Housing violations · East Harlem (North)
1461 5 Avenue, Manhattan
10035 · 8 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster24
- Other repairs19
- Leaks and water damage12
- Broken doors or locks12
- Mold7
- Mice or rats7
- Missing smoke or CO detector4
- Roaches3
- Plumbing, sinks and toilets2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 9 closed · NYC typical: 87 days
from 7 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall at public hall stairs, 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304088
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall at public hall stairs, 2nd storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304085
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and west wall at public hall stairs, 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304086
- CBroken doors or locksProperly repair or replace the broken or defective locking device at building entrance doorIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19304089
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at north and west walls at public hall stairs, 4th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304076
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north and west walls at public hall stairs, 4th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304078
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at north and west walls at public hall stairs, 3rd storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304079
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north and west walls at public hall stairs, 3rd storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304081
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at east wall at public hall stairs, 5th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304073
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall at public hall stairs, 5th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304075
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and west wall at public hall stairs, 2nd storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304083
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and west wall at public hall stairs, 3rd storyIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19280165
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling. at public hall stairs, 3rd storyIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19280164
- COther repairsProperly repair with similar material the broken or defective exterior concrete keystone above front center window at building, 4th styIssued Sep 3, 2026 · fix by Sep 9, 2026 overdue · Violation #19176917
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at west wall at public hall stairs, 2nd storyIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176913
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak west wall at public hall stairs, 3rd storyIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176912
- BMoldTrace and repair the source and abate the visible mold condition less than 5 square feet at ceiling and south wall in the kitchenIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19087767
- BBroken doors or locksProperly repair or replace the broken or defective latch set at bulkhead doorIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18807729
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective at bulkheadIssued Apr 23, 2026 · fix by May 7, 2026 overdue · Violation #18807728
- BBroken doors or locksProperly repair or replace the broken or defective latch set at door at bulkheadIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18788098
- BBroken doors or locksProperly repair or replace the broken or defective latch set at building entrance door at public hall, 1st storyIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18788100
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead doorIssued Apr 15, 2026 · fix by Apr 29, 2026 overdue · Violation #18788097
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18713103
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the kitchenIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · rent impairing · Violation #18713100
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18713102
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18713104
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 19, 2026 · fix by Apr 14, 2026 overdue · Violation #18713105
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Aug 29, 2025 · fix by Oct 3, 2025 overdue · Violation #18192728
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the kitchenIssued Aug 29, 2025 · fix by Oct 3, 2025 overdue · Violation #18192727
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 25, 2025 · fix by Sep 20, 2025 overdue · rent impairing · Violation #18185931
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall in the bathroomIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18180542
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at southIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17839447
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 3rd room from eastIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17839448
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at northIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17839441
- BOther repairsProperly repair with similar material the broken or defective grout at ceramic tiles at floor in the bathroomIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17839444
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 23, 2025 · fix by May 19, 2025 overdue · Violation #17839439
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at south wall in the kitchenIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17839449
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17839445
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entranceIssued Apr 23, 2025 · fix by May 7, 2025 overdue · Violation #17839440
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at south wall in the 1st room from east at southIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17839446
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at east wall in the 1st room from east at northIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17839442
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 11, 2024 · fix by Nov 15, 2024 overdue · Violation #17335865
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17328517
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17328515
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17328516
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at north wall in the bathroomIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17328518
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17328519
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 9, 2024 · fix by Nov 4, 2024 overdue · Violation #17328520
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 9, 2024 · fix by Nov 4, 2024 overdue · Violation #17328521
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yardIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17328522
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2024 · fix by Nov 2, 2024 overdue · Violation #17327634
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 7, 2024 · fix by Nov 11, 2024 overdue · Violation #17327635
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued Oct 1, 2024 · fix by Nov 5, 2024 overdue · rent impairing · Violation #17295998
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 1, 2024 · fix by Nov 5, 2024 overdue · Violation #17296000
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at wash basin in the bathroomIssued Oct 1, 2024 · fix by Nov 5, 2024 overdue · rent impairing · Violation #17296001
- BBroken doors or locksProperly repair or replace the broken or defective top and bottom refigerator door seal in the kitchenIssued Oct 1, 2024 · fix by Nov 5, 2024 overdue · Violation #17295996
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 1, 2024 · fix by Nov 5, 2024 overdue · Violation #17295997
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective roof doorIssued Jun 25, 2024 · fix by Jul 9, 2024 overdue · Violation #17071603
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at 1st public hall bulkhead from northIssued May 14, 2024 · fix by May 28, 2024 overdue · Violation #16966820
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective frame in the entranceIssued Apr 28, 2023 · fix by May 12, 2023 overdue · Violation #15940608
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.