Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Manhattanville-West Harlem

171 Morningside Avenue, Manhattan

10027 · 10 apartments · 5 stories · City Council district 9

By · Updated · Data from NYC HPD

C
19open immediately hazardous violations · 190 per 100 apartments
B40Hazardous, open
A24Non-hazardous, open
!83Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company161-171 MORNINGSIDE LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    23
  2. Peeling paint and plaster
    16
  3. Broken doors or locks
    14
  4. Mice or rats
    5
  5. No heat or hot water
    5
  6. Leaks and water damage
    5
  7. Mold
    3
  8. Roaches
    3
  9. Plumbing, sinks and toilets
    3
  10. Missing smoke or CO detector
    3
  11. Electrical problems
    2
  12. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C48 days
from 9 closed · NYC typical: 87 days
B85 days
from 9 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 13, 2025 · fix by Dec 9, 2025 overdue · Violation #18363299
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling ,north, south and west walls in the bathroomIssued Jun 3, 2025 · fix by Jul 8, 2025 overdue · Violation #17933013
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at upper sash window 1st window from south at west wall in the 5th room from eastIssued Jun 3, 2025 · fix by Jul 8, 2025 overdue · Violation #17933014
  • C
    Broken doors or locksProvide ready access to buildings heating system boiler room door locked at basementIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · Violation #17608985
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 13, 2025 · fix by Feb 8, 2025 overdue · Violation #17608986
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 13, 2025 · fix by Jan 10, 2025 overdue · rent impairing · Violation #17608983
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 13, 2025 · fix by Jan 10, 2025 overdue · rent impairing · Violation #17608987
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Dec 16, 2024 · fix by Dec 22, 2024 overdue · Violation #17552696
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 16, 2024 · fix by Dec 14, 2024 overdue · rent impairing · Violation #17552695
  • C
    Broken doors or locksProvide ready access to buildings heating system door lock to basement at boiler roomIssued Dec 10, 2024 · fix by Dec 16, 2024 overdue · Violation #17542996
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 10, 2024 · fix by Dec 10, 2024 overdue · rent impairing · Violation #17542995
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 6 sq ft at wood surface under sink at base cabinet at south wall in the kitchenIssued Nov 2, 2023 · fix by Dec 7, 2023 overdue · Violation #16361959
  • B
    Other repairsProperly repair with similar material the broken or defective masonary landing at building front stairs , 1st storyIssued Aug 23, 2023 · fix by Sep 27, 2023 overdue · Violation #16178960
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 5, 2023 · fix by Jul 31, 2023 overdue · Violation #16074060
  • B
    Other repairsProperly repair the broken or defective mechanical ventilation system at ceiling in the bathroomIssued Jan 3, 2023 · fix by Feb 7, 2023 overdue · Violation #15640684
  • C
    Mice or ratsAbate the infestation consisting of miceIssued Oct 21, 2021 · fix by Nov 16, 2021 overdue · Violation #14637403
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 21, 2021 · fix by Nov 16, 2021 overdue · Violation #14637351
  • C
    Broken doors or locksArrange and make self-closing the doors ,, in the entranceIssued Apr 6, 2021 · fix by May 2, 2021 overdue · Violation #14098951
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 5, 2021 · fix by May 1, 2021 overdue · Violation #14098954
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 5, 2021 · fix by May 1, 2021 overdue · Violation #14098953
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector inoperableIssued Apr 5, 2021 · fix by May 10, 2021 overdue · Violation #14098952
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). inoperableIssued Apr 5, 2021 · fix by May 10, 2021 overdue · Violation #14098950
  • C
    MoldTrace and repair the source and abate the visible mold condition at north south east west wall and ceiling in the bathroomIssued Apr 5, 2021 · fix by May 1, 2021 overdue · Violation #14098956
  • B
    Other repairsProperly repair the broken or defective mechanical ventelation system at ceiling in the bathroomIssued Apr 5, 2021 · fix by May 10, 2021 overdue · Violation #14098949
  • C
    Broken doors or locksProvide ready access to buildings heating system door lock at cellarIssued Jan 7, 2021 · fix by Jan 13, 2021 overdue · Violation #13941808
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 7, 2021 · fix by Jan 7, 2021 overdue · rent impairing · Violation #13941807
  • B
    Broken doors or locksReplace with new the broken or defective metal fireproof self closing door in the entranceIssued May 11, 2018 · fix by Jun 15, 2018 overdue · Violation #12375599
