Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (South)

22 Mt Morris Park West, Manhattan

10027 · 22 apartments · 7 stories · City Council district 9

By · Updated · Data from NYC HPD

C
15open immediately hazardous violations · 68 per 100 apartments
B27Hazardous, open
A18Non-hazardous, open
!33Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

4 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning company22 PARK VIEW LLC
Landlord (head officer or owner)Larry Hirschfield

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    13
  2. Other repairs
    10
  3. Plumbing, sinks and toilets
    10
  4. Mice or rats
    8
  5. Leaks and water damage
    7
  6. Missing smoke or CO detector
    4
  7. Broken doors or locks
    4
  8. Mold
    3
  9. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C100 days
from 86 closed · NYC typical: 84 days
B209 days
from 180 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19366372
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19366371
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19366370
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344646
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19344644
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · rent impairing · Violation #19344643
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling ceiling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344642
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub. in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19344647
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze by way of reglazing the bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344645
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · rent impairing · Violation #19320269
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19320270
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling and walls in the bathroomIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19220450
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19213664
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19213660
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at westIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19213650
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub in the 1st bathroom from northIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19213630
  • C
    Other repairsProperly repair or replace the broken or defective shut-off valve at radiator at west wall in the 1st room from north at westIssued Sep 11, 2026 · fix by Sep 17, 2026 overdue · Violation #19213642
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tile at floor in the kitchenIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19213640
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19213636
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 11, 2026 · fix by Oct 7, 2026 overdue · Violation #19213604
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 11, 2026 · fix by Oct 7, 2026 overdue · Violation #19213596
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 11, 2026 · fix by Oct 7, 2026 overdue · Violation #19213679
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective mechanical stopper at bathtub in the 1st bathroom from northIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19213632
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at sink in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19169256
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19169260
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169262
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169263
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st storyIssued Aug 31, 2026 · fix by Sep 14, 2026 overdue · Violation #19169264
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at vestibule door at public hall, 1st storyIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169265
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18807039
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 6th room from northIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18807045
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 6th room from northIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18807044
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18807051
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18788161
  • C
    MoldTrace and repair the source and abate the visible mold condition approx 10 square feet at ceiling in the bathroomIssued Apr 14, 2026 · fix by May 10, 2026 overdue · Violation #18792345
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 13, 2026 · fix by May 9, 2026 overdue · Violation #18779474
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st bathroom from northIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18136391
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective floor base cabinet at sink in the kitchenIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18136393
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the 1st bathroom from northIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18136389
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the 2nd bathroom from northIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18136384
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall and ceiling in the private hallwayIssued Sep 16, 2021 · fix by Oct 21, 2021 overdue · Violation #14560489
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Sep 16, 2021 · fix by Oct 21, 2021 overdue · Violation #14560492

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

242017
52018
402019
292020
992021
432022
932023
1542024
602025
1122026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 803 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.