Housing violations · Harlem (South)
11 Mt Morris Park West, Manhattan
10027 · 17 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
25 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs134
- Peeling paint and plaster83
- Leaks and water damage14
- Missing smoke or CO detector13
- Broken doors or locks11
- Plumbing, sinks and toilets9
- Electrical problems7
- Bedbugs6
- Lead paint5
- No heat or hot water2
- Mold2
- Mice or rats2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 14 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building front entrance door at public hall, 1st storyIssued Oct 16, 2025 · fix by Oct 30, 2025 overdue · Violation #18306481
- COther repairsCleanse and disinfect to the satisfaction of this department after removing the pet feces at all community bathrooms at community bathroomIssued Oct 16, 2025 · fix by Oct 22, 2025 overdue · rent impairing · Violation #18301003
- COther repairsProperly repair or replace the broken or defective window at upper and lower sash at community bathroom, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293650
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at south wall at public hall, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294156
- COther repairsProperly repair with similar material the broken or defective wood treads and risers one through eighth up from bottom at public hall stairs, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294144
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls at community bathroom, 2nd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293682
- COther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and walls at public hall, 2nd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293671
- COther repairsProperly repair with similar material the broken or defective wood floor at community bathroom, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293641
- COther repairsReplace the broken or defective watercloset at community bathroom, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18293646
- CPlumbing, sinks and toiletsRepair the broken or defective connection wastepipe at sink in the kitchenetteIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299644
- COther repairsReplace the broken or defective watercloset at community bathroom, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18294235
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color broken plaster at walls and ceiling at community bathroom, 2nd storyIssued Oct 15, 2025 · fix by Nov 19, 2025 overdue · Violation #18301285
- COther repairsProperly repair or replace the broken or defective window upper and lower sash at community bathroom, 2nd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293683
- COther repairsProperly repair with similar material the broken or defective fire retardant material at all walls and ceiling at public hall, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293634
- COther repairsProperly repair with similar material the broken or defective wood floor at public hall, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293627
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall at community bathroom, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293639
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical light switch at east wall at community bathroom, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293654
- COther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and all walls at public hall, 4th storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294254
- CLeaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 4th storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18294270
- BOther repairsProvide 3 extra sprinkler heads and suitable wrench for emergency purposes at o.s.y. valve of sprinkler in accordance with the rules and regulations of this…Issued Oct 15, 2025 · fix by Nov 19, 2025 overdue · Violation #18294293
- COther repairsProperly repair or replace the broken or defective windows at upper and lower sashes in the roomIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299622
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls at community bathroom, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293649
- COther repairsProperly repair or replace the broken or defective stringer at north wall at public hall stairs, 2nd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293658
- CPlumbing, sinks and toiletsReplace the broken or defective bathtub at community bathroom, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18294207
- COther repairsProperly repair with similar material the broken or defective wood treads and risers one through ten up from bottom at public hall stairs, 2nd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293664
- COther repairsProvide an adequate supply of gas to the fixtures at range at community kitchen, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18294164
- COther repairsProperly repair with similar material the broken or defective wood floor in the roomIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299627
- COther repairsReplace the broken or defective watercloset at community bathroom, 4th storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18294287
- COther repairsProperly repair with similar material the broken or defective wood floor at community bathroom, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294210
- COther repairsProperly repair or replace the broken or defective two windows upper and lower sash in the roomIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299638
- COther repairsProperly repair with similar material the broken or defective wood floor at public hall, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294116
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall at community kitchen, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294197
- COther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and walls at public hall, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294119
- COther repairsProperly repair with similar material the broken or defective wood floor at community bathroom, 4th storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294281
- BOther repairsProvide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler systemIssued Oct 15, 2025 · fix by Nov 19, 2025 overdue · Violation #18294290
- COther repairsProperly repair with similar material the broken or defective wood floor in the roomIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299642
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the roomIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299639
- COther repairsProperly repair with similar material the broken or defective wood floor in the roomIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299635
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the roomIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299634
- COther repairsReplace with new the missing glass pane at upper and lower sash at windows in the roomIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299626
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the roomIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18299616
- CPlumbing, sinks and toiletsReplace the broken or defective bathtub at community bathroom, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18293640
- COther repairsProperly repair with similar material the broken or defective seventeen wood treads and risers from bottom up at public hall stairs, 1st storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293637
- COther repairsProperly repair with similar material the broken or defective cement floor at community bathroom, 2nd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293679
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures at sink at community kitchen, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18294171
- CPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at sink at community kitchen, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18294192
- CPlumbing, sinks and toiletsReplace the broken or defective sink at community kitchen, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18294194
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls at community bathroom, 4th storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294278
- COther repairsProperly repair or replace the broken or defective window upper and lower sash at community bathroom, 3rd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294241
- COther repairsProperly repair with similar material the broken or defective wood floor at public hall, 2nd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18293674
- CNo heat or hot waterProvide hot water at all hot water fixtures at community bathroomIssued Oct 14, 2025 · fix by Oct 9, 2025 overdue · rent impairing · Violation #18299585
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Oct 14, 2025 · fix by Oct 20, 2025 overdue · Violation #18299594
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west wall at public hall, 2nd storyIssued Jan 24, 2024 · fix by Feb 28, 2024 overdue · Violation #16623332
- BOther repairsProperly repair with similar material the broken or defective fire retardent material at the ceiling and north wall at bulkhead at public hall, 5th storyIssued Oct 6, 2023 · fix by Nov 10, 2023 overdue · Violation #16290119
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor at public hall, 1st storyIssued Oct 6, 2023 · fix by Nov 10, 2023 overdue · Violation #16290120
- BLeaks and water damageRepair the roof so that it will not leak at ceiling at bulkhead at public hall, 5th storyIssued Oct 6, 2023 · fix by Nov 10, 2023 overdue · rent impairing · Violation #16290117
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceilng and all wallsIssued Oct 25, 2019 · fix by Nov 2, 2019 overdue · Violation #13351856
- COther repairsReplace with new the missing ceramic tiles at north and east walls at 2nd community bathroom from east, 3rd storyIssued Oct 25, 2019 · fix by Nov 2, 2019 overdue · Violation #13351717
- COther repairsProperly repair with similar material the broken or defective wood floorIssued Oct 25, 2019 · fix by Nov 2, 2019 overdue · Violation #13351846
- BMissing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. at public hall, 4th storyIssued Oct 25, 2019 · fix by Nov 29, 2019 overdue · Violation #13351880
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.