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from eastIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375665
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375571
  • B
    Plumbing, sinks and toiletsReplace with new the broken or defective base cabinet sink in the kitchenIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375575
  • B
    Electrical problemsProperly repair the broken or defective electrical outlet at south wall in the kitchenIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375583
  • B
    Other repairsReplace with new the broken or defective wood cabinets in the kitchenIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375585
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic tile walls throughout in the bathroomIssued May 10, 2018 · fix by May 18, 2018 overdue · Violation #12375615
  • B
    Other repairsProperly repair with similar material the broken or defective mechanical ventilator in the bathroomIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375619
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the bathroomIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375621
  • B
    Electrical problemsProperly repair the broken or defective electrical outlet at north wall in the bathroomIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375622
  • B
    Broken doors or locksProperly repair the broken or defective handle to entrance door in the bathroomIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375628
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375637
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the private hallwayIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375638
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375642
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375658
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375660
  • B
    Broken doors or locksProperly repair the broken or defective closet doors in the 2nd room from eastIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375661
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375664
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from eastIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12375662
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east and south walls in the bathroomIssued Apr 27, 2018 · fix by Jun 1, 2018 overdue · Violation #12353191
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 27, 2018 · fix by Jun 1, 2018 overdue · Violation #12353193
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic walls tiles at south, west and north walls in the bathroomIssued Feb 20, 2018 · fix by Mar 27, 2018 overdue · Violation #12241205
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Jul 21, 2017 · fix by Aug 25, 2017 overdue · Violation #11885529
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles on the south west and north walls in the bathroomIssued Jul 21, 2017 · fix by Aug 25, 2017 overdue · Violation #11885528
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner at 2nd story balcony at building frontIssued Jul 18, 2017 · fix by Aug 22, 2017 overdue · Violation #11880939
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner at 5th story balcony at building frontIssued Jul 18, 2017 · fix by Aug 22, 2017 overdue · Violation #11880941
  • B
    Other repairsSection 27-2040 adm code provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day…Issued Nov 9, 2016 · fix by Dec 14, 2016 overdue · Violation #11490553
  • B
    Other repairsSection 27-2005 adm code properly repair with similar material the broken or defective south-east wood window stool in the 1st room from eastIssued Jun 1, 2016 · fix by Jul 6, 2016 overdue · Violation #11253247
  • B
    Broken doors or locksSection 27-2005 adm code replace with new the broken or defective room entrance door in the 3rd room from eastIssued May 31, 2016 · fix by Jul 5, 2016 overdue · Violation #11253258
  • B
    Broken doors or locksSection 27-2005 adm code replace with new the missing door lock. in the 4th room from eastIssued Jun 25, 2015 · fix by Jul 30, 2015 overdue · Violation #10756843
  • B
    Broken doors or locksSection 27-2005 adm code properly repair the broken or defective door frame. in the 4th room from eastIssued Jun 25, 2015 · fix by Jul 30, 2015 overdue · Violation #10756841
  • B
    Other repairsSection 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles, in the entire apartmentIssued Jun 25, 2015 · fix by Jul 30, 2015 overdue · Violation #10756847
  • B
    Broken doors or locksSection 27-2005 adm code properly repair the broken or defective closet door . in the kitchenIssued Jun 25, 2015 · fix by Jul 30, 2015 overdue · Violation #10756840

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

92017
282018
22019
172021
32022
212023
72024
162025
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 219 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.