Housing violations · Inwood
110 Post Avenue, Manhattan
10034 · 72 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster16
- Leaks and water damage12
- Other repairs6
- Lead paint5
- Mice or rats3
- Missing smoke or CO detector2
- Roaches1
- Broken doors or locks1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 32 closed · NYC typical: 87 days
from 72 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · rent impairing · Violation #19050639
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jun 5, 2026 · fix by Jul 1, 2026 overdue · rent impairing · Violation #18988665
- BOther repairsProperly repair with similar material the broken or defective grout at west wall in the bathroomIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18736541
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18736537
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18736538
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18736539
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18736540
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 20, 2025 · fix by Sep 15, 2025 overdue · Violation #18168580
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash north wall in the 5th room from eastIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168574
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from northIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168573
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168572
- BOther repairsProperly repair or replace the broken or defective counter balance at upper and lower window sash in the 1st room from northIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168571
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168569
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the private hallwayIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168568
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168567
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168564
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168563
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168561
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, in the 1st bathroom from north at eastIssued May 29, 2025 · fix by Jun 4, 2025 overdue · Violation #17918606
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 10, 2025 · fix by Feb 14, 2025 overdue · Violation #17611431
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 10, 2025 · fix by Feb 14, 2025 overdue · Violation #17611430
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jan 10, 2025 · fix by Feb 14, 2025 overdue · Violation #17611429
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Dec 24, 2024 · fix by Dec 28, 2024 overdue · Violation #17577949
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Dec 24, 2024 · fix by Dec 28, 2024 overdue · Violation #17577950
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from northIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17364522
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17364520
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and south walls in the 2nd room from eastIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880006
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the 1st bathroom from northIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880007
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallwayIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880008
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd bathroom from northIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880015
- BBroken doors or locksReplace with new the missing wood door in the 1st room from eastIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880013
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from eastIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880012
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880009
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the foyerIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16879998
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at. ceiling and east wall in the foyerIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16879999
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective procelian enamal finish by method of reglazing the bathtub in the 1st bathroom from northIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880001
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880005
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 1st room from eastIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880011
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from northIssued Apr 16, 2024 · fix by May 21, 2024 overdue · Violation #16880014
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 19, 2023 · fix by Aug 23, 2023 overdue · Violation #16097767
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroomIssued Jul 19, 2023 · fix by Aug 23, 2023 overdue · Violation #16097768
- BMice or ratsAbate the nuisance consisting of vermin mice in the entire apartmentIssued Oct 21, 2020 · fix by Nov 25, 2020 overdue · Violation #4490844
- BMice or ratsAbate the nuisance consisting of vermin mice & roaches kitchen & bathroom 5 styIssued Oct 21, 2020 · fix by Nov 25, 2020 overdue · Violation #2715201
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls kitchen 5 styIssued Oct 21, 2020 · fix by Nov 25, 2020 overdue · Violation #2715198
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.