025 · fix by Feb 6, 2025 overdue · Violation #17663163
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline pipe at sink in the kitchenIssued Jan 31, 2025 · fix by Mar 7, 2025 overdue · Violation #17663164
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the foyerIssued Oct 10, 2024 · fix by Nov 14, 2024 overdue · Violation #17340998
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling, in the 3rd room from eastIssued Feb 12, 2024 · fix by Mar 18, 2024 overdue · Violation #16668485
- BPlumbing, sinks and toiletsReplace with new the missing shower head at bathtub in the bathroomIssued Mar 22, 2023 · fix by Apr 26, 2023 overdue · Violation #15828961
- BBroken doors or locksProperly repair the broken or defective lock mechanism at approved gate at fire escape window in the 4th room from eastIssued Mar 22, 2023 · fix by Apr 26, 2023 overdue · Violation #15828960
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from eastIssued Mar 21, 2023 · fix by Apr 25, 2023 overdue · Violation #15764921
- BOther repairsProperly secure the loose water closet in the bathroomIssued Mar 13, 2023 · fix by Apr 17, 2023 overdue · Violation #15764917
- BOther repairsProperly repair the broken or defective unlevel floor in the 3rd room from eastIssued Mar 13, 2023 · fix by Apr 17, 2023 overdue · Violation #15764918
- BLeaks and water damageRepair the broken or defective connection leaky pipe at waste line in the bathroomIssued Mar 13, 2023 · fix by Apr 17, 2023 overdue · Violation #15764916
- BBroken doors or locksReplace with new the broken or defective gasket at lower door of refrigerator in the kitchenIssued Jan 6, 2023 · fix by Feb 10, 2023 overdue · Violation #15643801
- BOther repairsProperly repair the broken or defective window balances on window from south at west wall. in the 1st room from north at eastIssued Jan 6, 2023 · fix by Feb 10, 2023 overdue · Violation #15643803
- BOther repairsProperly repair the broken or defective window balances on 2nd window from south at west wall. in the 3rd room from east at northIssued Jan 6, 2023 · fix by Feb 10, 2023 overdue · Violation #15643806
- BOther repairsProperly repair the broken or defective sill on first window from south at west wall. in the 3rd room from east at southIssued Jan 6, 2023 · fix by Feb 10, 2023 overdue · Violation #15643805
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective repair hinges in the entranceIssued Jan 6, 2023 · fix by Jan 20, 2023 overdue · Violation #15643804
- BOther repairsProperly repair with similar material the broken or defective the wood floor in the 1st room from east at southIssued Jan 6, 2023 · fix by Feb 10, 2023 overdue · Violation #15643800
- BOther repairsProperly repair the broken or defective counter balances at lower sash east window in the 1st room from north at eastIssued Nov 21, 2022 · fix by Dec 26, 2022 overdue · Violation #15573634
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and south walls in the 1st room from north at westIssued Nov 21, 2022 · fix by Dec 26, 2022 overdue · Violation #15573636
- BBroken doors or locksReplace with new the broken or defective gasket at refrigerator door in the kitchenIssued Nov 21, 2022 · fix by Dec 26, 2022 overdue · Violation #15573633
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Nov 21, 2022 · fix by Dec 5, 2022 overdue · Violation #15573631
- BMoldTrace and repair the source and abate the visible mold condition approx 10 sq.ft at ceiling, approx 6 sq.ft at north, approx 4 sq.ft at west wall in the…Issued Aug 19, 2022 · fix by Sep 23, 2022 overdue · Violation #15321813
- CMoldTrace and repair the source and abate the visible mold condition at ceiling and north wall approx 15 sq ft in the bathroomIssued Aug 18, 2022 · fix by Sep 13, 2022 overdue · Violation #15328053
- CMoldTrace and repair the source and abate the visible mold condition at ceiling and south wall approx. 20 sq. ft. in the bathroomIssued Aug 12, 2022 · fix by Sep 7, 2022 overdue · Violation #15317784
- CMoldTrace and repair the source and abate the visible mold condition approximately 10 square feet at ceiling in the bathroomIssued Dec 6, 2021 · fix by Jan 1, 2022 overdue · Violation #14717372
- CPeeling paint and plaster& 309 m/d law abate the nuisance consisting of painted cover to ceiling sprinkler heads in the entire apartmentIssued Feb 12, 2019 · fix by Feb 20, 2019 overdue · Violation #12902773
- BMoldTrace and repair the source and abate the nuisance consisting of mold at ceiling (3 sq ft) and south wall (1 sq ft) in the bathroomIssued Jan 8, 2019 · fix by Feb 12, 2019 overdue · Violation #12841006
- BMoldTrace and repair the source and abate the nuisance consisting of mold at ceiling in the foyerIssued Aug 6, 2018 · fix by Sep 10, 2018 overdue · Violation #12510112
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 11, 2008 · fix by Apr 6, 2008 overdue · Violation #7185774
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 11, 2008 · fix by Apr 6, 2008 overdue · Violation #7185773
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 11, 2008 · fix by Apr 6, 2008 overdue · Violation #7185776
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 11, 2008 · fix by Apr 6, 2008 overdue · Violation #7185772
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 11, 2008 · fix by Apr 6, 2008 overdue · Violation #7185775
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.