Housing violations · Inwood
37 Payson Avenue, Manhattan
10034 · 60 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster27
- Other repairs22
- Mice or rats11
- Roaches10
- Missing smoke or CO detector9
- Mold8
- Broken doors or locks6
- Lead paint5
- No heat or hot water4
- Leaks and water damage4
- Plumbing, sinks and toilets4
- Electrical problems4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 16 closed · NYC typical: 87 days
from 48 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19171502
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19171504
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19171505
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171503
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 5, 2026 · fix by Jul 1, 2026 overdue · Violation #18989053
- BOther repairsProperly repair with similar material the broken or defective wood flooring in the kitchenIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18989048
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at east window frame in the bathroomIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18947593
- BMoldTrace and repair the source and abate the visible mold condition less than ten square feet at north wall and window frame in the bathroomIssued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18799269
- COther repairs& 309 m/d law abate the nuisance consisting of vinyl floor tiles in the kitchenIssued Apr 16, 2026 · fix by Apr 22, 2026 overdue · Violation #18787029
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18787031
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18787030
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at celing , north , west and east walls in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787028
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at ceiling in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787027
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Feb 2, 2026 · fix by Feb 28, 2026 overdue · rent impairing · Violation #18609622
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 2, 2026 · fix by Feb 1, 2026 overdue · rent impairing · Violation #18609621
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 2, 2026 · fix by Feb 1, 2026 overdue · rent impairing · Violation #18609619
- COther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Jan 20, 2026 · fix by Jan 26, 2026 overdue · Violation #18578739
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from northIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18578742
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18578738
- BOther repairsProperly repair or replace the broken or defective intercom systemIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18578745
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18578740
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18578741
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from northIssued Dec 31, 2025 · fix by Feb 4, 2026 overdue · Violation #18538921
- BOther repairsProperly repair or replace the broken or defective vinyl floor tiles in the 3rd room from northIssued Dec 31, 2025 · fix by Feb 4, 2026 overdue · Violation #18538922
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.f at ceiling, north and west walls in the bathroomIssued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18522425
- BOther repairsProperly repair with similar material the broken or defective wood sub floor in the 3rd room from eastIssued Dec 18, 2025 · fix by Jan 22, 2026 overdue · Violation #18510617
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 17, 2025 · fix by Jan 12, 2026 overdue · Violation #18510039
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510037
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510625
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 17, 2025 · fix by Jan 12, 2026 overdue · Violation #18510623
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510621
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Dec 17, 2025 · fix by Dec 23, 2025 overdue · Violation #18510032
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Dec 17, 2025 · fix by Dec 23, 2025 overdue · Violation #18510613
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510612
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 17, 2025 · fix by Dec 17, 2025 overdue · rent impairing · Violation #18510031
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from eastIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510036
- BOther repairsProperly repair with similar material the broken or defective wood sub floor in the 3rd room from eastIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510033
- COther repairsProperly repair or replace the broken or defective glass pane at upper window sash in the bathroomIssued Dec 17, 2025 · fix by Dec 23, 2025 overdue · Violation #18510619
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510624
- COther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Dec 17, 2025 · fix by Dec 23, 2025 overdue · Violation #18510614
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroomIssued Dec 17, 2025 · fix by Dec 23, 2025 overdue · Violation #18510615
- BPlumbing, sinks and toiletsProperly secure the loose wash basin at east wall in the bathroomIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510620
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510042
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510041
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 17, 2025 · fix by Jan 12, 2026 overdue · Violation #18510040
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash at north wall in the kitchenIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510038
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 8, 2025 · fix by Dec 7, 2025 overdue · rent impairing · Violation #18488612
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 21, 2025 · fix by Sep 16, 2025 overdue · rent impairing · Violation #18175708
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 21, 2025 · fix by Sep 16, 2025 overdue · Violation #18175709
- BOther repairsProperly repair with similar material the broken or defective hard wood floor in the private hallwayIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18175706
- CLead paintReplace or repair the self-closing doors that is missing or defective latch set at fire door leading to the east yard at public hall, 1st storyIssued Aug 13, 2025 · fix by Aug 27, 2025 overdue · Violation #18162955
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 17, 2025 · fix by Jul 13, 2025 overdue · Violation #18011279
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 17, 2025 · fix by Jul 13, 2025 overdue · Violation #18011278
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 17, 2025 · fix by Jul 13, 2025 overdue · Violation #18011275
- CLead paintReplace or repair the self-closing doors that is missing or defective latch set at fire door leading to east yard at public hall, 1st storyIssued May 2, 2025 · fix by May 16, 2025 overdue · Violation #17873255
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at north and west walls in the 2nd room from northIssued Apr 16, 2025 · fix by May 21, 2025 overdue · Violation #17828226
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at east and south walls in the 4th room from northIssued Apr 16, 2025 · fix by May 21, 2025 overdue · Violation #17828225
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Dec 31, 2024 · fix by Jan 24, 2025 overdue · Violation #17591596
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 31, 2024 · fix by Jan 24, 2025 overdue · Violation #17591595
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq.ft at north wall and east wall in the 2nd room from northIssued Dec 31, 2024 · fix by Feb 4, 2025 overdue · Violation #17586821
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.