Housing violations · Harlem (South)
24 Mt Morris Park West, Manhattan
10027 · 14 apartments · 7 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs6
- Mold5
- Peeling paint and plaster3
- Broken doors or locks1
- Roaches1
- Leaks and water damage1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 27 closed · NYC typical: 87 days
from 12 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10sqft at ceiling in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19377401
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the bathroomIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19313445
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19313444
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19186593
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19068930
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jul 16, 2026 · fix by Jul 22, 2026 overdue · Violation #19068929
- BOther repairsProperly repair or replace the broken or defective bell/buzzer intercom system from building entrance to panel at west wall in the 1st room from eastIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18802130
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft. at ceiling, west wall, south wall, and east wall in the bathroomIssued Apr 14, 2026 · fix by May 10, 2026 overdue · Violation #18783829
- BOther repairsProperly repair or replace the broken or defective buzzer at building entrance to buzzer at west wall in the 1st room from eastIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18783825
- BOther repairsProperly repair or replace the broken or defective intercom system from entrance to building to intercom box at west wall in the 1st room from eastIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772692
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17881864
- BMoldTrace and repair the source and abate the visible mold condition (8 sq ft) at the ceiling in the bathroomIssued Sep 15, 2022 · fix by Oct 20, 2022 overdue · Violation #15378080
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.