Housing violations · Inwood
25 Post Avenue, Manhattan
10034 · 49 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs14
- Peeling paint and plaster12
- Roaches10
- Mice or rats7
- Lead paint5
- Broken doors or locks3
- Electrical problems3
- Plumbing, sinks and toilets2
- Mold2
- Leaks and water damage1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 8 closed · NYC typical: 87 days
from 39 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, north, south, east and west walls in the 3rd room from northIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18989033
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electric wires at ceiling in the bathroomIssued Feb 25, 2026 · fix by Apr 1, 2026 overdue · Violation #18652000
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Feb 25, 2026 · fix by Apr 1, 2026 overdue · Violation #18652001
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at south wall in the bathroomIssued Feb 25, 2026 · fix by Apr 1, 2026 overdue · Violation #18652002
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroomIssued Feb 25, 2026 · fix by Mar 3, 2026 overdue · Violation #18652003
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from north at eastIssued Feb 25, 2026 · fix by Apr 1, 2026 overdue · Violation #18652007
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 1st room from north at eastIssued Feb 25, 2026 · fix by Apr 1, 2026 overdue · Violation #18652005
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at eastIssued Feb 25, 2026 · fix by Apr 1, 2026 overdue · Violation #18652006
- BBroken doors or locksRefit the door at entrance in the 1st room from north at eastIssued Feb 25, 2026 · fix by Apr 1, 2026 overdue · Violation #18652009
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from eastIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651993
- BOther repairsProvide upper escutcheon plate at heat riser pipe at south wall in the kitchenIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651987
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from northIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651996
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from northIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651995
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 1st room from eastIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651994
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from eastIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651992
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651990
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and west wall in the foyerIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651989
- BElectrical problemsProperly repair or replace the broken or defective electrical wall outlet at north wall in the kitchenIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651986
- BBroken doors or locksRefit closet door at east wall in the foyerIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651991
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchenIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651985
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the private hallwayIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651999
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651998
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 1st room from northIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651997
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 19, 2026 · fix by Mar 17, 2026 overdue · Violation #18651981
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18651984
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Feb 9, 2026 · fix by Mar 5, 2026 overdue · Violation #18630715
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 6, 2026 · fix by Mar 2, 2026 overdue · Violation #18630640
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 6, 2026 · fix by Mar 2, 2026 overdue · Violation #18630644
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 6, 2026 · fix by Mar 4, 2026 overdue · Violation #18621391
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 6, 2026 · fix by Mar 2, 2026 overdue · Violation #18630641
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wiring at west wall in the entire apartmentIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558606
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 9, 2026 · fix by Feb 4, 2026 overdue · Violation #18558607
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 9, 2026 · fix by Feb 4, 2026 overdue · Violation #18558605
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and south walls in the bathroomIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18355958
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the 5th room from northIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18355959
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the 3rd room from northIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18355960
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2025 · fix by Dec 6, 2025 overdue · Violation #18355961
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 square feet at ceiling and all walls in the bathroomIssued Jun 10, 2025 · fix by Jul 6, 2025 overdue · Violation #17963807
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Nov 1, 2023 · fix by Dec 6, 2023 overdue · Violation #12235390
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Nov 1, 2023 · fix by Dec 6, 2023 overdue · Violation #12260755
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings through-out. in the entire apartmentIssued Nov 1, 2023 · fix by Dec 6, 2023 overdue · Violation #12411256
- BPlumbing, sinks and toiletsRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and behind bathtub in the bathroomIssued Nov 1, 2023 · fix by Dec 6, 2023 overdue · Violation #12425149
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 25, 2021 · fix by Nov 20, 2021 overdue · Violation #14639201
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 13, 2021 · fix by Oct 9, 2021 overdue · Violation #14554145
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 13, 2021 · fix by Oct 9, 2021 overdue · Violation #14554146
- CRoachesAbate the infestation consisting of roachesIssued Jul 31, 2019 · fix by Aug 21, 2019 overdue · Violation #13198940
- CMice or ratsAbate the infestation consisting of miceIssued Jul 31, 2019 · fix by Aug 21, 2019 overdue · Violation #13198939
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 6, 2019 · fix by Jun 27, 2019 overdue · Violation #13101377
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 6, 2019 · fix by Jun 27, 2019 overdue · Violation #13101376
- BMoldTrace and repair the source and abate the nuisance consisting of mold at ceiling. in the kitchenIssued Jun 4, 2018 · fix by Jul 9, 2018 overdue · Violation #12411270
- BMice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Mar 1, 2018 · fix by Apr 5, 2018 overdue · Violation #12260752
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Mar 1, 2018 · fix by Apr 5, 2018 overdue · Violation #12260751
- BMice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Mar 1, 2018 · fix by Apr 5, 2018 overdue · Violation #12260746
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Mar 1, 2018 · fix by Apr 5, 2018 overdue · Violation #12260745
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Mar 1, 2018 · fix by Apr 5, 2018 overdue · Violation #12260758
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 15, 2017 · fix by Dec 13, 2017 overdue · Violation #12071347
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.