Housing violations · Washington Heights (North)
59 Nagle Avenue, Manhattan
10040 · 25 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster29
- Other repairs9
- Leaks and water damage7
- Missing smoke or CO detector2
- Mold1
- Roaches1
- Mice or rats1
- Bedbugs1
- No heat or hot water1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 42 closed · NYC typical: 87 days
from 49 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353305
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353306
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Sep 12, 2025 · fix by Sep 18, 2025 overdue · rent impairing · Violation #18216261
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Aug 26, 2025 · fix by Sep 1, 2025 overdue · rent impairing · Violation #18177900
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18176987
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling, west wall and south wall in the bathroomIssued Sep 26, 2024 · fix by Oct 31, 2024 overdue · Violation #17299017
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 19, 2024 · fix by Sep 14, 2024 overdue · Violation #17199448
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Aug 8, 2024 · fix by Sep 12, 2024 overdue · Violation #17124128
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Aug 8, 2024 · fix by Sep 12, 2024 overdue · Violation #17124135
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 28, 2023 · fix by Sep 23, 2023 overdue · Violation #16183777
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceilng in the bathroomIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183772
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183778
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183781
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183774
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183779
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183775
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and west wall in the bathroomIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183782
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Feb 23, 2021 · fix by Mar 30, 2021 overdue · Violation #14032055
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12377016
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 10, 2018 · fix by Jun 14, 2018 overdue · Violation #12377019
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued May 7, 2018 · fix by Jun 11, 2018 overdue · Violation #12369552
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the bathroomIssued May 7, 2018 · fix by Jun 11, 2018 overdue · Violation #12369555
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 2, 2018 · fix by Feb 2, 2018 overdue · rent impairing · Violation #12222360
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 3rd room from east at northIssued Nov 1, 2017 · fix by Nov 9, 2017 overdue · Violation #12043924
- CPlumbing, sinks and toiletsRemove all obstructions and repair all defects in bathtub in the bathroomIssued Nov 1, 2017 · fix by Nov 9, 2017 overdue · rent impairing · Violation #12043889
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east at northIssued Nov 1, 2017 · fix by Nov 9, 2017 overdue · Violation #12043907
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 2, 2017 · fix by Nov 6, 2017 overdue · Violation #11993018
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 26, 2017 · fix by Oct 4, 2017 overdue · Violation #11982141
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Sep 26, 2017 · fix by Oct 4, 2017 overdue · Violation #11982134
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 1st room from eastIssued Feb 21, 2017 · fix by Mar 28, 2017 overdue · Violation #11654533
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 5th room from eastIssued Feb 21, 2017 · fix by Mar 28, 2017 overdue · Violation #11654549
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at westIssued Aug 8, 2016 · fix by Sep 12, 2016 overdue · Violation #11342189
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the 4th room from north at westIssued Aug 8, 2016 · fix by Sep 12, 2016 overdue · Violation #11342191
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from northIssued Aug 5, 2016 · fix by Sep 9, 2016 overdue · Violation #11339965
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Aug 10, 2015 · fix by Sep 14, 2015 overdue · Violation #10808985
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Jul 7, 2014 · fix by Aug 11, 2014 overdue · Violation #10294729
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Apr 7, 2014 · fix by May 12, 2014 overdue · Violation #10198274
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from eastIssued Apr 7, 2014 · fix by May 12, 2014 overdue · Violation #10198256
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from eastIssued Apr 7, 2014 · fix by May 12, 2014 overdue · Violation #10198253
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.